Support #11364
[SCP ID :##5640##] : MBI DR - Switching
Status: | Work Completed-End life cycle | Start date: | November 15, 2020 | |
---|---|---|---|---|
Priority: | High | Due date: | ||
Assignee: | Zahir Abd Latif | % Done: | 100% | |
Category: | - | Spent time: | - | |
Target version: | - |
Description
Hi,
Kindly attend below request:-
User not able to do switching after point to rcas mbi ip.
ID: MYMJMGMT8A
GLOBAL ID: MYGLOBAL567767081
Please assist to check and advise. Logs as attached at SCP email.
(file cannot be uploaded at Redmine because it exceeds the maximum allowed file size (5 MB))
History
#1 Updated by Stephanie Sufrapto almost 4 years ago
- Status changed from New - Begin Life Cycle to Work Completed-End life cycle
- Assignee changed from Stephanie Sufrapto to Zahir Abd Latif
- % Done changed from 0 to 100
Asked maybank malaysia to check appconfig and connectivity to wsdl in Maybank Indonesia DR server.
Issue raised in maybank indonesia.
Kindly close this.