Projects
-
- Agrobank Projects
To contains all Agrobank projects
-
- Agrobank Change Request
To keep track of Agrobank CR document
-
- BI FAST
This project is for Bank Indonesia to have the same system as PayNet RPP project. Our scope is to deliver the RPP Back Office that is renamed to CI Portal in this new project.
- BIFAST Internal Testing (SIT)
BIFAST Internal Testing issue from LAPI
-
- PHASE 2 - BI Intergration Testing (SIT)
System Integration Testing performed by LAPI
- PHASE 2 - BI User Acceptance Testing (UAT)
BIFAST User Acceptance Testing (UAT) from BI JIRA
- PHASE 2 - Internal Testing
Internal Testing from Penril local environment
- PHASE 2 - Vendor Internal Testing
Reported issue from PTAP in VIT environment
- BIFAST User Acceptance Testing (UAT)
BIFAST User Acceptance Testing (UAT) from BI JIRA
- Vendor Internal Testing (VIT)
VIT Issue Log (Internal)
- BSN Corporate Digital Banking
This is a comprehensive Cash Management System for Bank Simpanan National.
This project will break into 2 phases. Phase 1 deliver all the ready modules at host and third party system. Phase 2 deliver the rest of the modules agreed on requirement study .- 0. CDB_Change Request
Included all BSN Change of Request
- 1. CDB_Phase 2 & 3 Development
Tracking on all CDB PHASE 2 system development and RFC (Request for Change) from PHASE 1 which has been approved to be migrated during Phase 2 or by Patch after Go_LIVE.
- 2. Inhouse Task (Development & QA)
To keep track of the BSN in-house Task for Developer and QA
-
- KFH Labuan Change Request
For KFH Labuan change request
- KFH Projects
This projects consist of all KFHOnline Internet Banking sub projects.
- KFH Change Request
To keep KFH change request documentations
- LH Bank
Contains all LH Bank projects
- LHBank Change Request
To keep track of LHBank change request
-
- System Internal/Integration Test (SIT)
To include all issue reported during SIT phase
- User Acceptance Test (UAT)
To include all issue reported during UAT phase
-
- PayNet Support
To log RPP Back Office issues
- PayNet SIT Log
To log RPP Back Office SIT issues
- PayNet UAT Log
To log RPP Back Office UAT issues
- Phase 2 Enhancement
To log RPP Back Office Phase 2 Enhancement issues
-
- Pineapple HRM
Penril's Attendance System
- PRODUCTION
PINEAPPLE HRM IN PRODUCTION ENVIRONMENT
- B - Production Support
For all penril support caseses
- Affin Bank Support
For Affin Bank production issues
- Agrobank Support
To report all the production issues
- BI FAST Support
For BI FAST project production support.
BI FAST went life on December 20th, 2021. - BSN CDB Support
For BSN CDB Support cases
- KFH Support
To log KFH support issues.
- Maybank Support
Support task
- Maybank BII eCustody Support
For BII eCustody production issues
- Maybank BII Custody Change Request
For all the Maybank BII eCustody change request forms
- Maybank BII M2U-RIB Support
To log BII Retail Internet Banking production issues
- Maybank BII RCAS Support
Maybank-BII RCAS support
- Maybank Cards
Maybank Cards Support inc Amex OMS, PersCorp & CST and Merchant Portal
- Maybank Merchant Portal Support
For Merchant Portal production issues
- Prepaid Online Web System (POWS)
- Prepaid Online Web Service (POWS)apps
- WebLogic Server
- Maybank CAS Support
To contain all Maybank CAS support
- Maybank Custody Support
For Custody production issues
- Maybank Custody Change Request
To store all the Malaysia eCustody change request forms
- Maybank Islamic Support
For Maybank Islamic Support cases
- Maybank MIAS Support
To Support MIAS.
Product: WEBLOGIC Server - Maybank Philippine Revamp
Maybank Philippine Revamp
- Maybank RCAS Support
For all the Malaysia RCAS production issues
- Maybank Regional Support
5 Regions:
1)Philipine
2)Cambodia
3)Papua New Guinea
4)Vietname
5)- Maybank Philippines
Maybank Philippines Support
- Maybank Singapore Support
For Maybank Singapore support task
- MBB Care Support
All about MBB Care
Product: Weblogic clustr - MBB ELDS Support
Support task for Maybank project:ELDS
Product: WEBLOGIC
- PayNet RPPBO Support
For RPPBO Production Issues
-
- V-Knowledge Base
For knowledge sharing
- X - In House Documents
As Penril document repository
- Penril On Liferay
Redesign Penril website and port to Liferay
- Projects Related Documentation
Containing all Test Checklist, Test Results, Test Summary and Report with regards to the related project.
- Y - Infinite Arts Project
Contains all the Infinite Art projects and tasks
- Z-Archive
To archive all completed projects
- Abu Bakar Task Tracking
This project is create for Abu Bakar to do his own task tracking.
-
- Agrobank Information Site
To contain all the information site tasks for Agrobank
- Agrobank Internet Banking
Consists of all Agrobank Internet Banking projects
- Agrobank Multilanguage
To contains all Agrobank projects
- Agrobank Phase 2
To manage Agrobank Phase 2 project
- AgroBank Meeting Minutes
AgroBank meeting minutes folder
- Phase 2 - Development Phase
to keep track the development phase progress.
- Phase 2-BIB
To manage Agro BIB Phase 2 project
- Phase 2-IBAM
To manage Agro IBAM Phase 2 project
- Phase 2-RIB
To manage Agro RIB Phase 2 project
-
- Phase 2 - SIT Phase
To keep track the Phase 2 SIT progress
- Phase 2 - UAT Phase
To keep track the Phase 2 UAT progress
- Agrobank Report
To create reports for Agrobank Internet Banking
-
-
-
-
-
-
-
-
- Agrobank Call Centre
To setup call centre for Agrobank to support Agrobank Internet Banking
- Agrobank IB - Infrastructure
Includes:-
1) Network appliances - Mersiniaga
2) Servers - DELL - Agrobank RIB
To contain all the Agrobank Retail Internet Banking tasks
-
-
- Agrobank ePay Project
Consists of all Agrobank ePrepaid Top-up Purchase & Online Payment project task.
- ePay_Internal Testing
Consist all task with regards to ePay Internal Testing progress.
- ePay_SIT
To keep track the ePay SIT progress
- Agrobank TAC Per Transaction
Implement TAC validity period is parameterized to per transaction that bound to to account#, from account#, amount, service name, timestamp
- Air Asia
Contains all the Air Asia project
- AirAsia Exam System
To design the exam system for Air Asia
- AmAssurance ePayment System
Implement ePayment System, ePayment Administration Module (ePAM), host file generator and code table uploader
- AmAssurance Support Archived
For Am Assurance support cases
- Hazri's Task Tracking
For Hazri to track tasks progress
- IBM Porting
To Port OnlineApps to IBM platform
- OnlineApps - RIB/RSS
Porting RIB/RSS into WAS 7.0 and DB2
- OnlineApps IBGCore
Port IBGCore to IBM WebSphere
- Port OnlineApps Administration
Port OnlineApps Administration to IBM Websphere
- Port OnlineApps Scheduler
Port OnlineApps Scheduler to IBM Websphere
- IBSCR027 - IBG: Sumitomo Bank
Add Sumitomo Mitsui Banking Corporation into IBG list.
- kfh_consumer
- kfh_bib
- kfh_corus
- IBGCore
- DB
- BVMC - IBSCR028 - IB Fee Waiver
Implementing fee waiver for all chargeable transaction modules for transactions perform by KFH’s stafff for kfh_consumer's module:
- Stop Cheque
- FTT
- Interbank IBG
- Standing Instruction
For BRS and CR, refer to:
- JPM - ICU BLESS
End user:JPM (Jabatan Perdana Menteri)
Project name: ICU BLESS PROJECT
Product: LIFERAY
App Vendor: XYBASE - KFH Labuan Support Archived
For KFH Labuan production issues
-
- Bill Payment Enhancement
Enhancement for KFH Bill Payment module to parameterized Biller and crediting account.
Targeted dates:
Internal UAT 19/7 - 30/7
External UAT 2/8 - 6/8
Pre migration 9/8 - 13/8
GO LIVE - 14/8 - BVMC
This is the customized BVMC program. All issues related to KFH version of BVMC shall report to this project.
- CORUS
BIB administration tool
- IBSCR012-CORUS for GFS
CORUS new search criteria for temporary account in OFI transaction enquiry. Requirement as below:
1. Temporary account criteria: TT against Cash, TT against Cheque and TT against GL
2. Automatically get OFI transaction from the selected account for the above mention transaction type...
- IBFT SAN Via IB
To integrate IB Interbank Funds Transfer via MEP SAN.
Scope of deliverable:-
1. Consumer Internet Banking
• IBFT Transfer
• Favorite Maintenance
• Limit Maintenance
• SMS Notification
2. Integration with OC4J
3. BVMC
• Service configuration... - IBSCR024 – 3+8 Mobile Number
To implement a new mobile prefix "011" with 8-digits mobile number for all input fields of mobile number:
a) CIB - Registration
b) CIB - Reset mobile number
c) CIB - SMS Notification
d) CORUS - Company contact person
e) Reports - all reports to generate mobile number fields up to 8 digits... - IBSCR025 - New Branch Opening
Add new KFH branches into KFH IB system.
- IBSCR026-GIA Upliftment 176
Modify GIA Upliftment to only perform single SP trxn code 176 for CIB and BIB
- IBSCR029 - IB Online Contest
Implementing IB Online Contest for IBG, iPay & Bill Payment module.
This is a temporary contest module build in which require to be removed from IB at the end of the contest. - KFH Business Internet Banking
This is the Business Internet Banking project
- KFH BIB Report
Report generator for Business Internet Banking
- KFH Online Banking Phase II-B
This project is to close up 10 features, Standing Instruction (SI), Remittance Applications, SMS Notification, Personalization, Secured MailBox, eDividend, Debit Payment, Payee Corporation Reports, Loan Payment and Unit Trust
- eDividend
This module implement electronic payment platform for company to transfer dividend money to shareholders
- KFH Secured Mailbox
This project is to implement the mailbox feature for KFHOnline Consumer Internet Banking, Business Internet Banking and CORUS.
BRS walk through 2/8 - 13/8
Development 16/8 - 17/9
UAT 20/9 - 8/10
Pre migration 11/10 - 15/10
GO LIVE - 16/10- BIB Secured Mailbox
Develop BIB secured mailbox
- CIB Secured Mailbox
Develop secured mailbox for CIB
- CORUS Secured Mailbox
Develop secured mailbox for CORUS
- KFH Consumer Internet Banking
This is the Consumer Internet Banking (CIB) project
- KFH CIB Report
Report generation for KFH Consumer Banking
- KFH EPF
KFH EPF module for both CIB and BIB. File integration with KWSP-EPF.
- KFH IBGCore
This is an independent project but has the dependency for internet banking
- DR-IBGCore
Setup IBGCore for DR
- IBG Second Validation
Enhance IBGCore to support MEPS new requirement for second validation
- IBG Transformation
IBG Multiple Settlement
-To increase the frequency of settlement by two (2) windows per day.IBG Payment Reference Standard
- To make three (3) payment information as mandatory:
1. Recipient’s Reference
2. Payment Description
3. Sender’s NameIBG Standardize Beneficiary ID ...
- IBSCR012-IBGCore for GFS
Customization Requirements
IBGCore will process, as special case, IBG entry from GFS application request the below mention:
1. TT against Cash
a. Using a special account (current account) that allow overdrawn (will be provided for development, UAT and production)... - eShare Enable-mend
MEPS has a new requirements for eShare Payment. All the bank will have to comply to this new changes. All the new changes will fall into this project.
- KFH Infra
This project is for KFH infrastructure, server and any other issues that is not belong to a specific application.
- KFH Labuan Project
To convert current BIB to BIBL. BIBL is run on USD as local currency and also support foreign currency transfer.
- KFH Portal - Information Site
This is the KFHOnline Information site project. All issues related to this project, should log under this umbrella.
- KFH Revamp for Look and Feel
This is for Revamp of Look and Feel for current projects such as KFH Consumer and KFH BIB
- KFHIB Oracle DB Upgrade
Trace the oracle Upgrade activity
- Preventive Maintenance
This will provide all information regarding KFH IB servers Preventive Maintenance
- Remittance Application Forms
Implement all the user requested application forms and the enquiry module.
Targeted Dates:
UAT 2/8 - 13/8
UAT Signoff 20/8
Pre migration 23/8 - 27/8
GO LIVE 28/8- Banker's Cheque Application
Create a Banker's Cheque Application form
- Demand Draft Application
Create a Demand Draft Application form for KFHOnline Consumer Internet Banking
- Deployment Staging
Deploy project to UAT staging environment
- Remittance Application Enquiry
Enquire all the application forms
- Remittance Application Report
Create remittance application reports, Banker's Cheque, Demand Draft, update consolidated transaction
- SMS Notification
To implement SMS alert to funds transfer sender/beneficiary mobile phone.
UAT 2/8 - 13/8
UAT Signoff 20/8
Pre migration 23/8 - 27/8
GO LIVE 28/8 - Standing Instruction
This feature will provide recurrent and future payment for all intrabank, interbank and foreign telegraphic transfer and bill payment
-
-
- LHB - BRS
To contain task for BR compilation and sign off
- LHB - IB Development
To contain all development tasks for LHB IB
- LHB BIB Development
Contain all LHB BIB development task
- LHB IBAM Development
Contain all LHB IBAM development task
- LHB IBAM SIT
Report all the IBAM SIT issues here
- LHB IBAM UAT
Report all the IBAM uat issues here
- LHB Integration Development
Contain all LHB IB host integration development tasks
- LHB RIB Development
Contain all RIB development tasks
- LHB RIB SIT
Report all the RIB SIT issues here
- LHB RIB UAT
Report all the UAT issues here
- LHBank - Mobile Web for RIB
To implement Mobile Web for the Retail Internet Banking
-
- M2U Pay Project Archived
M2U Pay Project
-
- MATRADE Change Request
Included all request of change for MATRADE's Project
- MATRADE - TPMS UAT Conditional Sign-off
To include all conditional issue under status KIV and Change Request
- MATRADE - Trade Promotion Management System (M1&M2)
Contains all TPMS Module 1 and 2 pending issues to be completed by 23/9/2015
- MATRADE - Trade Promotion Management System (M3-M8)
To contains all TPMS Module 3 to 8 projects
-
- Module 3: Promotion
To test on pre-event - where planning of event, invitations & registration take place
- Module 4: Publication
To test on module where publicity related activities for the events.
- Module 5: Execution
To test on event day, where attendance marking is required.
- Module 6: Post-event
To test on module where officers and companies to provide feedback for the events.
- Module 7&8: Optimization & Evaluation
To test on Dashboard page.
-
-
- TPMS_GO-Live Support
Include all issue under Inteksoft Help Desk
- Maybank eCustody CR 2016
For Maybank Malaysia custody project 2016 change request
-
- Maybank Projects
To keep all Maybank Porjects
- ELDS - WebLogic Server
This is Maybank project :ELDS which using WebLogic server
- M2U Dual Language
M2U Malaysia Dual Language Enhancement
- M2U Info Site Enhancemen042011
To enhance:-
1) M2U Information Site
2) M2U Whole Sale Banking Web Site - M2U Look & Feel Revamp
To deploy new design for M2U Secured Site
- M2U UPASS Project
This is the project to replace current Maybank2U LDAP.
- M2U UPASS Development
For development phase
- UPASS CORE
This project is for M2U UPASS Core development
- M2U UPASS Initial Stage
1) Project planning
2) Requirement study
3) Requirement documentation
4) Requirement, Design and any other documentations - M2U UPASS SIT
SIT issue reported
- Maybank - RSA
This project will contains all the Maybank RSA related projects
- Maybank Amex
This project contains all the subproject of Maybank Amex project
- Maybank Amex - OMS
Online Merchant System for Maybank American Express Project
- Maybank Amex - PerCorp
This is the Maybank Amex Personal & Corporation projects. All the issues related to this shall report under this umbrella.
- CR1-Level 2 Data
Requirement
2.1 Level 2 Data
• To pick up level 2 data from PCTD and PCSD Trans ID.
• 72 characters length
• Contains addendum information e.g. Insurance, Air ticket, Restaurant etc.
2.2 Foreign Currency
• To re-align foreign currency amount with transaction description.... - CR2-Level 2 Data
Schedule:-
Development 05-09/07/2010
SIT 12-15/07/2010
Deliver for UAT 16/07/2010
Target Implementation 20/07/2010Requirements:-
2.6 Company Name Corporate Cards
• To add company name field below name on card...
- Maybank BII eCustody
Maybank BII eCustody Project
- BII eCustody - Internal Testing
Containing all related internal testing issues with regards to BII eCustody projects.
- Admin
Containing all related internal testing issues with regards to BII eCustody projects.
- BII eCustody - UAT Testing
User Acceptance Testing log will be collected and distributed to the respective engineers to be fixed. Engineers will update the task once the issue has been fixed/resolved.
- Maybank Cambodia Revamp
To implement eIBFT and Cardless ATM Withdrawal module. The requirement docs are at https://hub.penril.net/share/s/vKxmf4UiSCabv402-qEfIw
- Maybank CAS
For Maybank CAS project tracking
- Maybank Custody
To keep track of Maybank Custody Project activities
- Custody Bank Admin System
Contains all the Custody Bank Admin System Tasks.
- eCustody Phase II
sample
1) connecting to smtp server to send email containing ecustody report- eCustody - SIT
Report all the IBAM SIT issues here
- eCustody System
Contains all the eCustody Tasks
- Maybank ETiQa
To keep track of all projects and tasks under Maybank ETiQa
-
- IBAM Phase 2 Development
To contains all the IBAM Phase 2 enhancement
- Maybank BII Internet Banking Phase 3
For Maybank BII Phase 3 project
- RIB Phase 2 Development
To hold all the enhancement of RIB
- Maybank Islamic
Keep track of Maybank Islamic site updates
- Maybank Merchant Portal
Maybank Merchant Portal (MMP)
- Maybank Philippines
To keep track of all Maybank Philippines projects and tasks.
- M2U Support System
To handle all the tasks and issues for M2U Support System (MSS)
- MPI Business Banking System
To handle all the tasks and issues for MPI SME banking system (BIB)
- MPI Integration
Consist of all MPI integration layer tasks and subprojects
- MPI Phase 2
To implement MPI Phase 2 modules
- MPI: Batch 1
To implement
- Credit Card Enquiry
- Credit Card Payment
- Host Integration Message
- MPI Retail Banking System
To handle all the retail banking tasks and issues for MPI
- MPI WebLogic Server
Consist all related to WebLogic Server
-
- Maybank RCAS
Maybank Regional CAS project
- Maybank - IndoChina + Future enhancement
IndoChina for Vietname and Loas if they launch and enhancement requested but should be implement it in Aug 2015
-
- Maybank/Bii - RCAS - RCMS SIT/UAT support
Support for RCMS/RCAS SIT/UAT environment before new project start and some user still perform the testing.
-
- Bii - RCAS - Supply Chain (RSCF)
to support Bii RCAS Supply Chain Project - SIT/UAT environment
- Maybank - R2
Maybank - R2 + IndoChina
- Maybank RCAS - R1
Maybank RCAS - reLocII change to R1 (release 1)
- Maybank Singapore
To support Maybank Singapore BV system
-
- MPI_Internal Testing
Consist all Internal Testing Task and related documents
- OnlineApps
This is the parent project.
- OnlineApps Navigation
Create navigation module to replace BVMC navigation
- OnlineApps Secured Mailbox
This is the secured mailbox stand alone java application
- SecuredMailbox Functional Test
To create end to end functional test secured mailbox features
- Onlineapps-Workflow
Online Application Submission Workflow and Tracking System
- UPASS
Contains all the UPASS projects and activities
- UPASS Enhancement I
Enhance UPASS to support multiple application, organization, access matrix and create GUI
- Penril In House Project
To group all the in house small project for Penril
- New Development Server
This project is to setup the new development server for in house use.
- Penril.net Maintainance
Maintain penril.net website
- Revamp Penril Site on LifeRay
Create Penril Website in LifeRay. Resign and rework on the currently site.
- Solution Demo in Indonesia (BNIS, Bank Jatim)
To create RIB, BIB Demo for Web and Mobile.
- Taylor
Support Taylor's Application run on BV
- Phase II - Portal Revamp
Purpose:-
To completely change the current portal design which consist of Parent Portal and Student Portal to a whole new design and outlook.
Scope :-
1. To design new interface design for Taylor’s Portal which consist of –
Parents Portal, and Student Portal only. ... - Preventive Maintenance 2010
Do PM for Taylor College on June 2010
- Taylor Support Archived
To report all Taylor production issues
- William's Task Tracking
William's ongoing tasks is here...
- X-PLATFORM
To keep track of X-Platform development and testing activities
Also available in: Atom