Bug #12317

[BIF-20124] Manage Liquidity - Connection Timeout When do Withdrawal

Added by Siti Norahayu Mohd Desa about 3 years ago. Updated about 3 years ago.

Status:Work Completed-End life cycleStart date:September 08, 2021
Priority:NormalDue date:September 09, 2021
Assignee:Siti Norahayu Mohd Desa % Done:

100%

Category:-Spent time:-
Target version:-

Description

Test Step:
1. Access to the Liquidity Top-Up and withdrawal function.
2. Click Manage Liquidity button.
3. System displays the Liquidity Top-Up and withdrawal detail screen. In this screen, Participant field displays all Participant BIC dropdown lists
4. After select withdrawal select participant, enter the amount of funds that more than BI-FAST balance, and click on the Next button.
5. System will validates and displays the confirmation screen.
6. Verify details information and click on the Confirm button.

Test Data:
1. Host User maker can access this function
2. Using valid data according to the input rules Specification
3. Maker/checker is enabled for the function being tested
4. Host User can use this function for all Direct Participant
5. Refence number should be same with reference number that is generated to RTGS by CI HUB
6. the information in "enquiry" screen must be same with input Withdraw data
7. the information in RTGS must be same with input withdraw data
8. funds in BI-FAST must be insufficient

Expected Result:
BI-FAST message error "insufficient funds to withdraw"
BIFAST not debited
BI-RTGS not creditted
Actual Result:
Displays Notification "Connection timeout. Check Liquidity balance on Liquidity Management Enquiry menu."

History

#1 Updated by Bramantyo Pujo Wiyono about 3 years ago

  • Status changed from New - Begin Life Cycle to Internal Testing
  • Assignee changed from Bramantyo Pujo Wiyono to Siti Norahayu Mohd Desa
  • % Done changed from 0 to 80

deploy on 2.0.37-ga

#2 Updated by Siti Norahayu Mohd Desa about 3 years ago

  • Status changed from Internal Testing to Development / Work In Progress
  • Assignee changed from Siti Norahayu Mohd Desa to Bramantyo Pujo Wiyono

Reply from the issue.

After we do a retest,

Actual result still not comply with expected result.
Current Balance = RP. 15.004.850
Withdrawl = RP. 16.000.000.000
Success for pending approval > Submit
Display Error Message "U252" during approval.

Hi,
This is an expected response code when hub validates the liquidity balance of the participant bank. Hub sends an error code 02 with error description U252 which translates to Sponsor Adjustment Balance Not Enough. CI-Portal team to do a mapping of this error code so that it can show the message error to be "insufficient funds to withdraw".

Regards,
SW

#3 Updated by Bramantyo Pujo Wiyono about 3 years ago

  • Status changed from Development / Work In Progress to Internal Testing
  • Assignee changed from Bramantyo Pujo Wiyono to Siti Norahayu Mohd Desa

deploy on 2.0.38-ga
still persist
redeploy on 2.0.40-ga

#4 Updated by Siti Norahayu Mohd Desa about 3 years ago

  • Status changed from Internal Testing to User Acceptance Test

Send for user testing

#5 Updated by Siti Norahayu Mohd Desa about 3 years ago

  • Status changed from User Acceptance Test to Work Completed-End life cycle
  • % Done changed from 80 to 100

Issue have been closed by Aditya on 13 Sept 2021