January 31, 2020

10:16 KFH Change Request Task #10604 (Internal Testing): [Change Request] FPX Limit for Non-Resident
Dear Akmal,
Kindly proceed to test for FPX limit
Thank you.
Yap Kah Yan

January 23, 2020

16:03 KFH Change Request Task #10604 (Work Completed-End life cycle): [Change Request] FPX Limit for Non-Resident
*+Requirement:+*
To block a non-resident customer to: -
1. Maintain FPX limit more than RM10,000
2. Perform FPX ...
Lizahwati Basirun
14:28 KFH Change Request Task #10603 (Dropped-End of life cycle): [Change Request] IBSCR19013 IBG Enhancement_Defaulting I...
*+Request:+*
• To default the IBG outgoing files (mnc & mrt) with post-fix value
• To include post-fix with default...
Lizahwati Basirun

January 22, 2020

12:07 KFH Change Request Task #10600: IBSCR19015: EPF Contribution information to be reflected at account statement (SCP#5...
Yap Kah Yan wrote:
> Refer to attached document:
>
> To change as per below:
> To send the following EPF Contrib...
Yap Kah Yan
12:06 KFH Change Request Task #10600: IBSCR19015: EPF Contribution information to be reflected at account statement (SCP#5...
IB:EPF<space>Pymt Code:<1 character><space>Ctb Mo:<mmyyyy><space>EPF No:<15characters><space>Emp Name:<15characters> Yap Kah Yan
12:04 KFH Change Request Task #10600 (Dropped-End of life cycle): IBSCR19015: EPF Contribution information to be reflected...
Refer to attached document:
To change as per below:
To send the following EPF Contribution information to Core (T...
Yap Kah Yan

January 21, 2020

18:04 KFH Change Request Task #10592: [Documentation] Technical Document for Stronger 2FA
reupload Aditya Prathama
17:35 KFH Change Request Task #10592 (Review BRS): [Documentation] Technical Document for Stronger 2FA
Technical Doc Done. Please review Aditya Prathama
12:08 Task #10595: [RPP Phase 2] CMS NAD Maintenance - Authorization Module
Test scope for NAD matrix:
1.change number of required approval
expected result: number of approval must be reac...
Kar Chun Siew
09:50 Task #10595 (Work Completed-End life cycle): [RPP Phase 2] CMS NAD Maintenance - Authorization Mo...
To develop below requirement:
Add authorization module for CMS (Verifier & Approver)
-Include special handling fo...
Yap Kah Yan

January 20, 2020

11:11 KFH Change Request Task #10592 (Work Completed-End life cycle): [Documentation] Technical Document for Stronger 2FA
Dear Adit,
Kindly assist to prepare the Technical Document for this CR.
* Flow Diagram
* Explanation of the me...
Lizahwati Basirun
 