Activity

From October 28, 2013 to November 26, 2013

November 26, 2013

Avatar?id=2560&size=24 17:17 Revision 109:d2c17217af73 (m2u-upass-min): A minor change.
Ahmadi Hadi
Avatar?id=2560&size=24 16:55 Revision 107:63dd8c2cdfa8 (m2u-upass-ws): Added a sample method to the ReST interface with JAAS u...
Ahmadi Hadi
Avatar?id=2560&size=24 16:24 Revision 70:be137fe903ee (m2u-upass-core): Removed a legacy class.
Ahmadi Hadi
Avatar?id=2560&size=24 15:37 Revision 106:47f99e7326c0 (m2u-upass-ws): Updated some test data.
Ahmadi Hadi

November 21, 2013

Avatar?id=2560&size=24 17:25 Revision 126:2208b859d14c (m2u-upass-admin): Updated the Base64 password. Previously it was gener...
Ahmadi Hadi
Avatar?id=1835&size=24 08:53 UPASS CORE Task #3528: Load Test LDAP for Benchmark
*Benchmark with 100 threads (running on SIT server)*
*LDAP*
!https://lh4.googleusercontent.com/-2g5IUqDvogg/Uo1Yw...
Mohd Hashim Mohd Hadzrul

November 20, 2013

Avatar?id=2560&size=24 15:09 Revision 125:dfb99deb7c9c (m2u-upass-admin): Encoded the root password in Base64.
Ahmadi Hadi
11:44 UPASS Admin Task #3737 (Work Completed-End life cycle): For USS> Customer Enquiry> Create
Fixed and tested succesfully . Hosseiny Elham
11:42 UPASS Admin Bug #3820 (Work Completed-End life cycle): Customer Enquiry> M2U Singapore Integration
sixed successfully Hosseiny Elham

November 19, 2013

16:05 UPASS Admin Task #3738 (User Acceptance Test): For USS> Customer Enquiry> Edit
By right, I have tested when I was in Maybank. Hosseiny Elham
Avatar?id=1835&size=24 15:52 UPASS CORE Task #3528: Load Test LDAP for Benchmark
I will do the testing again and will record down the results. Mohd Hashim Mohd Hadzrul
Avatar?id=1835&size=24 15:51 UPASS CORE Task #3644 (Finished Development): Convert the project for UPass Pre-population to EJB
Sorry forgot to update this.
The EJB is ready and has been tested and used in Maybank SIT environment. It can be a...
Mohd Hashim Mohd Hadzrul
Avatar?id=1835&size=24 15:45 UPASS CORE Task #3591: Migration Fall back - to add switch at the client application
I believe that Bernard had tested the switch. FYI, the switch was build inside the client-app. Not in UPASS. Mohd Hashim Mohd Hadzrul
14:12 M2U UPASS Initial Stage Task #3217 (Dropped-End of life cycle): M2U: Syste Design and Requirement Document
Hadi completed this task. Tan Lee Yong
14:11 M2U UPASS Initial Stage Task #3123 (Dropped-End of life cycle): M2U: Development Environment Doc
Tan Lee Yong
14:10 M2U UPASS Initial Stage Task #3124 (Work Completed-End life cycle): M2U: UPASS Admin Console BRS
Tan Lee Yong
14:09 M2U UPASS Development Task #3383 (User Acceptance Test): Extract a minimal subset of upass-core to be embedded in M2U r...
Tan Lee Yong
14:08 UPASS CORE Task #3569 (Work Completed-End life cycle): Prepare Online Stock API and Specifications doc
At this stage, I would assume this task is already completed. Tan Lee Yong
14:07 UPASS CORE Task #3418 (User Acceptance Test): modify upass to support end to end encription (jdk 1.4)
Tan Lee Yong
12:38 UPASS CORE Task #3646 (Work Completed-End life cycle): Improve the performance of authentication operation i...
Tan Lee Yong
12:37 UPASS CORE Task #3644: Convert the project for UPass Pre-population to EJB
What is the update on this task? Tan Lee Yong
12:36 UPASS CORE Task #3208 (Work Completed-End life cycle): M2U UPASS CORE: Create Unit Test Using SoupUI
Tan Lee Yong
12:36 UPASS CORE Task #3642 (Work Completed-End life cycle): Implement LDAP updates for user creation in UPass
Tan Lee Yong
12:35 UPASS CORE Task #3637 (Work Completed-End life cycle): Application (Online ticketing) Customization
Tan Lee Yong
12:34 UPASS CORE Task #3621 (Work Completed-End life cycle): Application (im2u sg integration) Customization
Tan Lee Yong
12:34 UPASS CORE Task #3528 (Internal Testing): Load Test LDAP for Benchmark
Has this been conducted and any result? Tan Lee Yong
12:33 UPASS CORE Task #3419 (Work Completed-End life cycle): Upass authentication during migration (jdk 1.4)
Tan Lee Yong
12:30 UPASS CORE Task #3571 (Work Completed-End life cycle): Application (CCPP, online ticketing, im2u sg integra...
Tan Lee Yong
12:29 UPASS CORE Task #3591 (Internal Testing): Migration Fall back - to add switch at the client application
Hi Hadzrul, has this scenario being tested. Like if required to fall back, can we just switch to LDAP and continue to... Tan Lee Yong
12:27 UPASS CORE Task #3417 (Work Completed-End life cycle): prepare prepopulation Ldap script (jdk 1.5)
Tan Lee Yong
12:26 UPASS CORE Task #3420 (Work Completed-End life cycle): modification of M2U (jdk 1.4)
Tan Lee Yong
12:26 UPASS CORE Task #3416 (User Acceptance Test): Finalise Upass interfaces (Add multiple application support to...
Tan Lee Yong
12:24 UPASS Admin Task #3680 (User Acceptance Test): UPASS Admin - Change Your Password
Tan Lee Yong
12:24 UPASS Admin Task #3676 (User Acceptance Test): UPASS Admin - Menu Maintenance
Tan Lee Yong
12:23 UPASS Admin Task #3682 (User Acceptance Test): UPASS Admin - Application Admin Maintenance
Tan Lee Yong
12:23 UPASS Admin Task #3679 (User Acceptance Test): UPASS Admin - Audit Log
Tan Lee Yong
12:22 UPASS Admin Task #3675 (User Acceptance Test): UPASS Admin - Admin User Maintenance
Tan Lee Yong
12:22 UPASS Admin Task #3672 (User Acceptance Test): M2U UPASS - Admin Group Maintenace
Tan Lee Yong
12:22 UPASS Admin Task #3681 (User Acceptance Test): UPASS Admin - Upass USS Maintenance
Tan Lee Yong
12:22 UPASS Admin Task #3678 (User Acceptance Test): UPASS Admin -Customer Enquiry
Tan Lee Yong
12:21 UPASS Admin Task #3737 (Internal Testing): For USS> Customer Enquiry> Create
Hi Elham, has this been tested? Tan Lee Yong
12:20 UPASS Admin Task #3626 (Work Completed-End life cycle): to develop the Application Admin maintenance
Tan Lee Yong
12:20 UPASS Admin Bug #3820: Customer Enquiry> M2U Singapore Integration
Please update on this issue by today Tan Lee Yong
12:19 UPASS Admin Task #3738: For USS> Customer Enquiry> Edit
Please update on this issue by today Tan Lee Yong

November 07, 2013

Avatar?id=2560&size=24 11:01 Revision 108:88e47c247478 (m2u-upass-min): Added c3p0 dependency.
Ahmadi Hadi
Avatar?id=2560&size=24 10:55 Revision 107:f40787ab3b25 (m2u-upass-min): Added connection pool settings for maybank-dev env.
Ahmadi Hadi

November 06, 2013

Avatar?id=1835&size=24 11:52 Revision 124:4a2b001a3331 (m2u-upass-admin): Add upass to log4j
Mohd Hashim Mohd Hadzrul
10:59 Revision 123:a28809b30e98 (m2u-upass-admin): Updated eception handler for Ldap exception & genera...
Ong Wei Kuan

November 01, 2013

18:26 Revision 122:464d27830931 (m2u-upass-admin): Merge with ae1d99468601efcf82325beca4a86db695c1b1bf
Ong Wei Kuan
18:20 Revision 121:9d72c7621bba (m2u-upass-admin): Added exception handler for LDAP exception
Ong Wei Kuan

October 28, 2013

Avatar?id=2560&size=24 12:10 UPASS CORE Task #3739 (Closed - End of life cycle): Cover MaybankFacadeImpl in the integration test
Ahmadi Hadi
 

Also available in: Atom