Activity
From August 05, 2010 to September 03, 2010
September 03, 2010
- 17:15 Demand Draft Application Bug #445 (Work Completed-End life cycle): BCA-DDA-UAT-C017
- remove nowrap from the file
- 16:49 Demand Draft Application Bug #445 (Development / Work In Progress): BCA-DDA-UAT-C017
- Alignment can reduce to smaller saiz(not out of page)but still cant get an exact size to fixed.
- 10:15 Bug #444 (Work Completed-End life cycle): BCA-DDA-UAT-C026
- Done and tested succesfully.
- 10:10 Bug #436 (Closed - End of life cycle): BCA-DDA-UAT-C018
September 02, 2010
- 17:32 Bug #441 (Work Completed-End life cycle): BCA-DDA-UAT-C023
- Done.
- 17:30 Bug #442 (Work Completed-End life cycle): BCA-DDA-UAT-C024
- Done and tested successfully.
- 17:21 Bug #443 (Work Completed-End life cycle): BCA-DDA-UAT-C025
- Done and tested succesfully. can test it at kfh_bvmc using username: ibReport03 password: ibreport03
- 16:12 Bug #436: BCA-DDA-UAT-C018
- Revised:
Prompt error message "Applicant's address is required."
If Applicant's Address 1 is empty. - 14:50 Banker's Cheque Application Bug #437 (Work Completed-End life cycle): BCA-DDA-UAT-C019
- Formatting Email Notification for Banker's Cheque
- 14:47 Banker's Cheque Application Bug #439 (Work Completed-End life cycle): BCA-DDA-UAT-C021
- Complete Formatting the document
- 11:10 Bug #425: BCA-DDA-UAT-C014
- Shuhaida had start on leave from 2 Sept to 13 Sept 2010.
Ayu, please take over this issue log. - 10:57 Demand Draft Application Bug #438 (Work Completed-End life cycle): BCA-DDA-UAT-C020
- modified the email alignment for DD inside result service
- 10:34 Banker's Cheque Application Bug #439 (Development / Work In Progress): BCA-DDA-UAT-C021
- Formatting the Digital Form
September 01, 2010
- 00:52 Demand Draft Application Bug #440 (Work Completed-End life cycle): BCA-DDA-UAT-C022
- modified the alignment of Digital Form for DD & BC inside result service
- 18:18 Bug #441 (Development / Work In Progress): BCA-DDA-UAT-C023
- Checking out mercurial from branch takes time..will continue tomorrow..
- 16:49 Task #397 (Work Completed-End life cycle): BCA-DDA-UAT-C009
- - modified the js
- set bean to empty inside confirm and result action that forward the back button - 15:16 Demand Draft Application Bug #445 (Closed - End of life cycle): BCA-DDA-UAT-C017
- Alignment of screen layout at step 4/5.
- 15:14 Bug #444 (Closed - End of life cycle): BCA-DDA-UAT-C026
- BVMC – Daily Banker's Cheque and Demand Draft Report
Reports are unavailable for retrieval. - 15:12 Bug #443 (Closed - End of life cycle): BCA-DDA-UAT-C025
- BVMC – Daily and Monthly Consolidated Transaction Report
Updating existing report by adding new line for number of... - 15:11 Bug #442 (Closed - End of life cycle): BCA-DDA-UAT-C024
- BVMC – Daily Consolidated Customer Request At Branch Report
Updating existing report by adding new line for number... - 15:01 Bug #429 (Work Completed-End life cycle): BCA-DDA-UAT-C015
- put asterisk(*) for Debit my/our Account No.
- 14:44 Bug #441 (Closed - End of life cycle): BCA-DDA-UAT-C023
- Branch selection is missing in following reports:
- Daily Demand Draft Application Report
- Daily Banker's Cheque A... - 14:36 Demand Draft Application Bug #440 (Closed - End of life cycle): BCA-DDA-UAT-C022
- Digital Form for Demand Draft – BVMC Demand Draft Application Daily Report
- 14:34 Banker's Cheque Application Bug #439 (Closed - End of life cycle): BCA-DDA-UAT-C021
- Digital Form for Banker's Cheque – BVMC Banker's Cheque Application Daily Report
- 14:31 Demand Draft Application Bug #438 (Closed - End of life cycle): BCA-DDA-UAT-C020
- Email Notification for Demand Draft
- 14:28 Banker's Cheque Application Bug #437 (Closed - End of life cycle): BCA-DDA-UAT-C019
- Email Notification for Banker’s Cheque
- 14:17 Bug #429 (Development / Work In Progress): BCA-DDA-UAT-C015
- Asterisk (*) is missing for field "Debit my/our Account No." in Banker's Cheque and Demand Draft (Step 3/5).
- 14:16 Task #397 (Development / Work In Progress): BCA-DDA-UAT-C009
- Clear the field for "Applicant's Country" when "Clear" and "Back" button is clicked.
- 14:14 Bug #425 (Development / Work In Progress): BCA-DDA-UAT-C014
- new amendment
- 14:12 Bug #436 (Closed - End of life cycle): BCA-DDA-UAT-C018
- Prompt error message "Applicant's address is required."
If Applicant's Address 2 is empty and Address 1 and Address... - 09:47 Demand Draft Application Task #393 (Work Completed-End life cycle): BCA-DDA-UAT-C005
- modified the get Forex rate method inside IBRemittanceDBUtils
August 30, 2010
- 12:34 Bug #425 (Work Completed-End life cycle): BCA-DDA-UAT-C014
- modification done inside jsp print page
- 12:33 Bug #429 (Work Completed-End life cycle): BCA-DDA-UAT-C015
- Modification done inside jsp page
- 12:31 Bug #430 (Work Completed-End life cycle): BCA-DDA-UAT-C016
- modified inside validation.xml
August 27, 2010
- 17:50 Bug #430 (Closed - End of life cycle): BCA-DDA-UAT-C016
- a) Error message for Postcode – to differentiate between message from Applicant and Beneficiary
b) Prompt error me... - 17:49 Bug #429 (Closed - End of life cycle): BCA-DDA-UAT-C015
- a) Insert asterisks (*) to all mandatory fields.
b) Insert mandatory note - "Note(*): All fields with asterisks (*) ...
August 25, 2010
- 22:47 Remittance Application Enquiry Task #394 (Work Completed-End life cycle): BCA-DDA-UAT-C006
- Fixed the application enquiry records. data will appear even one of the table is empty
- 11:22 Demand Draft Application Task #393: BCA-DDA-UAT-C005
- Cause of error: Could not get Forex rate.
Based on BRS, if the submission falls on a weekend, then the Friday's ra... - 11:11 Bug #425 (Closed - End of life cycle): BCA-DDA-UAT-C014
- Amendments on wordings, format, and alignments in the Application Form "print" function.
August 23, 2010
- 20:01 Task #395 (Work Completed-End life cycle): BCA-DDA-UAT-C007
- add to reflect changes at application report and email notification
- 17:28 Remittance Application Enquiry Task #394: BCA-DDA-UAT-C006
- what is the status? Due date suppose is last Wednesday (18/08/2010).
- 13:48 Demand Draft Application Task #414 (Work Completed-End life cycle): BCA-DDA-UAT-C012
- Add new utils IBRemittanceDBUtils and commented out some lines to remove MYR into m_oCurrencyInfoMap.
August 20, 2010
- 13:12 Bug #413: BCA-DDA-UAT-C010
- update % done =P
- 13:10 Bug #413 (Work Completed-End life cycle): BCA-DDA-UAT-C010
- Add new method visitRemittancePage() to Allow to minimize / maximize the window size
- 11:32 Task #230 (Work Completed-End life cycle): Update BVMC user guide
- Updating the content of IB Service Info and IB Branch Info
August 19, 2010
- 17:59 Task #395 (Development / Work In Progress): BCA-DDA-UAT-C007
- Please reflect changes at application report and email notification
- 17:34 Bug #392 (Work Completed-End life cycle): BCA-DDA-UAT-C004
- Updating Terms and Condition
- 17:15 Task #397 (Work Completed-End life cycle): BCA-DDA-UAT-C009
- Add new method clearRemittance() inside common.js to clear only specific field.
- 15:46 Task #230: Update BVMC user guide
- Pending for screen shot because Remittance form have a bugs.
Concentrate on fixing the bugs first then will continue... - 15:33 Task #395 (Work Completed-End life cycle): BCA-DDA-UAT-C007
- Add address 3 and state for Demand Draft and Bankers Cheque.
- 15:31 Bug #390 (Work Completed-End life cycle): BCA-DDA-UAT-C002
- Remove Logo Perbankan Islam, Logo KFH, Date, and Title inside step 2, step 4 and step 5 for Demand Draft and Bankers...
- 14:20 Bug #392 (Development / Work In Progress): BCA-DDA-UAT-C004
- Revised: Spelling mistake in Terms and Conditions.
Apply to Step 1 of Banker’s Cheque and Demand Draft Application... - 13:55 Remittance Application Enquiry Bug #415 (Rejected - End of life cycle): BCA-DDA-UAT-C013
- User agreed to drop this issue. Filter by amount is not applicable for all enquiry.
- 09:24 Task #230 (Development / Work In Progress): Update BVMC user guide
- Reclone the Userguide.
Print Screen Remittance Form that involved BVMC
Updating the Navigation and Content
August 18, 2010
- 17:43 Bug #413: BCA-DDA-UAT-C010
- Issue log is BCA-DDA-UAT-C011, not BCA-DDA-UAT-C010
- 17:42 Remittance Application Enquiry Bug #415 (Closed - End of life cycle): BCA-DDA-UAT-C013
- Filter by "Amount" field is missing in Application Enquiry Screen.
- 17:41 Demand Draft Application Task #414 (Closed - End of life cycle): BCA-DDA-UAT-C012
- Remove "MYR" option from the drop down list.
- 17:29 Bug #413 (Closed - End of life cycle): BCA-DDA-UAT-C010
- Allow to minimize / maximize the window size.
August 17, 2010
- 18:35 Bug #389: BCA-DDA-UAT-C001
- reupdate the spent time
- 18:34 Bug #392: BCA-DDA-UAT-C004
- reupdated
- 18:33 Task #396: BCA-DDA-UAT-C008
- Reupdated
- 18:33 Task #398: BCA-DDA-UAT-C010
- reupdated
- 15:48 Remittance Application Enquiry Task #394: BCA-DDA-UAT-C006
- Currently is using SQL below to retrieve remittance application enquiry:
SELECT DISTINCT TBL_A.TRNX_ID, TBL_A.CREATI... - 15:34 Task #398: BCA-DDA-UAT-C010
- How much time you spent on this? I didn't see any spent time reported.
- 15:26 Task #398: BCA-DDA-UAT-C010
- Update the activity from task to Bux Fixing
- 15:18 Task #396 (Work Completed-End life cycle): BCA-DDA-UAT-C008
- Add new resources key for Applicant's
- 15:18 Task #261 (Development / Work In Progress): UAT Monitoring for Remittance Application
- 15:10 Task #261: UAT Monitoring for Remittance Application
- UAT has been started by KFH's Chooi. Issues have been reported and are being handle by Grace to escalate to our devel...
- 14:59 Task #398 (Work Completed-End life cycle): BCA-DDA-UAT-C010
- Fixing typo error
- 14:53 Task #54 (Closed - End of life cycle): Reports Modification
- 14:52 Remittance Application Report Task #173 (Closed - End of life cycle): Create Application Report for Demand Draft
- 14:52 Remittance Application Report Task #175 (Closed - End of life cycle): Create Application Report for Banker's Cheque
- 14:51 Remittance Application Report Task #176 (Closed - End of life cycle): Update Consolidated Report
- 14:51 Remittance Application Report Task #184 (Closed - End of life cycle): Create Test Script for report
- 14:50 Remittance Application Report Task #185 (Closed - End of life cycle): Perform internal test for report
- 14:49 Demand Draft Application Bug #116 (Closed - End of life cycle): Scenario: No validate for, Edit NRIC/PASSPORT No. contains...
- 14:49 Demand Draft Application Bug #115 (Closed - End of life cycle): Scenario: Validate all the fields when its blank.
- 14:48 Demand Draft Application Task #107 (Closed - End of life cycle): Test Demand Draft
- 14:47 Demand Draft Application Task #86 (Closed - End of life cycle): Build Demand Draft Functional Test Script
- 14:47 Demand Draft Application Task #50 (Closed - End of life cycle): Validation
- 14:47 Demand Draft Application Task #49 (Closed - End of life cycle): Email & File Creation
- 14:46 Demand Draft Application Task #48 (Closed - End of life cycle): Create Action
- 14:46 Demand Draft Application Task #47 (Closed - End of life cycle): Create GUI
- 14:45 Demand Draft Application Bug #120 (Closed - End of life cycle): validation for all fields test failed
- 14:44 Demand Draft Application Bug #121 (Closed - End of life cycle): NRIC / PASSPORT NO failed to validate alphanumeric
- 14:44 Demand Draft Application Bug #122 (Closed - End of life cycle): failed to validate Postcode that less than 5.
- 14:43 Demand Draft Application Bug #123 (Closed - End of life cycle): Failed to make successful transaction when not insert Part...
- 14:43 Demand Draft Application Bug #129 (Closed - End of life cycle): Failed to validate Amount if contains alphanumeric, in dem...
- 14:42 Demand Draft Application Bug #131 (Closed - End of life cycle): Email Format Is Incorrectly and not according to BRS.
- 14:42 Demand Draft Application Bug #132 (Closed - End of life cycle): Wrong Format for amount in Print Format.
- 14:41 Demand Draft Application Bug #133 (Closed - End of life cycle): Empty Fields in Print Format Format for demand Draft.
- 14:40 Demand Draft Application Bug #138 (Closed - End of life cycle): Validation Failed, Cannot insert Value in Particular Benef...
- 14:40 Demand Draft Application Bug #150 (Closed - End of life cycle): The Actual Result Email didn’t same with Expected Result...
- 14:39 Demand Draft Application Bug #151 (Closed - End of life cycle): The Actual Result Email didn’t same with Expected Result...
- 14:38 Demand Draft Application Bug #152 (Closed - End of life cycle): Failed to Find Report drop down for "New Demand Draft Appl...
- 14:38 Demand Draft Application Bug #196 (Closed - End of life cycle): Need to Justified to Right the Amount in Printing Format.
- 14:38 Demand Draft Application Bug #197 (Closed - End of life cycle): Need to Change the Total to Estimated Total in Printing Fo...
- 14:37 Demand Draft Application Bug #199 (Closed - End of life cycle): Commission Field In Digital Report need to change to Esti...
- 14:36 Bug #389 (Work Completed-End life cycle): BCA-DDA-UAT-C001
- Rename from Application Form Enquiry to Application Enquiry
- 14:36 Remittance Application Enquiry Bug #137 (Closed - End of life cycle): Validation on Status Option Box, failed to sorting based o...
- 14:34 Remittance Application Enquiry Bug #136 (Closed - End of life cycle): Validate on Option Box Account No, cannot sorting the re...
- 14:34 Remittance Application Enquiry Bug #135 (Closed - End of life cycle): Wrong Description on Notes.
- 14:33 Remittance Application Enquiry Task #44 (Closed - End of life cycle): Remittance Application Enquiry Pagination
- 14:33 Remittance Application Enquiry Task #43 (Closed - End of life cycle): Remittance Application Enquiry Action
- 14:32 Remittance Application Enquiry Bug #145 (Closed - End of life cycle): Please Remove Amount Option box as a filter.
- 14:23 Demand Draft Application Bug #203 (Closed - End of life cycle): Demand Draft Report In BRS it use “Customer†but in th...
- 14:23 Demand Draft Application Bug #205 (Closed - End of life cycle): Should be merge Beneficiary Address1 and Beneficiary Addre...
- 14:22 Demand Draft Application Bug #206 (Closed - End of life cycle): Need to change Beneficiary Bank to Beneficiary Bank Name.
- 14:22 Demand Draft Application Bug #207 (Closed - End of life cycle): No Beneficiary Account No in Demand Draft Report.
- 14:21 Demand Draft Application Bug #209 (Closed - End of life cycle): "Commission " need to change to "Estimated Commission" in ...
- 14:11 Demand Draft Application Bug #210 (Closed - End of life cycle): Missing Total in the body report fields.
- 14:07 Demand Draft Application Bug #211 (Closed - End of life cycle): Misssing Delivery in the body report.
- 14:07 Demand Draft Application Bug #212 (Closed - End of life cycle): In BRS " Total Successful Record" but in the Report that i...
- 14:06 Demand Draft Application Bug #214 (Closed - End of life cycle): Missing Grand Total Foreign Currency in the report.
- 14:03 Deployment Staging Task #227 (Closed - End of life cycle): Deploy IBUtils to Staging
- 14:02 Banker's Cheque Application Task #34 (Closed - End of life cycle): Develop Banker's Cheque Application GUI
- 13:59 Banker's Cheque Application Task #36 (Closed - End of life cycle): Banker's Cheque Application Form Action
- 13:58 Banker's Cheque Application Task #37 (Closed - End of life cycle): Banker's Cheque Application Form Print
- 13:57 Banker's Cheque Application Task #38 (Closed - End of life cycle): Banker's Cheque Application Form Email & File
- 13:57 Banker's Cheque Application Task #41 (Closed - End of life cycle): Banker's Cheque Application Form Validation
- 13:57 Banker's Cheque Application Task #85 (Closed - End of life cycle): Build Banker's Cheque Test Script
- 13:56 Banker's Cheque Application Task #106 (Closed - End of life cycle): Test Banker's Cheque Application
- 13:51 Banker's Cheque Application Bug #127 (Closed - End of life cycle): Validation failed to check postcode less than 5.
- 13:51 Banker's Cheque Application Bug #128 (Closed - End of life cycle): Failed to validate Amount if contains alphanumeric.
- 13:50 Banker's Cheque Application Bug #142 (Closed - End of life cycle): Failed to validate Amount if contains alphanumeric
- 13:49 Banker's Cheque Application Bug #144 (Closed - End of life cycle): Wrong Error message for two name, cannot be same.
- 13:49 Banker's Cheque Application Bug #146 (Closed - End of life cycle): Validation failed when Validate Postcode cannot be greater...
- 13:47 Banker's Cheque Application Bug #154 (Closed - End of life cycle): Failed to Find Report drop down for “New Banker's Cheque...
- 13:47 Banker's Cheque Application Feature #194 (Closed - End of life cycle): REPORTTYPE name for banker's cheque application name e...
- 13:45 Banker's Cheque Application Bug #198 (Closed - End of life cycle): Commission Field In Digital Report need to change to Esti...
- 13:45 Banker's Cheque Application Bug #215 (Closed - End of life cycle): Need to change "Applicant" to "Customer" in the report.
- 13:45 Banker's Cheque Application Bug #218 (Closed - End of life cycle): Need to change " Beneficiary Bank " To " Beneficiary Bank ...
- 13:44 Banker's Cheque Application Bug #223 (Closed - End of life cycle): Missing Total Amount RM in trailer Report fields.
- 13:44 Banker's Cheque Application Bug #224 (Closed - End of life cycle): Missing Grant Total Successful Record in trailer report.
- 13:43 Banker's Cheque Application Bug #225 (Closed - End of life cycle): Missing Grant Total Unsuccessful Record in trailer report ...
- 13:41 Task #230: Update BVMC user guide
- What is the status of this task?
- 13:36 Bug #392 (Work Completed-End life cycle): BCA-DDA-UAT-C004
- 12:49 Bug #391 (Work Completed-End life cycle): BCA-DDA-UAT-C003
- Rename Branch to Bank Branch
August 16, 2010
- 17:21 Task #398 (Closed - End of life cycle): BCA-DDA-UAT-C010
- Banker’s Cheque Application (Step 3):
As specified and detailed here I/ -We- we request KFHMB to issue -Demand Dra... - 17:17 Task #397 (Closed - End of life cycle): BCA-DDA-UAT-C009
- Clear Button - Only clear the non pre-filled fields (i.e. fields manually input by user).
- 17:16 Task #396 (Closed - End of life cycle): BCA-DDA-UAT-C008
- Error Message – to differentiate the fields for Applicant or Beneficiary:
Applicant's Name is required.
Applicant... - 17:14 Task #395 (Closed - End of life cycle): BCA-DDA-UAT-C007
- Prefill applicant profile incomplete:
a) Address 2 and Address 3 are missing.
b) Country incorrect
c) Insert Stat... - 17:13 Remittance Application Enquiry Task #394 (Closed - End of life cycle): BCA-DDA-UAT-C006
- IB Ref # 5530 Accepted but not reflected in Application Enquiry screen.
- 17:11 Demand Draft Application Task #393 (Closed - End of life cycle): BCA-DDA-UAT-C005
- The following message prompt after clicking "Next" button at Step 3/5.
This transfer service is currently unavailabl... - 17:00 Bug #392 (Closed - End of life cycle): BCA-DDA-UAT-C004
- Spelling mistake in Terms and Conditions.
- 16:59 Bug #391 (Closed - End of life cycle): BCA-DDA-UAT-C003
- To rename "Branch" to "Bank Branch".
- 16:56 Bug #390 (Closed - End of life cycle): BCA-DDA-UAT-C002
- To remove the 1st section (i.e. Logo Perbankan Islam, Logo KFH, Date, and Title) in all the affected steps.
- 16:54 Bug #389 (Closed - End of life cycle): BCA-DDA-UAT-C001
- "Application Form Enquiry" to "Application Enquiry"
- 11:31 Banker's Cheque Application Bug #148 (Closed - End of life cycle): The Actual Result Email didn’t same with Expected Result...