Activity

From October 03, 2013 to November 01, 2013

October 30, 2013

Avatar?id=2607&size=24 20:04 Maybank Bii Internet Banking Phase 2 UAT Bug #3897 (User Acceptance Test): Time Deposit: Account is Closed 54 Error
Rayvandy Gabbytian
Avatar?id=2607&size=24 20:02 Maybank Bii Internet Banking Phase 2 UAT Bug #3897 (Internal Testing): Time Deposit: Account is Closed 54 Error
We do not have closed TD account both in SIT and UAT. Rayvandy Gabbytian
Avatar?id=2607&size=24 20:01 Maybank Bii Internet Banking Phase 2 UAT Bug #3897 (Finished Development): Time Deposit: Account is Closed 54 Error
Rayvandy Gabbytian
Avatar?id=2607&size=24 20:00 Maybank Bii Internet Banking Phase 2 UAT Bug #3897 (Development / Work In Progress): Time Deposit: Account is Closed 54 Error
Rayvandy Gabbytian
Avatar?id=2607&size=24 18:14 Maybank Bii Internet Banking Phase 2 UAT Bug #3897 (Closed - End of life cycle): Time Deposit: Account is Closed 54 Error
Bu Anna reported in production that if one TD account is closed, customer can't see the details of other Active TD. S... Rayvandy Gabbytian
Avatar?id=2607&size=24 18:11 Maybank Bii Internet Banking Phase 2 UAT Bug #3896 (Finished Development): Fund Transfer in FCR: Session Timeout
Rayvandy Gabbytian
Avatar?id=2607&size=24 18:10 Maybank Bii Internet Banking Phase 2 UAT Bug #3896: Fund Transfer in FCR: Session Timeout
Do the ROUND HALF EVEN for all Big Decimals with the scale set to 2.
Rayvandy Gabbytian
Avatar?id=2607&size=24 18:08 Maybank Bii Internet Banking Phase 2 UAT Bug #3896 (Development / Work In Progress): Fund Transfer in FCR: Session Timeout
Rayvandy Gabbytian
Avatar?id=2607&size=24 18:07 Maybank Bii Internet Banking Phase 2 UAT Bug #3896 (Closed - End of life cycle): Fund Transfer in FCR: Session Timeout
Issue reported by Pak Wahyu:
Gabby,

Session Time Out when testing FCR transaction over USD 10.000.

ScreenC...
Rayvandy Gabbytian

October 25, 2013

17:45 Task #3475 (Development / Work In Progress): Data warehouse report
Finished review. But those report not able to get records after run using MainReportGenerator.java. Please fix it. Ngoh Chee Ping

October 24, 2013

12:15 Task #3475 (Pending Review): Data warehouse report
Hi Chee Ping,
Added reports:
- Bill Payment
- Interbank FTT
- Interbank Fund Transfer
- Mobile Reload
- Own A...
Wijaya Kartono

October 23, 2013

Avatar?id=2607&size=24 12:49 Bug #3793 (User Acceptance Test): M2U History: Pagination
Rayvandy Gabbytian
Avatar?id=2607&size=24 12:46 Task #3821 (User Acceptance Test): BII CC Payment: Change De102 Message Format
Rayvandy Gabbytian
11:41 Bug #3793: M2U History: Pagination
* Already done testing.
* The result :
- m2u history show pagination more than 1 page (file attach).
Saputra Febhy Toomy
11:15 Task #3821: BII CC Payment: Change De102 Message Format
* Already done testing.
* The result :
1. For testing on free amount(session expired when click submit), full amo...
Saputra Febhy Toomy

October 22, 2013

Avatar?id=2607&size=24 18:54 Task #3567: MSS BRS
Thomas is reviewing it since 22nd October 2013 evening. Rayvandy Gabbytian
Avatar?id=2607&size=24 18:54 Task #3566 (Pending Customer Feedback): RIB BRS
Thomas is reviewing it since 22nd October 2013 evening. Rayvandy Gabbytian
Avatar?id=2607&size=24 18:54 Task #3567 (Pending Customer Feedback): MSS BRS
Rayvandy Gabbytian
Avatar?id=2607&size=24 18:53 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (User Acceptance Test): New Requirement: Loan "PITA" Account
Rayvandy Gabbytian
Avatar?id=2607&size=24 18:51 Maybank Bii Internet Banking Phase 2 UAT Task #3757 (User Acceptance Test): Mobile Postpaid & Prepaid : Change Format at Bit 37
Rayvandy Gabbytian
Avatar?id=2607&size=24 18:50 Maybank Bii Internet Banking Phase 2 UAT Task #3758 (User Acceptance Test): ON/2 Error Message: To Change Label
Rayvandy Gabbytian
Avatar?id=2607&size=24 18:50 Bug #3793 (Internal Testing): M2U History: Pagination
Mas Toomy,
Kindly test this issue that has been fixed by Najmi.
Test in UAT. Username: ribuser1, password: pass...
Rayvandy Gabbytian
Avatar?id=2607&size=24 18:36 Task #3821 (Internal Testing): BII CC Payment: Change De102 Message Format
Toomy, this item has been deployed to UAT because Pak Rudhi wants to test it.
At the same please assist to make su...
Rayvandy Gabbytian
Avatar?id=2607&size=24 18:31 Task #3821: BII CC Payment: Change De102 Message Format
Done development and deployed to UAT, in order for Pak Rudhi to test. I never get any successful message though De102... Rayvandy Gabbytian
Avatar?id=2607&size=24 18:27 Task #3821 (Development / Work In Progress): BII CC Payment: Change De102 Message Format
Rayvandy Gabbytian
Avatar?id=2607&size=24 15:00 Task #3821 (Closed - End of life cycle): BII CC Payment: Change De102 Message Format
Need to change the De102 Message Format to Host.
Current system: De102 = Currency Code ISO+ From Account
New requ...
Rayvandy Gabbytian
14:54 Task #3467 (Development / Work In Progress): Biller Reconciliation
Ngoh Chee Ping

October 21, 2013

Avatar?id=2607&size=24 17:35 Task #3467: Biller Reconciliation
Hi Chee Ping,
Biller reconciliation requirement has been changed to suit with Typ3 Citynet format.
Please assis...
Rayvandy Gabbytian

October 18, 2013

10:50 Bug #3793 (Finished Development): M2U History: Pagination
Najmi Pasarudin
10:48 Maybank Bii Internet Banking Phase 2 UAT Task #3742 (Finished Development): TAC Window Pop Up Look & Feel
Najmi Pasarudin
10:47 Maybank Bii Internet Banking Phase 2 UAT Task #3742 (Development / Work In Progress): TAC Window Pop Up Look & Feel
Najmi Pasarudin
10:08 Bug #3793 (Development / Work In Progress): M2U History: Pagination
Najmi Pasarudin

October 17, 2013

Avatar?id=2607&size=24 20:53 Task #3496 (Pending Customer Feedback): To change My Plan Account (8XXXXXXXXX) flow
5. My Plan account, show under Savings- need further confirmation about this tomorrow. Requirement is different from ... Rayvandy Gabbytian
Avatar?id=2607&size=24 19:34 Task #3490 (Pending SIT Deployment): User migration: Phone # and Email address
Rayvandy Gabbytian
Avatar?id=2607&size=24 19:33 Task #3490 (Finished Development): User migration: Phone # and Email address
Done and tested locally. Rayvandy Gabbytian
Avatar?id=2607&size=24 19:33 Task #3490 (Development / Work In Progress): User migration: Phone # and Email address
Wsdl has been updated to cater for the existing email thrown by IBS. Wahyu push the item back to us to do development. Rayvandy Gabbytian
Avatar?id=2607&size=24 17:42 Task #3499 (Pending SIT Deployment): BII Credit Card : add "PAY" button
Rayvandy Gabbytian
Avatar?id=2607&size=24 17:41 Task #3499 (Finished Development): BII Credit Card : add "PAY" button
Done and tested. Rayvandy Gabbytian
Avatar?id=2607&size=24 17:39 Task #3499 (Development / Work In Progress): BII Credit Card : add "PAY" button
Issues reported:
2013-10-16 Thomas: If from account blank, it still show. Requested to be:
- no from account: thr...
Rayvandy Gabbytian
Avatar?id=2607&size=24 16:41 Bug #3793 (Closed - End of life cycle): M2U History: Pagination
Najmi, please assist:
Online M2U history which consists more than 2 pages will give this error:
[ServletExcepti...
Rayvandy Gabbytian
Avatar?id=2607&size=24 16:34 Task #3501 (Pending SIT Deployment): Interbank Online: To add "reference no"
Rayvandy Gabbytian
Avatar?id=2607&size=24 16:34 Task #3501 (Finished Development): Interbank Online: To add "reference no"
Rayvandy Gabbytian
Avatar?id=2607&size=24 16:31 Task #3501 (Development / Work In Progress): Interbank Online: To add "reference no"
result does not match with requirement. minimum length = 0, maximum length = 16. Rayvandy Gabbytian
14:05 Maybank Bii Internet Banking Phase 2 UAT Task #3748: New Requirement: Loan "PITA" Account
* Already testing.
* The result (file attach).
- PITA Account can not allow user to do download statement.
Saputra Febhy Toomy
13:47 Maybank Bii Internet Banking Phase 2 UAT Task #3741 (Finished Development): M2U Receipt: Change dual language to single language
Najmi Pasarudin

October 16, 2013

17:10 Maybank Bii Internet Banking Phase 2 SIT Bug #3719 (Finished Development): 6:sent item (Send box)
Query to update DB:
update "DBO"."IB_NAVIGATION"
set PAGE_PATH ='/ib117/secureMailboxMain.do'
where NODE_NAME =...
Yap Kah Yan

October 14, 2013

09:49 Maybank Bii Internet Banking Phase 2 UAT Task #3741 (Development / Work In Progress): M2U Receipt: Change dual language to single language
Najmi Pasarudin

October 11, 2013

Avatar?id=2607&size=24 17:58 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Internal Testing): New Requirement: Loan "PITA" Account
Toomy,
Please assist to test using ribuser/password12345 in bii-rib-sit
1. PITA Account shall be parked under cre...
Rayvandy Gabbytian
Avatar?id=2607&size=24 17:54 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Finished Development): New Requirement: Loan "PITA" Account
Rayvandy Gabbytian
Avatar?id=2607&size=24 17:31 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Development / Work In Progress): New Requirement: Loan "PITA" Account
Requireemnt Change from Pak Wahyu:
PITA Account is a loan account which uses credit card service.
PITA Account wi...
Rayvandy Gabbytian
Avatar?id=2607&size=24 14:46 Maybank Bii Internet Banking Phase 2 UAT Task #3758 (Pending SIT Deployment): ON/2 Error Message: To Change Label
Rayvandy Gabbytian
Avatar?id=2607&size=24 14:45 Maybank Bii Internet Banking Phase 2 UAT Task #3758 (Finished Development): ON/2 Error Message: To Change Label
Done. Rayvandy Gabbytian
Avatar?id=2607&size=24 12:37 Maybank Bii Internet Banking Phase 2 UAT Task #3757 (Internal Testing): Mobile Postpaid & Prepaid : Change Format at Bit 37
Rayvandy Gabbytian
Avatar?id=2607&size=24 12:35 Maybank Bii Internet Banking Phase 2 UAT Task #3757 (Finished Development): Mobile Postpaid & Prepaid : Change Format at Bit 37
Done. Rayvandy Gabbytian
12:27 Maybank Bii Internet Banking Phase 2 SIT Task #3721 (Development / Work In Progress): 34.Fund Transfer > FCR: Transfer to Yen Account shal...
Saputra Febhy Toomy
12:25 Maybank Bii Internet Banking Phase 2 SIT Task #3721: 34.Fund Transfer > FCR: Transfer to Yen Account shall not allow decimal point.
* Already test in http://10.226.16.74:9080/bii-rib-sit/common/Login.do
* The result : show error when submit (file a...
Saputra Febhy Toomy
Avatar?id=2607&size=24 12:08 Maybank Bii Internet Banking Phase 2 UAT Task #3758 (Closed - End of life cycle): ON/2 Error Message: To Change Label
Pak Hakim to give dual language for these items:
• Internet banking Prepaid : informasi screen yang ditampilkan "...
Rayvandy Gabbytian
Avatar?id=2607&size=24 12:05 Maybank Bii Internet Banking Phase 2 UAT Task #3757 (Closed - End of life cycle): Mobile Postpaid & Prepaid : Change Format at Bit 37
This is for Artajasa Certification:
Request from Pak Ridho:
Internet banking Postpaid : informasi screen nomer Re...
Rayvandy Gabbytian

October 10, 2013

16:28 Maybank Bii Internet Banking Phase 2 UAT Task #3742: TAC Window Pop Up Look & Feel
Item 3 - 6, mainly can be done via javascript, however, different browsers & different versions will have it's own wa... Anonymous
14:39 Maybank Bii Internet Banking Phase 2 UAT Task #3740 (Finished Development): M2U Receipt : Reduce font size
Najmi Pasarudin
Avatar?id=2607&size=24 12:47 RIB Phase 2 Development Task #3498: email notification: sending to Beneficiary email if a valid email key in by customer
Hi Toomy,
Update for point #4 & #6:
URL: https://10.225.16.152/owa/
Username: lab\TWicaksono
Password: Bii12345
Rayvandy Gabbytian
12:44 Task #3481 (Finished Development): Change Previous 1 month transaction to 3 months transaction
Najmi Pasarudin
12:42 Maybank Bii Internet Banking Phase 2 SIT Task #3735 (Finished Development): Credit Card Statement
Najmi Pasarudin
Avatar?id=2607&size=24 11:11 RIB Phase 2 Development Task #3498: email notification: sending to Beneficiary email if a valid email key in by customer
Hi Toomy,
How to test in SIT:
1. Perform new interbank online transfer.
2. So far I do not know the beneficiar...
Rayvandy Gabbytian

October 09, 2013

Avatar?id=2607&size=24 05:10 Maybank Bii Internet Banking Phase 2 UAT Task #3736 (User Acceptance Test): Loan account details: Show Amount & Date Format, remove unnece...
Deployed to SIT, INT-UAT, and UAT on 9th October evening. Already informed Pak Aditya via email to test. bii support ... Rayvandy Gabbytian
Avatar?id=2607&size=24 05:09 Maybank Bii Internet Banking Phase 2 UAT Task #3736: Loan account details: Show Amount & Date Format, remove unnecessary notes
Below is the test result. I will attach the screenshot later.
Maturity Date = Feb 1, 2015
Current Interest Balanc...
Rayvandy Gabbytian
Avatar?id=2607&size=24 05:04 Maybank Bii Internet Banking Phase 2 UAT Task #3736 (Internal Testing): Loan account details: Show Amount & Date Format, remove unnecessar...
Rayvandy Gabbytian
Avatar?id=2607&size=24 05:03 Maybank Bii Internet Banking Phase 2 UAT Task #3736 (Finished Development): Loan account details: Show Amount & Date Format, remove unnece...
Rayvandy Gabbytian
Avatar?id=2607&size=24 05:01 Maybank Bii Internet Banking Phase 2 UAT Task #3736: Loan account details: Show Amount & Date Format, remove unnecessary notes
Done as per requested by Pak Aditya. Rayvandy Gabbytian
Avatar?id=2607&size=24 05:00 Maybank Bii Internet Banking Phase 2 UAT Task #3746 (User Acceptance Test): CardPac: Ignore CardPac Error at Account & Summary
I will inform Thomas to test it tomorrow morning. Rayvandy Gabbytian
Avatar?id=2607&size=24 04:58 Maybank Bii Internet Banking Phase 2 UAT Task #3746 (Internal Testing): CardPac: Ignore CardPac Error at Account & Summary
How did I test:
1. Login using ribuser
2. Its GCIF has bunch of account including 2 Credit Cards
3. CardPac syst...
Rayvandy Gabbytian
Avatar?id=2607&size=24 04:55 Maybank Bii Internet Banking Phase 2 UAT Task #3746 (Finished Development): CardPac: Ignore CardPac Error at Account & Summary
Rayvandy Gabbytian
Avatar?id=2607&size=24 04:54 Maybank Bii Internet Banking Phase 2 UAT Task #3746: CardPac: Ignore CardPac Error at Account & Summary
Change the flow of GetMonetaryInfoCCService, whereby no validation will be thrown if its response from host is not su... Rayvandy Gabbytian
Avatar?id=2607&size=24 04:50 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (User Acceptance Test): New Requirement: Loan "PITA" Account
Deployed to both SIT, UAT, INT-UAT (Artajasa Certification). Have not yet told Pak Wahyu to test. I will inform him T... Rayvandy Gabbytian
Avatar?id=2607&size=24 04:48 Maybank Bii Internet Banking Phase 2 UAT Task #3748: New Requirement: Loan "PITA" Account
Tested with PITA account which is 8888881000000755. In BIIAccount.java, I have added checking if accounttypenumber en... Rayvandy Gabbytian
Avatar?id=2607&size=24 04:44 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Internal Testing): New Requirement: Loan "PITA" Account
Rayvandy Gabbytian
Avatar?id=2607&size=24 04:44 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Finished Development): New Requirement: Loan "PITA" Account
Rayvandy Gabbytian
Avatar?id=2607&size=24 04:43 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Development / Work In Progress): New Requirement: Loan "PITA" Account
Hi Lee Yong,
It has been done.
Rayvandy Gabbytian
01:39 Maybank Bii Internet Banking Phase 2 UAT Task #3748: New Requirement: Loan "PITA" Account
Hi Gabby,
Please discuss with customer to get the clear requirements of this PITA account. Then we can discuss on th...
Tan Lee Yong
01:33 Maybank Bii Internet Banking Phase 2 SIT Task #3721 (Internal Testing): 34.Fund Transfer > FCR: Transfer to Yen Account shall not allow de...
Hi Toomy,
Please test. If ok, change the status to SIT and deploy for customer retest.
Tan Lee Yong
01:31 Maybank BII Internet Banking Phase 3 Task #3466: FD withdrawal-change flow
Hi Gabby, please help to follow with customer about this status. Tan Lee Yong
01:29 RIB Phase 2 Development Task #3498 (Internal Testing): email notification: sending to Beneficiary email if a valid email ...
Hi Toomy,
Please test.
Tan Lee Yong
Avatar?id=2607&size=24 18:09 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Closed - End of life cycle): New Requirement: Loan "PITA" Account
Pak Wahyu added PITA Account which account format seems different. His goal previously was to test "Loan account that... Rayvandy Gabbytian
Avatar?id=2607&size=24 17:47 Maybank Bii Internet Banking Phase 2 UAT Task #3746 (Development / Work In Progress): CardPac: Ignore CardPac Error at Account & Summary
Rayvandy Gabbytian
Avatar?id=2607&size=24 17:44 Maybank Bii Internet Banking Phase 2 UAT Task #3746 (Closed - End of life cycle): CardPac: Ignore CardPac Error at Account & Summary
Pak Thomas request this item verbally stating that:
If CardPac (credit card system which handles all related credi...
Rayvandy Gabbytian
Avatar?id=2607&size=24 17:41 Maybank Bii Internet Banking Phase 2 UAT Task #3736 (Development / Work In Progress): Loan account details: Show Amount & Date Format, rem...
Still waiting until ESB fix their issue of transaction file close 90. Else, account & summary can't be accessed, so d... Rayvandy Gabbytian
15:06 Maybank Bii Internet Banking Phase 2 UAT Task #3742: TAC Window Pop Up Look & Feel
Hi Gabby
1. TAC window shall take over the entire screen. The transaction screen will be a foreground and can't be...
Anonymous
14:54 Maybank Bii Internet Banking Phase 2 UAT Task #3740: M2U Receipt : Reduce font size
Hi Gabby,
Previously, the setting was (1)font=10 and (2)line-spacing=20.
Attached is example of (1)font=8 and ...
Najmi Pasarudin
Avatar?id=2607&size=24 14:31 Maybank Bii Internet Banking Phase 2 UAT Task #3742 (Closed - End of life cycle): TAC Window Pop Up Look & Feel
Amy,
Would you able to assist on this?
User expects to have windows TAC not in 'windows pop up form'. If I refe...
Rayvandy Gabbytian
14:15 Maybank Bii Internet Banking Phase 2 UAT Task #3740 (Development / Work In Progress): M2U Receipt : Reduce font size
Najmi Pasarudin
Avatar?id=2607&size=24 13:30 Maybank Bii Internet Banking Phase 2 UAT Task #3741 (Closed - End of life cycle): M2U Receipt: Change dual language to single language
Hi Najmi,
Kindly assist to change the m2u receipt into single language instead of dual language. It means that, th...
Rayvandy Gabbytian
Avatar?id=2607&size=24 13:27 Maybank Bii Internet Banking Phase 2 UAT Task #3740 (Closed - End of life cycle): M2U Receipt : Reduce font size
Hi Najmi,
This is the copy of task https://hub.penril.net/redmine/issues/3500.
According to user the receipt is...
Rayvandy Gabbytian

October 08, 2013

17:54 Maybank Bii Internet Banking Phase 2 SIT Task #3721 (Finished Development): 34.Fund Transfer > FCR: Transfer to Yen Account shall not allo...
Najmi Pasarudin
17:53 RIB Phase 2 Development Task #3498 (Finished Development): email notification: sending to Beneficiary email if a valid em...
Najmi Pasarudin
Avatar?id=2607&size=24 17:01 Maybank Bii Internet Banking Phase 2 UAT Task #3736: Loan account details: Show Amount & Date Format, remove unnecessary notes
This was reported by Aditya and he would like to add more for loan account details:
The fields highlighted in gree...
Rayvandy Gabbytian
Avatar?id=2607&size=24 16:48 Maybank Bii Internet Banking Phase 2 UAT Task #3736 (Closed - End of life cycle): Loan account details: Show Amount & Date Format, remove ...
To remove text: “*Loan Account only for display” in Account & Summary under loan account.
Loan details:
- To add ...
Rayvandy Gabbytian
16:42 Maybank Bii Internet Banking Phase 2 SIT Task #3735 (Development / Work In Progress): Credit Card Statement
OK Najmi Pasarudin
Avatar?id=2607&size=24 16:40 Maybank Bii Internet Banking Phase 2 SIT Task #3735 (Closed - End of life cycle): Credit Card Statement
Najmi,
Could you assist on this?
Current issue:
- Credit card previous/next statement does not have pagination....
Rayvandy Gabbytian
Avatar?id=2607&size=24 16:35 Maybank Bii Internet Banking Phase 2 SIT Task #3734 (Dropped-End of life cycle): FTL: Link Account - Validation Causes Field to Reset
During link account, if the validation pops up (such as host giving error response 1212 Customer Channel already exis... Rayvandy Gabbytian
13:03 Task #3481: Change Previous 1 month transaction to 3 months transaction
Not really. Already change from 1 month to 3 months. The pagination still incomplete. Najmi Pasarudin
Avatar?id=2607&size=24 12:48 Task #3481: Change Previous 1 month transaction to 3 months transaction
Najmi, are you facing any issue with this? Rayvandy Gabbytian

October 04, 2013

18:14 Maybank Bii Internet Banking Phase 2 SIT Task #3721 (Development / Work In Progress): 34.Fund Transfer > FCR: Transfer to Yen Account shal...
Najmi Pasarudin
Avatar?id=2607&size=24 16:49 Task #3566 (Pending Review): RIB BRS
Ms. Lee Lee,
Please review both MSS & RIB BRS v1.1. You can refer to document amendment details, it can link to re...
Rayvandy Gabbytian
Avatar?id=2607&size=24 16:47 Task #3566 (Finished Development): RIB BRS
Done. Rayvandy Gabbytian
16:42 Task #3476 (Pending UAT Deployment): Today's Transaction - kolom Balance
Anonymous
16:41 Maybank Bii Internet Banking Phase 2 SIT Bug #3720 (Work Completed-End life cycle): 16.Today's Transaction - kolom Balance, why all zero?
tested good by Wahyu in SIT. Anonymous
15:01 Task #3472 (Finished Development): employee account for SKN/RTGS transaction
Change to get the charges code from business options, one employee account or gold account will point to 1 changes code. Ngoh Chee Ping
Avatar?id=2607&size=24 14:36 Maybank Bii Internet Banking Phase 2 SIT Bug #3720 (System Integration Test): 16.Today's Transaction - kolom Balance, why all zero?
Already redeployed to bii-rib-sit and ask Wahyu to retest. Waiting for feedback. Rayvandy Gabbytian
13:07 Maybank Bii Internet Banking Phase 2 SIT Bug #3720 (Finished Development): 16.Today's Transaction - kolom Balance, why all zero?
The balance is hide due to previous request. Now change to show balance Ngoh Chee Ping
13:00 Maybank Bii Internet Banking Phase 2 SIT Task #3721: 34.Fund Transfer > FCR: Transfer to Yen Account shall not allow decimal point.
Assign to Najmi because this issue cause by Najmi added one toEmailAddress in FCR module, but in the screen and form-... Ngoh Chee Ping
12:41 Maybank Bii Internet Banking Phase 2 SIT Task #3721 (Closed - End of life cycle): 34.Fund Transfer > FCR: Transfer to Yen Account shall no...
Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya.
Anonymous
12:39 Maybank Bii Internet Banking Phase 2 SIT Bug #3720 (Closed - End of life cycle): 16.Today's Transaction - kolom Balance, why all zero?
Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya.
Anonymous
12:36 Maybank Bii Internet Banking Phase 2 SIT Bug #3719 (Closed - End of life cycle): 6:sent item (Send box)
Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya.
Anonymous
12:21 Task #3483 (Pending UAT Deployment): Requested to remove the footer:About Us | Branches/ATM | Car...
4 oct:
Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya.
P...
Anonymous
12:20 Task #3506 (Pending UAT Deployment): Change TAC notification message
4 oct:
Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya.
P...
Anonymous
12:18 Task #3478 (Pending UAT Deployment): Change Password max length
4 Oct:
Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya.
P...
Anonymous

October 03, 2013

18:48 RIB Phase 2 Development Task #3505 (System Integration Test): Loan Account : Do not show Loan Account which is fully paid
Anonymous
18:47 RIB Phase 2 Development Task #3504 (System Integration Test): Loan Account:show details information
Anonymous
18:46 RIB Phase 2 Development Task #3503 (System Integration Test): Joint account: not allow to show in account & summary and L...
Anonymous
18:45 RIB Phase 2 Development Task #3510 (System Integration Test): Link/Unlink Account page:allow the customer select the acco...
Anonymous
18:43 Task #3501 (System Integration Test): Interbank Online: To add "reference no"
Anonymous
18:42 RIB Phase 2 Development Task #3500 (System Integration Test): M2U Receipt : Reduce font size
Anonymous
18:41 Task #3499 (System Integration Test): BII Credit Card : add "PAY" button
Anonymous
18:39 Task #3496 (System Integration Test): To change My Plan Account (8XXXXXXXXX) flow
Anonymous
18:38 Task #3493 (System Integration Test): Currency Code Create, Edit, and Details page
Anonymous
18:38 Task #3509 (System Integration Test): To change the MT103 message for FCR's Mt103RECVBIC (table) ...
Anonymous
18:37 Task #3490 (System Integration Test): User migration: Phone # and Email address
Anonymous
18:36 Task #3489 (System Integration Test): FCR: changes the MT103 message and value X & XXX
Anonymous
18:35 Task #3488 (System Integration Test): SKN/RTGS: add 2nd charges in MSS
Anonymous
18:33 Task #3507 (System Integration Test): Change the alignment of right buttons
Anonymous
18:28 Task #3506 (System Integration Test): Change TAC notification message
Anonymous
18:26 Task #3478 (System Integration Test): Change Password max length
Anonymous
18:25 Task #3476 (System Integration Test): Today's Transaction - kolom Balance
Anonymous
18:24 Task #3474 (System Integration Test): Foreign Currency : Transaksi Valas - 3 charges (charges 1,2...
Anonymous
18:24 Task #3473 (System Integration Test): Requested the longer Benefinary name and message
Anonymous
18:22 Task #3471 (System Integration Test): Trf SKN/LLG List Destination Bank
Anonymous
18:21 Task #3470 (System Integration Test): Monthly report (refer to new format)
Anonymous
18:21 RIB Phase 2 Development Task #3469 (System Integration Test): Exchange Rate (all items hv foreign currency involved)
Anonymous
18:20 RIB Phase 2 Development Task #3468 (System Integration Test): Bill payment - Oustanding payment request
Anonymous
18:19 Task #3467 (System Integration Test): Biller Reconciliation
Anonymous
18:18 RIB Phase 2 Development Task #3465 (System Integration Test): sent item (Send box)
Anonymous
18:16 Task #3460 (System Integration Test): LLD report
Anonymous
Avatar?id=2607&size=24 18:06 Task #3472 (Development / Work In Progress): employee account for SKN/RTGS transaction
REQUIREMENT CHANGE, Update from Pak Thomas 3rd October 2013 :
- Change the design of employee charges
Current C...
Rayvandy Gabbytian
18:06 Task #3486 (System Integration Test): TAC pop up windows
pls remember to include Najmi latest changes today 3 oct 3:28pm. once deploy to SIT, pls test on the all browsers, th... Anonymous
Avatar?id=2607&size=24 18:02 RIB Phase 2 Development Task #3505 (Pending Customer Feedback): Loan Account : Do not show Loan Account which is fully paid
Pending from Pak Thomas to give the sample data in SIT/UAT, so that it will allow us to do testing.
Refer to email...
Rayvandy Gabbytian
17:51 Task #3486: TAC pop up windows
As per our email to confirm whether technically can it be done and since did not get any reply and others developers ... Anonymous
17:50 Task #3497 (System Integration Test): Fund Transfer > FCR
* Already done testing.
* The result in file attach.
Saputra Febhy Toomy
Avatar?id=2607&size=24 17:18 RIB Phase 2 Development Task #3505 (Finished Development): Loan Account : Do not show Loan Account which is fully paid
Rayvandy Gabbytian
Avatar?id=2607&size=24 17:18 RIB Phase 2 Development Task #3505: Loan Account : Do not show Loan Account which is fully paid
Done. Rayvandy Gabbytian
Avatar?id=2607&size=24 16:46 RIB Phase 2 Development Task #3505 (Development / Work In Progress): Loan Account : Do not show Loan Account which is ful...
Change requirement:
Current Interest Balance = 0
Current Principal Amount = 0
Late Charge Past Due Amount = 0
...
Rayvandy Gabbytian
Avatar?id=2607&size=24 16:30 RIB Phase 2 Development Task #3505 (Pending Customer Feedback): Loan Account : Do not show Loan Account which is fully paid
Update from Thomas, 3rd October 2013 03:28 PM:
Current Interest Balance = 0
Current Principal Amount = 0
Late Ch...
Rayvandy Gabbytian
15:39 RIB Phase 2 Development Task #3492 (System Integration Test): RIB: Bill Payment > Mobile Postpaid.
Anonymous
Avatar?id=2607&size=24 15:31 RIB Phase 2 Development Task #3492 (Pending SIT Deployment): RIB: Bill Payment > Mobile Postpaid.
Hi Lee Lee,
Item had been tested by Toomy at bii-int-sit environment and passed.
This item in fact is now in te...
Rayvandy Gabbytian
Avatar?id=2607&size=24 15:23 Task #3508: To add 1 more item (Terminated) under the drop down list: Pembukaan Deposito: Choice ...
Yes, Further question was raised regarding to this item in this email subject: Re: [BII M2U] Request for Test Data (U... Rayvandy Gabbytian
Avatar?id=2607&size=24 15:20 Task #3497 (Development / Work In Progress): Fund Transfer > FCR
Mas Toomy,
According to above result, the testing was considered FAIL. Kindly look once more into the requirement:...
Rayvandy Gabbytian
Avatar?id=2607&size=24 15:15 Task #3486 (Pending Customer Feedback): TAC pop up windows
Try some research and seems it can not be done for IE.
http://stackoverflow.com/questions/5968779/how-to-make-ie-...
Rayvandy Gabbytian
14:50 Task #3508: To add 1 more item (Terminated) under the drop down list: Pembukaan Deposito: Choice ...
may l know that you are having further question to ask customer in order continue finish the development work or it w... Anonymous
14:49 RIB Phase 2 Development Task #3492: RIB: Bill Payment > Mobile Postpaid.
may l know that you are having further question to ask customer in order continue finish the development work or it w... Anonymous
14:45 Task #3497: Fund Transfer > FCR
may l know that you are having further question to ask customer in order continue finish the development work or it w... Anonymous
14:39 RIB Phase 2 Development Task #3502 (System Integration Test): User migration: To change the current migration progress by...
l would assumed it tested in SIT environment from Penril internal team. so l change to status SIT. Pending Bank team ... Anonymous
13:26 Task #3496 (Finished Development): To change My Plan Account (8XXXXXXXXX) flow
Ngoh Chee Ping
12:50 Task #3566 (Development / Work In Progress): RIB BRS
pls let me know the status for redmine: 3486 in order to update to the FSD. Anonymous
 