Activity
From December 16, 2019 to January 14, 2020
January 14, 2020
- 16:11 5. Training Compilation Issue Task #10583 (Closed - End of life cycle): CDB_Device Pairing TAC
- To add New step (TAC screen) to Device Pairing Function
Step.
1. User click device pairing at BSNeBiz login scr... - 10:54 5. Training Compilation Issue Bug #10582 (Work Completed-End life cycle): IOS_Authorization_Crashed
- Path : Authorization List
Issue : Application crashed
Step
1. User authorize the transaction (approve)
2. In... - 10:41 PRODUCTION Bug #10574: [PROD_005] : Update Remarks & Blank Punch Out
- *Newly added issue:*
*Blank Punch Out Time*
If I punch out from WEB, it will cause punch out time to be blank in ... - 10:29 PRODUCTION Bug #10580 (Finished Development): [PROD_006] : Company's Attendance Date
- To display date dd/MM/yyyy
January 13, 2020
- 18:11 5. Training Compilation Issue Bug #10579 (New - Begin Life Cycle): Android_Authorization_Result Page listing
- Hi Darren,
Kindly fix and reposition the listing follow ios.
Expectation :
-Transaction status to be place... - 18:06 5. Training Compilation Issue Bug #10528 (Development / Work In Progress): IOS - Approver List
- Hi aditya,
The 2nd approver details not display. - 16:39 5. Training Compilation Issue Bug #10565 (Work Completed-End life cycle): Android - Applicatioon crashed
- Tested and passed.
- 16:30 5. Training Compilation Issue Task #10578 (Work Completed-End life cycle): IOS_Add Tnc to Jompay screen
- BSNeBizMobile> Jompay
Hi Adit, kindly add TnC to Jompay screen following adnroid.
Thank yu - 16:29 5. Training Compilation Issue Task #10577 (Work Completed-End life cycle): Add Tnc to Jompay screen
- CDB > Jompay
Hi Najmi, kindly add TnC to Jompay screen
- 16:07 Pineapple HRM Bug #10557 (Work Completed-End life cycle): [Angular] : Register Institution Functionality
- Tested at Staging & Passed. Issue closed.
- 15:35 5. Training Compilation Issue Bug #10576 (Internal Testing): IOS - Time Counter at Transaction Signing
- please retest with version 3 build 67 pointing to SIT.
- 15:33 5. Training Compilation Issue Bug #10576 (Development / Work In Progress): IOS - Time Counter at Transaction Signing
- issue fixed, i check this issue already solve. but because code merging the solution overwrited. change back with the...
January 10, 2020
- 18:27 Internal Testing - CDB Task #10570 (Development / Work In Progress): CDB-Transaction Receipt
- Friday (10/01/2020):
1) Investigating the bugs for Own Account Transfer.
- 18:11 Internal Testing - CDB Task #10569 (Development / Work In Progress): CDB_Demo Screen
- 18:09 Internal Testing - CDB Task #10569: CDB_Demo Screen
- Friday (10/01/2020):
1. Configure the url for demo page in side navigation.
2. Testing the linked demo page from ... - 17:21 5. Training Compilation Issue Bug #10576 (Work Completed-End life cycle): IOS - Time Counter at Transaction Signing
- Fix on time counter at Transaction Signing
Current : 60 sec.
Expected 90 sec.
- 17:06 5. Training Compilation Issue Bug #10565 (Internal Testing): Android - Applicatioon crashed
- 17:06 5. Training Compilation Issue Bug #10565: Android - Applicatioon crashed
- Root cause:
Not check whether the phone GPS is active or not.
Soultion:
Add Checking GPS status - 17:03 5. Training Compilation Issue Bug #10529 (Internal Testing): Android - Approver List
- 17:02 5. Training Compilation Issue Bug #10507 (Internal Testing): Mobile (Android) - Jompay
- 17:01 5. Training Compilation Issue Bug #10507: Mobile (Android) - Jompay
- Cause: Check Box UI not exist causing NullPointer
Solution: add Check Box UI - 16:58 5. Training Compilation Issue Bug #10505 (Internal Testing): Android - GUI
- 16:58 5. Training Compilation Issue Bug #10505: Android - GUI
- Fix aligment From account no
- 16:43 5. Training Compilation Issue Bug #10528 (Internal Testing): IOS - Approver List
- please retest with version 1 build 67 pointing to SIT
- 16:40 5. Training Compilation Issue Bug #10528 (Development / Work In Progress): IOS - Approver List
- left over ios field doesnot included on last build. added new display field for approver name, approver date, approve...
- 16:33 5. Training Compilation Issue Bug #10456 (Internal Testing): IOS MOBILE - Login - Finger Print
- please retest with version 1 build 67 pointing to SIT
- 16:32 5. Training Compilation Issue Bug #10456: IOS MOBILE - Login - Finger Print
- the root cause because new ios 13 os have different behaviour to manage multiple thread. the solution is force the OS...
January 09, 2020
- 18:23 PRODUCTION Bug #10574 (Work Completed-End life cycle): [PROD_005] : Update Remarks & Blank Punch Out
- *Unable to update remarks*
- Popup error, but after refresh the browser still facing the same error.
*Save rema... - 18:22 Internal Testing - CDB Task #10569: CDB_Demo Screen
- Thursday (09/01/2020):
1) Create new jsp page for Demo page.
2) Configure struts-config.xml and tiles-def.xml for n... - 17:53 Pineapple HRM Bug #10494 (Development / Work In Progress): [Angular] 2.0 FTL
- 2. To sent notification after successful company created.
- 17:47 0. CDB_Change Request Enhancement #10112 (Development / Work In Progress): [CR19001] : To add "Collection Receivable" f...
- Hi Najmi, kindly check on the report and data TYPE.
The type of data not display.
Refer my attachment. - 17:32 5. Training Compilation Issue Bug #10385 (Development / Work In Progress): IBAM - Domain user lock / unlock
- Update Flow :
1. IBAM User do 3 times failed login
2. IBAM System locked the user
3. User remain locked even at... - 15:54 PRODUCTION Bug #10573 (New - Begin Life Cycle): [PROD_004] : Company Attendance > Search location not function
- Able to search Location
- 14:59 PRODUCTION Bug #10572 (Work Completed-End life cycle): [PROD_003] : Late by calculate wrongly
- Late by calculate as 8hrs late even though it is not late
Refer Attachment for more information - 14:58 5. Training Compilation Issue Bug #10565: Android - Applicatioon crashed
- coba investigate ni. rasanya nk replicate go to
payment transfer > jompay > crash > click on branch locator - 14:51 PRODUCTION Bug #10571 (Work Completed-End life cycle): [PROD_002] : Remark display at double
- *Scenario :*
Punch In on 7Jan without Punch Out
Punch In on 8Jan and Punch Out with remarks
*Actual Result ... - 11:44 0. CDB_Change Request Enhancement #10421 (Pending Prod Deployment): [CR19002] : To change word “Mobile” to “BSNeBiz” fo...
- Tested and passed for
Wording and logo
Refer attachment.
- 11:31 Internal Testing - IBAM Bug #9285 (Work Completed-End life cycle): IBAM_CDB_Application_Submission_Organization-Setup
- tested and passed
- 11:30 Internal Testing - CDB Bug #10542 (Work Completed-End life cycle): FTL - Reset new password - Validation
- Tested and passed
- 11:20 Internal Testing - CDB Bug #10526 (Development / Work In Progress): CDB - Authorization List - Receipt
- Refer log 10570 - Hafizah.
- 11:08 Internal Testing - CDB Bug #10521 (Work Completed-End life cycle): CDB - Forgot Password Result screen for CA
- Tested and passed.
- 11:00 Internal Testing - CDB Task #10570 (Dropped-End of life cycle): CDB-Transaction Receipt
- To update transaction receipt.
-Include multiple approver details and remarks
Refer attachment. - 10:53 Internal Testing - CDB Task #10569 (Work Completed-End life cycle): CDB_Demo Screen
- To create Demo page.
- 10:48 5. Training Compilation Issue Bug #10452 (Work Completed-End life cycle): Login Migrated User - Security Phrase screen
- Tested and passed.
January 08, 2020
- 18:57 1. CDB_Phase 2 & 3 Development Task #9803 (Internal Testing): [P1_Extended] : To develop BOLT module which allow CDB User to do ...
- Hi Athira,
Please refer to the latest installer package i sent today in email and please perform testing on the ne... - 16:22 5. Training Compilation Issue Bug #10556 (Work Completed-End life cycle): CDB- Authorization-Approver Remark
- Tested and passed.
- 15:19 5. Training Compilation Issue Bug #10566 (Development / Work In Progress): IOS and Android - Failed to login on mobile (Approver)
- 14:06 0. CDB_Change Request Enhancement #10421 (Internal Testing): [CR19002] : To change word “Mobile” to “BSNeBiz” for mobil...
- pls retest
- 12:58 CR19002 - IBAM Enhancement CMS Task #10480: Ibam Enhancement CMS
- query for annual fee
- 12:19 5. Training Compilation Issue Bug #10487 (System Integration Test): Pre Prod - Account Summary
- Tested and passed on penril side.
Waiting for SIT side to do transaction and testing. - 12:17 5. Training Compilation Issue Bug #10566 (Work Completed-End life cycle): IOS and Android - Failed to login on mobile (Approver)
- Failed to login after pairing
Step :
1. User successfully login during FTL.
2. User Logout
3. User re-login... - 12:12 Pineapple HRM Bug #10481 (Work Completed-End life cycle): [Android] 2.0: FTL
- Tested & Passed. Issue Closed.
- 12:08 Pineapple HRM Bug #10483 (Development / Work In Progress): [Android] 4.0: ATTENDANCE
- *Today's Status*
# To cater remarks maximum length 64char
- 12:04 Pineapple HRM Bug #10482 (Development / Work In Progress): [Android] 3.0: HOME
- *Punch Out*
# Punch Out blue ring will display after hold to punch out.
# No need confetti for Punch Out - 12:00 5. Training Compilation Issue Bug #10565 (Work Completed-End life cycle): Android - Applicatioon crashed
- Application crashed.
Step :
1. Login (Via Finger print and key in password)
2. Click Branch Locator
Result :... - 11:56 Pineapple HRM Bug #10483 (Work Completed-End life cycle): [Android] 4.0: ATTENDANCE
- Tested & Passed.
- 11:47 Pineapple HRM Bug #10485 (Work Completed-End life cycle): [Android] 5.0: PROFILE
- Tested & Passed. Issue closed.
January 07, 2020
- 18:20 5. Training Compilation Issue Bug #10564 (Internal Testing): CDB_Bulk Payment_Main note
- Tuesday (07/01/20):
*Main Note:*
1. Change mainNote2 to mainNote1 for cancel payment confirmation page and histor... - 17:55 Internal Testing - CDB Bug #9891 (Development / Work In Progress): Mobile IIOS - System display wrong error message
- *Issue no 1 :*
System still display "Service is currently unavailble" when changing GMT time.
Expected : "Thi... - 17:23 5. Training Compilation Issue Bug #10527 (Work Completed-End life cycle): IOS - Mobile - Quick Balance Login
- Tested and passed
- 17:16 5. Training Compilation Issue Bug #10529 (Development / Work In Progress): Android - Approver List
- Hi Darren,
Please filter the information.
Currently the transaction I made not require a verifier but system d... - 16:14 5. Training Compilation Issue Bug #10564 (Development / Work In Progress): CDB_Bulk Payment_Main note
- 15:04 5. Training Compilation Issue Bug #10505 (Development / Work In Progress): Android - GUI
- Hi Darren,
Bug no 2 still prevails. Kindly fix.
*New Bug.*
_*Wrong indicator.*_
Step :
1. Login via fing... - 14:31 5. Training Compilation Issue Bug #10507 (Development / Work In Progress): Mobile (Android) - Jompay
- Hi Darren this issue happend again.
Same flow.
Others transaction success.
Jompay IOS : Success
Jompay Androi... - 13:46 Internal Testing - CDB Bug #10542 (Internal Testing): FTL - Reset new password - Validation
- Deployed to SIT. Please test.
- 13:46 5. Training Compilation Issue Bug #10556 (Internal Testing): CDB- Authorization-Approver Remark
- Deployed to SIT. Please test.
- 13:45 1. CDB_Phase 2 & 3 Development Task #10362 (Internal Testing): [P1_Extended] : IBAM - Email Notification for checker
- Deployed to SIT. Please test.
- 13:39 5. Training Compilation Issue Bug #10564 (Work Completed-End life cycle): CDB_Bulk Payment_Main note
- To amend the main note and the indicator
All bulk payment transactions.
1. Main note 2 to be Main Note 1
2. I... - 11:55 Pineapple HRM Bug #10482 (Internal Testing): [Android] 3.0: HOME
- 11:46 Pineapple HRM Bug #10485 (Internal Testing): [Android] 5.0: PROFILE
- 11:41 Pineapple HRM Bug #10483 (Internal Testing): [Android] 4.0: ATTENDANCE
- 11:21 PRODUCTION Bug #10561 (Work Completed-End life cycle): [PROD_001] : To wrap text the Profile box at the Pine...
- Tested & Passed. Name max length change to 24char
- 10:29 CR19002 - IBAM Enhancement CMS Task #10480: Ibam Enhancement CMS
- Query for Welcome Pack Management
- 10:01 PRODUCTION Bug #10561 (Internal Testing): [PROD_001] : To wrap text the Profile box at the Pineapple header
- pls retest
January 06, 2020
- 18:28 1. CDB_Phase 2 & 3 Development Task #10362 (Development / Work In Progress): [P1_Extended] : IBAM - Email Notification for checker
- *To Najmi: Ready for deployment.*
Monday (06/01/2020):
1. Fix checker maker email by state and access for edit... - 15:57 Pineapple HRM Bug #10474 (Work Completed-End life cycle): [iOS] 4.0 Attendance (UI)
- Tested & Passed. Issue closed.
- 15:52 Pineapple HRM Bug #10475 (Development / Work In Progress): [iOS] 4.1 Attendance - Show More
- Nur Syamili Abdul Majid wrote:
> Nur Syamili Abdul Majid wrote:
> > Nur Syamili Abdul Majid wrote:
> > > Siti Nora... - 15:43 Pineapple HRM Bug #10533 (Development / Work In Progress): [iOS] 3.0 Home (Functionality)
- All reported issue have been tested & passed except no 2.
- 15:41 Pineapple HRM Bug #10535 (Development / Work In Progress): [iOS] 3.2 Home - Punch In Successful (Functionality)
- No 2 & 3 are tested & Passed.
Pending no. 1 - 15:14 Pineapple HRM Bug #10536 (Work Completed-End life cycle): [iOS] 3.3 Home - Update Remarks (Functionality)
- Tested & Passed. Issue closed.
- 15:08 Pineapple HRM Bug #10559 (Work Completed-End life cycle): [Angular] : Join Company
- Tested & Passed
- 14:17 Pineapple HRM Bug #10558 (Work Completed-End life cycle): [Angular] 3.0 HOME FUNCTIONALITY
- Tested & Passed. Issue closed.
- 12:28 KFH Change Request Bug #10439 (Work Completed-End life cycle): iOS [iphone 7 - iOS 12.4.1]: Skip passcode screen
- 12:28 KFH Change Request Bug #10440 (Work Completed-End life cycle): iOS [iphone 7 - iOS 12.4.1]: Challenge code screen fu...
- 12:27 KFH Change Request Bug #10441 (Work Completed-End life cycle): iOS [iphone 7 - iOS 12.4.1]: Challenge Response scree...
- 12:26 KFH Change Request Bug #10563 (Closed - End of life cycle): iOS [iphone X - iOS 11.4]: No indicator during enter Pas...
- *Issue:*
No indicator shown on the screen that the customer is entering the Passcode.
*Expected:*
Indicator on t... - 12:02 5. Training Compilation Issue Bug #10556 (Development / Work In Progress): CDB- Authorization-Approver Remark
January 03, 2020
- 18:31 1. CDB_Phase 2 & 3 Development Task #10362: [P1_Extended] : IBAM - Email Notification for checker
- Friday(03/01/2020):
1. Request file from client to test email notification for File Processing.
2. Testing for file... - 18:12 5. Training Compilation Issue Change #10513 (User Acceptance Test): Demo Mobile (IOS and Android)
- Tested and passed.
Waiting for UAT testong. - 18:11 0. CDB_Change Request Enhancement #10421 (Development / Work In Progress): [CR19002] : To change word “Mobile” to “BSNe...
- KIndly update the icon from BSNeBIZ to BSNeBiz.
- 18:10 5. Training Compilation Issue Bug #10488 (Work Completed-End life cycle): IBAM_Content - Service Info
- Tested and passed.
- 09:58 1. CDB_Phase 2 & 3 Development Task #10362: [P1_Extended] : IBAM - Email Notification for checker
- *Thursday (03/01/2020):*
1. Install IBM Data Studio for BSN SIT database.
2. Investigating on the file upload and e...
January 02, 2020
- 16:18 CR19002 - IBAM Enhancement CMS Task #10480: Ibam Enhancement CMS
- The query for NEW ADMIN PERMISSION - REPORT
- 15:28 Internal Testing - CDB Bug #10542 (Development / Work In Progress): FTL - Reset new password - Validation
- 12:21 Pineapple HRM Bug #10536 (Internal Testing): [iOS] 3.3 Home - Update Remarks (Functionality)
- Please test for update remarks functionality
- 12:19 Pineapple HRM Bug #10474 (Internal Testing): [iOS] 4.0 Attendance (UI)
- Siti Norahayu Mohd Desa wrote:
> Nur Syamili Abdul Majid wrote:
> > Siti Norahayu Mohd Desa wrote:
> > > *My Att... - 11:37 PRODUCTION Bug #10561 (Work Completed-End life cycle): [PROD_001] : To wrap text the Profile box at the Pine...
- To add wrap text function if nickname display is more than 16char
December 31, 2019
- 09:45 Pineapple HRM Bug #10495: [Angular] 3.0 HOME
- hi nisa, masi gak bisa
- 09:43 Pineapple HRM Bug #10559 (Internal Testing): [Angular] : Join Company
- pls retest
- 09:43 Pineapple HRM Bug #10558 (Internal Testing): [Angular] 3.0 HOME FUNCTIONALITY
- pls retest
- 09:43 Pineapple HRM Bug #10557 (Internal Testing): [Angular] : Register Institution Functionality
- pls retest
December 30, 2019
- 09:50 KFH Change Request Bug #10442 (Work Completed-End life cycle): iOS [iphone 7 - iOS 12.4.1]: Invalid Challenge Respon...
December 27, 2019
- 18:27 1. CDB_Phase 2 & 3 Development Task #10362: [P1_Extended] : IBAM - Email Notification for checker
- Thursday (26/12/2019):
1. Testing email notification for company application and company submission.
Friday (27/1... - 17:49 5. Training Compilation Issue Bug #10231 (Development / Work In Progress): Mobile_IOS_Camera GUI
- GOOD JOB DEAR SISTER.
The GUI look much more better than before,
But,
There just a lil bit tu fix, refer m... - 17:36 5. Training Compilation Issue Bug #10350 (Work Completed-End life cycle): IOS UAT > Remarks Authorization screen (Approver)
- Tested and passed.
Thanks sissy. Good Job ! - 17:27 5. Training Compilation Issue Bug #10514 (Work Completed-End life cycle): IOS Mobile - Jompay
- Tested and passed.
Thanks sis. - 16:01 Pineapple HRM Bug #10559 (Work Completed-End life cycle): [Angular] : Join Company
- *i. To test on invalid Invitation Code*
Insert invalid invitation code
_*Actual Result:*_ Incorrect invitation c... - 15:40 5. Training Compilation Issue Bug #10548 (Work Completed-End life cycle): IOS-Branch Locator- Ejen Bank
- Tested and passed.
Thank you sissy ! - 15:27 Pineapple HRM Bug #10558 (Work Completed-End life cycle): [Angular] 3.0 HOME FUNCTIONALITY
- *i. To test on Punch In function*
After create company, session not refresh. After punch in, system not display re... - 14:54 Pineapple HRM Bug #10557 (Work Completed-End life cycle): [Angular] : Register Institution Functionality
- *To test on Successful Registration Screen*
_Tested in Safari_
+Invite Members button+
Invite to Join company fi... - 12:01 5. Training Compilation Issue Bug #10556 (Work Completed-End life cycle): CDB- Authorization-Approver Remark
- Remark not appears.
Step :
Approver do authorozation and insert remark.
Result : remark not appear. - 11:57 5. Training Compilation Issue Change #10513 (Internal Testing): Demo Mobile (IOS and Android)
- Pls test thank you
- 11:56 5. Training Compilation Issue Bug #10231 (Internal Testing): Mobile_IOS_Camera GUI
- Pls re-test/
- 11:39 CR19002 - IBAM Enhancement CMS Task #10480: Ibam Enhancement CMS
- The query for ADMIN SEQUENCE NUMBER - REPORT
- 11:24 Pineapple HRM Bug #10475 (Internal Testing): [iOS] 4.1 Attendance - Show More
- Nur Syamili Abdul Majid wrote:
> Nur Syamili Abdul Majid wrote:
> > Siti Norahayu Mohd Desa wrote:
> > > *Today's... - 11:22 Pineapple HRM Bug #10533 (Internal Testing): [iOS] 3.0 Home (Functionality)
- Siti Norahayu Mohd Desa wrote:
> BRAVOO!!!!
>
> Tested & Passed except:
> 6. To open validation for remark fie... - 11:20 Pineapple HRM Bug #10535 (Internal Testing): [iOS] 3.2 Home - Punch In Successful (Functionality)
- Pls re-test for 2 and 3 only
- 10:54 5. Training Compilation Issue Bug #10350 (Internal Testing): IOS UAT > Remarks Authorization screen (Approver)
- Dear athira, pls re-test. Tq
- 09:25 Pineapple HRM Bug #10495: [Angular] 3.0 HOME
- Hi Darren,
The link is updated in the email template.
December 26, 2019
- 17:41 0. CDB_Change Request Enhancement #10421 (Internal Testing): [CR19002] : To change word “Mobile” to “BSNeBiz” for mobil...
- finish development
- 17:31 0. CDB_Change Request Enhancement #10421 (Development / Work In Progress): [CR19002] : To change word “Mobile” to “BSNe...
- Hi darren, pls do changes at below issue.. denks !
Nurul Athira Abdul Rahim wrote:
> Hi Darren kindly change ‘L... - 10:46 Pineapple HRM Bug #10536 (Development / Work In Progress): [iOS] 3.3 Home - Update Remarks (Functionality)
- Hi Mili,
Failed to update remarks. tq - 10:33 Pineapple HRM Bug #10540 (Development / Work In Progress): [iOS] 5.0 Profile Functionality
- Nur Syamili Abdul Majid wrote:
> Siti Norahayu Mohd Desa wrote:
> > 1. Tested. But need to wrap text for name that...
December 24, 2019
- 18:28 1. CDB_Phase 2 & 3 Development Task #10362: [P1_Extended] : IBAM - Email Notification for checker
- TUESDAY(24/12/2019):
1. Testing email notification for edit Organization settings, company secure pas and company ma... - 17:58 5. Training Compilation Issue Bug #10514 (Internal Testing): IOS Mobile - Jompay
- Pls re-test thank u
- 17:36 5. Training Compilation Issue Bug #10548 (Internal Testing): IOS-Branch Locator- Ejen Bank
- pls re-test
- 16:04 5. Training Compilation Issue Bug #10507 (Internal Testing): Mobile (Android) - Jompay
- ICBS issue
- 16:04 5. Training Compilation Issue Bug #10529 (Internal Testing): Android - Approver List
- finish development
- 16:04 5. Training Compilation Issue Bug #10505 (Internal Testing): Android - GUI
- 1. bugs present because of device bug and third party keyboard app (swift key)
2. finish development - 14:53 Pineapple HRM Bug #10475 (Development / Work In Progress): [iOS] 4.1 Attendance - Show More
- 14:50 Pineapple HRM Bug #10533 (Development / Work In Progress): [iOS] 3.0 Home (Functionality)
- BRAVOO!!!!
Tested & Passed except:
6. To open validation for remark field NOT compulsory. - 09:10 5. Training Compilation Issue Change #10513: Demo Mobile (IOS and Android)
- re assign to mili
@mili please make sure uat build ready for this - 09:08 5. Training Compilation Issue Bug #10514: IOS Mobile - Jompay
- re assign to mili
@mili please check with demo mode off. last i checked with demo mode on cant replicate this.
che... - 09:05 5. Training Compilation Issue Bug #10528: IOS - Approver List
- reassign to mili.
@mili please take a look this is not bug there is additional field need to show
December 23, 2019
- 18:26 1. CDB_Phase 2 & 3 Development Task #10362: [P1_Extended] : IBAM - Email Notification for checker
- Monday(23/12/2019):
1. Fix validation for mobile navigation for NAME EN text field.
2. Testing email notification o... - 18:19 Pineapple HRM Bug #10533 (Internal Testing): [iOS] 3.0 Home (Functionality)
- *pls test except for no 2*
- 18:18 5. Training Compilation Issue Bug #10548 (Work Completed-End life cycle): IOS-Branch Locator- Ejen Bank
- Application crashed after click agent bank
1. click bank branch
2. click agent bank
Result : Application crashed. - 18:17 Pineapple HRM Bug #10536 (Internal Testing): [iOS] 3.3 Home - Update Remarks (Functionality)
- *pls retest*
- 18:16 Pineapple HRM Bug #10540 (Internal Testing): [iOS] 5.0 Profile Functionality
- Siti Norahayu Mohd Desa wrote:
> 1. Tested. But need to wrap text for name that exceed 16char *pls retest*
> 2. Te... - 18:15 Pineapple HRM Bug #10475 (Internal Testing): [iOS] 4.1 Attendance - Show More
- Nur Syamili Abdul Majid wrote:
> Siti Norahayu Mohd Desa wrote:
> > *Today's Status*
> > # Punch In status and re... - 18:01 Pineapple HRM Bug #10494 (Internal Testing): [Angular] 2.0 FTL
- Hi Kak Ayu,
Please retest as per below
*2.0 FTL Select Company*
Join Company & Create New Company Font NOT SA... - 18:01 Pineapple HRM Bug #10496 (Work Completed-End life cycle): [Angular] 4.0 ATTENDANCE
- Tested & Passed.
GOOD JOB!!!!!
- 17:58 Internal Testing - IBAM Bug #10522 (Work Completed-End life cycle): IBAM - Company workflow
- Tested and passed.
- 17:54 Pineapple HRM Bug #10495: [Angular] 3.0 HOME
- hi nisa pls add https://db.penril.my/pineapple/login in the email template
> *3.1.4 Home - Invite Member*
> # T... - 17:49 Pineapple HRM Bug #10495 (Development / Work In Progress): [Angular] 3.0 HOME
- Siti Norahayu Mohd Desa wrote:
> *Homepage*
> Please follow font as per template given.
>
> *3.1.2 Home - Loca... - 17:41 5. Training Compilation Issue Enhancement #10450 (Pending UAT Deployment): CDB - Random Login Phrase
- Tested and passed following given scenarios.
- 17:16 0. CDB_Change Request Enhancement #10112: [CR19001] : To add "Collection Receivable" function to services
- Testing and passed for
-Create new application (CDB)
-Create new application (IBAM with full flow)
-Edit user a... - 17:05 Pineapple HRM Bug #10476 (Development / Work In Progress): [iOS] 5.0 Profile
- Nur Syamili Abdul Majid wrote:
> Siti Norahayu Mohd Desa wrote:
> > Nur Syamili Abdul Majid wrote:
> > > Siti Nor... - 16:59 Pineapple HRM Bug #10496 (Internal Testing): [Angular] 4.0 ATTENDANCE
- 16:58 Pineapple HRM Bug #10495 (Internal Testing): [Angular] 3.0 HOME
- *pls retest all*
- 16:54 Pineapple HRM Bug #10540 (Development / Work In Progress): [iOS] 5.0 Profile Functionality
- 1. Tested. But need to wrap text for name that exceed 16char
2. Tested & Passed.
3. Tested but need to alter Profil... - 16:46 Pineapple HRM Bug #10475 (Development / Work In Progress): [iOS] 4.1 Attendance - Show More
- 13:36 Pineapple HRM Bug #10540 (Internal Testing): [iOS] 5.0 Profile Functionality
- 13:35 Pineapple HRM Bug #10476 (Internal Testing): [iOS] 5.0 Profile
- Siti Norahayu Mohd Desa wrote:
> Nur Syamili Abdul Majid wrote:
> > Siti Norahayu Mohd Desa wrote:
> > > *5.0 Pr...
December 20, 2019
- 18:33 1. CDB_Phase 2 & 3 Development Task #10362: [P1_Extended] : IBAM - Email Notification for checker
- Friday(20/12/2019):
1. Testing email notification on create, edit and delete for for bib navigation, maker checker m... - 18:27 Pineapple HRM Change #10524: [Angular] : Invitation Email
- Nisa, please include link for download both IOS and Android.
Thanks - 16:24 CR19002 - IBAM Enhancement CMS Task #10480: Ibam Enhancement CMS
- Query to add a new column with the name 'MAIN_ACCOUNT_NO'
- 12:32 Pineapple HRM Bug #10475 (Internal Testing): [iOS] 4.1 Attendance - Show More
- Siti Norahayu Mohd Desa wrote:
> *Today's Status*
> # Punch In status and remarks margin too far from Today's Stat... - 11:49 Pineapple HRM Bug #10493 (Work Completed-End life cycle): [Angular] 1.0 LOGIN
- Siti Norahayu Mohd Desa wrote:
> Darren Gee Teik Aun wrote:
> > Siti Norahayu Mohd Desa wrote:
> > > # -Margin f... - 11:37 Pineapple HRM Bug #10534 (Work Completed-End life cycle): [iOS] 3.1 Home - Hold to Punch In (Functionality)
- Tested & Passed.
- 11:35 Pineapple HRM Bug #10473 (Work Completed-End life cycle): [iOS] 3.2 Home - Punch Out
- Tested & Passed except the snack bar. However i already open it in functionality issue. TQ
Issue Closed. - 11:30 Pineapple HRM Bug #10472 (Development / Work In Progress): [iOS] 3.0 Home (UI)
- Nur Syamili Abdul Majid wrote:
> Siti Norahayu Mohd Desa wrote:
> > Nur Syamili Abdul Majid wrote:
> > > Siti Nor... - 11:19 Pineapple HRM Bug #10539 (Work Completed-End life cycle): [iOS] Unable to change User using same phone.
- Tested & Passed. System able to change the user and redirect to Home page.
Issue Closed.
December 19, 2019
- 18:36 Pineapple HRM Bug #10472 (Internal Testing): [iOS] 3.0 Home (UI)
- Siti Norahayu Mohd Desa wrote:
> Nur Syamili Abdul Majid wrote:
> > Siti Norahayu Mohd Desa wrote:
> > > # -Gree... - 18:26 Pineapple HRM Bug #10534 (Internal Testing): [iOS] 3.1 Home - Hold to Punch In (Functionality)
- 18:25 Pineapple HRM Bug #10472 (Development / Work In Progress): [iOS] 3.0 Home (UI)
- Apa kau buat nabillaaaaa!!!!
- 18:23 1. CDB_Phase 2 & 3 Development Task #10362: [P1_Extended] : IBAM - Email Notification for checker
- Thursday (19/12/2019):
1. Add checker maker email by state and access for tiered_charges in Content Module & company... - 18:21 Pineapple HRM Bug #10472 (Internal Testing): [iOS] 3.0 Home (UI)
- Siti Norahayu Mohd Desa wrote:
> # Greeting Note margin too high (refer image) *pls re-test*
> # To enable select ... - 18:17 Pineapple HRM Bug #10473 (Internal Testing): [iOS] 3.2 Home - Punch Out
- 18:15 Pineapple HRM Bug #10539 (Internal Testing): [iOS] Unable to change User using same phone.
- 16:06 Pineapple HRM Bug #10540 (Development / Work In Progress): [iOS] 5.0 Profile Functionality
December 18, 2019
- 18:27 1. CDB_Phase 2 & 3 Development Task #10362: [P1_Extended] : IBAM - Email Notification for checker
- Wednesday (18/12/2019):
1. Test email notification on create, edit and delete for Content Module (Interbank, Notices... - 17:48 Pineapple HRM Bug #10533 (Development / Work In Progress): [iOS] 3.0 Home (Functionality)
- 16:07 Internal Testing - CDB Bug #10542 (Work Completed-End life cycle): FTL - Reset new password - Validation
- System accept unlisted symbol as password
Step :
1. I enter my password "Aaaa@321....."
2. System accepted.
E... - 14:06 Pineapple HRM Change #10524: [Angular] : Invitation Email
- Download link did not work cause I did not put any link inside. The pineapple developer must add themselves. The invi...
- 14:01 5. Training Compilation Issue Bug #10515 (Internal Testing): IOS BSNeBIZ - GUI
- Hi athira,
1. For redundant demo screen, it is actually not bugs but it is the features from IOS13.
2. After made... - 13:40 Pineapple HRM Bug #10493 (Development / Work In Progress): [Angular] 1.0 LOGIN
- Darren Gee Teik Aun wrote:
> Siti Norahayu Mohd Desa wrote:
> > # Margin for 'Continue with Google' button to far ... - 12:04 Pineapple HRM Bug #10540 (Finished Development): [iOS] 5.0 Profile Functionality
- Hi Mili,
Please fix based on below checklist - 11:46 Pineapple HRM Bug #10539 (Work Completed-End life cycle): [iOS] Unable to change User using same phone.
- +*Step to reproduce*+
1. Sign Out current user
2. Login using different existing user.
3. System still display ... - 11:21 Pineapple HRM Bug #10536 (Work Completed-End life cycle): [iOS] 3.3 Home - Update Remarks (Functionality)
- Hi Mili,
Please fix based on below checklist
- 11:16 Pineapple HRM Bug #10535 (Finished Development): [iOS] 3.2 Home - Punch In Successful (Functionality)
- Hi Mili,
Please fix based on below checklist - 10:54 Pineapple HRM Bug #10534 (Work Completed-End life cycle): [iOS] 3.1 Home - Hold to Punch In (Functionality)
- Hi Mili,
Please fix based on below checklist. - 10:48 Pineapple HRM Bug #10533 (Development / Work In Progress): [iOS] 3.0 Home (Functionality)
- Hi Mili,
Please fix based on below checklist - 10:05 5. Training Compilation Issue Bug #10515 (Development / Work In Progress): IOS BSNeBIZ - GUI
December 17, 2019
- 18:26 1. CDB_Phase 2 & 3 Development Task #10362 (Internal Testing): [P1_Extended] : IBAM - Email Notification for checker
- Tuesday (17/12/2019):
1. Add checker maker email by state and access for ss124_company_secure_pas, ss129_bib_navigat... - 17:55 5. Training Compilation Issue Bug #10515: IOS BSNeBIZ - GUI
- To change wording "Login your BSN Account" to "Login your BSNeBiz account"
- 17:30 5. Training Compilation Issue Change #10513 (Pending UAT Deployment): Demo Mobile (IOS and Android)
- ...
- 16:10 Internal Testing - CDB Bug #9891 (Internal Testing): Mobile IIOS - System display wrong error message
- check this ticket please,
- 16:09 5. Training Compilation Issue Bug #10527 (Internal Testing): IOS - Mobile - Quick Balance Login
- please retest
- 16:08 5. Training Compilation Issue Bug #10527 (Finished Development): IOS - Mobile - Quick Balance Login
- 16:08 5. Training Compilation Issue Bug #10527: IOS - Mobile - Quick Balance Login
- Root cause missing delegate on the view controller. solution add the missing delegate
- 16:01 5. Training Compilation Issue Enhancement #10450 (Internal Testing): CDB - Random Login Phrase
- Please test in SIT.
Test scenario:
# Please prepare at least 3 wrong usernames.
# Access bsn-cdb-sit.
# Login a... - 15:55 Internal Testing - CDB Bug #10526 (Internal Testing): CDB - Authorization List - Receipt
- Please test in SIT.
Test scenario:
# Access bsn-cdb-sit as CA.
# Update approval matrix with Verifier and multip... - 15:51 5. Training Compilation Issue Bug #10433 (Work Completed-End life cycle): IOS - User Interface Issue
- Tested and passed for both issue.
Refer attachment - 15:17 5. Training Compilation Issue Bug #10385 (Internal Testing): IBAM - Domain user lock / unlock
- Please test in bsn-admin-sit.
Test scenario:
# Access bsn-admin-sit.
# Use a BSN domain username and key in wron... - 15:09 5. Training Compilation Issue Bug #10457 (Work Completed-End life cycle): IOS Mobile - Quick Balance
- Tested and passed.
Refer attachment. - 12:18 Pineapple HRM Bug #10476 (Development / Work In Progress): [iOS] 5.0 Profile
- 12:17 Pineapple HRM Bug #10476: [iOS] 5.0 Profile
- Nur Syamili Abdul Majid wrote:
> Siti Norahayu Mohd Desa wrote:
> > *5.0 Profile*
> > # Institution Name display... - 12:07 5. Training Compilation Issue Bug #10489 (Work Completed-End life cycle): IBAM - Transaction Enquiry
- Tested and passed.
- 12:02 5. Training Compilation Issue Bug #10501 (Work Completed-End life cycle): IBAM-CDB_Promotion / Anounchment
- Tested and passed.
Refer attachment for CDB and IBAM. - 11:55 Pineapple HRM Bug #10474 (Development / Work In Progress): [iOS] 4.0 Attendance (UI)
- Nur Syamili Abdul Majid wrote:
> Siti Norahayu Mohd Desa wrote:
> > *My Attendance*
> >
> > # My Attendance ma... - 11:50 Pineapple HRM Bug #10473 (Development / Work In Progress): [iOS] 3.2 Home - Punch Out
- # Punch out button need to hold for 3 sec to punch out.
# To remain punch in input in order to punch out. Please ch... - 11:39 Pineapple HRM Bug #10472 (Development / Work In Progress): [iOS] 3.0 Home (UI)
- 11:38 Pineapple HRM Bug #10472: [iOS] 3.0 Home (UI)
- Nur Syamili Abdul Majid wrote:
> Siti Norahayu Mohd Desa wrote:
> > # -Greeting Note margin too high (refer image)... - 11:06 Pineapple HRM Change #10524 (Development / Work In Progress): [Angular] : Invitation Email
- Hi Haziq,
Can you please help to update the invitation email html file as per required,
- replace android & ios b...
December 16, 2019
- 18:44 Pineapple HRM Bug #10493 (Internal Testing): [Angular] 1.0 LOGIN
- fix margin, finish dev
- 18:33 1. CDB_Phase 2 & 3 Development Task #10362: [P1_Extended] : IBAM - Email Notification for checker
- Monday (16/12/2019):
1. Testing delete content and category for Zakat Type. BBE > Content > Zakat Type
2. Learn to ... - 18:30 5. Training Compilation Issue Bug #10529 (Development / Work In Progress): Android - Approver List
- Hi Darren,
Kindly update approver screen following Web.
To add : Authorizer details (Refer attachment) - 18:29 5. Training Compilation Issue Bug #10528 (Work Completed-End life cycle): IOS - Approver List
- Hi Adit,
Kindly update approver screen following Web.
To add : Authorizer details (Refer attachment) - 17:55 Pineapple HRM Bug #10476 (Internal Testing): [iOS] 5.0 Profile
- Siti Norahayu Mohd Desa wrote:
> *5.0 Profile*
> # Institution Name display too far from Profile title *pls retes... - 17:53 Pineapple HRM Bug #10472 (Internal Testing): [iOS] 3.0 Home (UI)
- Siti Norahayu Mohd Desa wrote:
> # Greeting Note margin too high (refer image) *pls retest*
> # To enable select l... - 17:51 Pineapple HRM Bug #10474 (Internal Testing): [iOS] 4.0 Attendance (UI)
- Siti Norahayu Mohd Desa wrote:
> *My Attendance*
>
> # My Attendance margin not standard in iphone 6s plus *pls... - 17:49 Pineapple HRM Bug #10474: [iOS] 4.0 Attendance (UI)
- Siti Norahayu Mohd Desa wrote:
> *My Attendance*
>
> # My Attendance margin not standard in iphone 6s plus. *pl... - 17:44 Pineapple HRM Bug #10473 (Internal Testing): [iOS] 3.2 Home - Punch Out
- 17:30 5. Training Compilation Issue Bug #10244 (Work Completed-End life cycle): CDB_Wrong Stamped Logo (Receipt)
- Tested and passed.
Log closed. - 17:25 Internal Testing - CDB Bug #10525 (Rejected - End of life cycle): CDB - Authorization List
- Noted.
Issue closed. - 17:23 5. Training Compilation Issue Bug #10350 (Development / Work In Progress): IOS UAT > Remarks Authorization screen (Approver)
- 15:13 5. Training Compilation Issue Bug #10527 (Work Completed-End life cycle): IOS - Mobile - Quick Balance Login
- Step :
1. User login to cdb mobile using finger print scanning
2. System display quick balance screen
3. User clic... - 15:09 Internal Testing - CDB Bug #10526 (Development / Work In Progress): CDB - Authorization List - Receipt
- 15:07 Internal Testing - CDB Bug #10525 (Internal Testing): CDB - Authorization List
- There is no issue with approver's name. Based on IBAM Organization Setup > User Maintenance, the approver's full name...
- 14:59 Internal Testing - CDB Bug #10525 (Development / Work In Progress): CDB - Authorization List
- 14:43 Internal Testing - CDB Bug #10526 (Closed - End of life cycle): CDB - Authorization List - Receipt
- Receipt error.
Step :
1. Initiator create transaction
2. 1st approver aprroved
3. 1st approver download receipt... - 14:35 Internal Testing - CDB Bug #10525 (Rejected - End of life cycle): CDB - Authorization List
- System not display approver name
Step
1. Initiator create transaction
2. 1st approver approved
3. 2nd approve... - 11:10 Internal Testing - CDB Bug #10521 (Internal Testing): CDB - Forgot Password Result screen for CA
- 10:17 Pineapple HRM Bug #10496: [Angular] 4.0 ATTENDANCE
- Siti Norahayu Mohd Desa wrote:
> *4.1 My Attendance*
-> # My Attendance header not following template style
-
... - 10:09 Pineapple HRM Bug #10495: [Angular] 3.0 HOME
- Siti Norahayu Mohd Desa wrote:
> *Homepage*
> Please follow font as per template given.
>
-> *3.1.2 Home - Loc... - 10:08 5. Training Compilation Issue Bug #10457 (Internal Testing): IOS Mobile - Quick Balance
- please retest
- 10:08 5. Training Compilation Issue Bug #10457 (Development / Work In Progress): IOS Mobile - Quick Balance
- root cause ios use substring to show RM and Balance seperately, solution instead using substring just show all balanc...
- 10:00 Pineapple HRM Bug #10494: [Angular] 2.0 FTL
- Siti Norahayu Mohd Desa wrote:
> *2.0 FTL Select Company*
-> # Join Company icon not same as given template
- (I... - 09:56 Pineapple HRM Bug #10493: [Angular] 1.0 LOGIN
- Siti Norahayu Mohd Desa wrote:
> # Margin for 'Continue with Google' button to far from greeting message.
-> # Cha...
Also available in: Atom