Activity

From February 23, 2024 to March 23, 2024

March 22, 2024

16:19 2. Inhouse Task (Development & QA) Task #13947 (Pending SIT Deployment): Typo word for "GET IT"
Bin Hamzah Muhammad Fadhly
16:18 2. Inhouse Task (Development & QA) Task #13947 (Work Completed-End life cycle): Typo word for "GET IT"
Issue: Currently the word inside the button for last page of tutorial is "GET IT"
Fix: Change "GET IT" to "GOT IT"
Bin Hamzah Muhammad Fadhly
14:59 2. Inhouse Task (Development & QA) Task #13943 (Pending SIT Deployment): Unable to click OK in Logout page when session timeout from...
Binti Marobi Athirah Umairah

March 21, 2024

15:33 2. Inhouse Task (Development & QA) Task #13943 (Internal Testing): Unable to click OK in Logout page when session timeout from Quick...
Bin Hamzah Muhammad Fadhly
15:33 2. Inhouse Task (Development & QA) Task #13943 (Closed - End of life cycle): Unable to click OK in Logout page when session timeout ...
+*Step to reproduce:*
1. Login in iOS
2. Open quick balance
3. Login in android
4. Ios showed that logout screen
...
Bin Hamzah Muhammad Fadhly
15:10 2. Inhouse Task (Development & QA) Task #13881 (Development / Work In Progress): Service under maintenance (iOS)
Bin Hamzah Muhammad Fadhly
15:10 2. Inhouse Task (Development & QA) Task #13881: Service under maintenance (iOS)
Test defect during SIT down
1) (Mobile) Check production code for checkVersion behavior when Biometric is set
2) (i...
Bin Hamzah Muhammad Fadhly
09:44 2. Inhouse Task (Development & QA) Monitor_Task #13942: Digital Services Act Compliance with respect to European Union law
Sent follow up email to Asrul and Aznil on 20th March 2024 due to no response Bin Hamzah Muhammad Fadhly

March 20, 2024

17:09 PROFESSIONAL SERVICES - QA Documentation #13934: BRFD_CR24003 - BSNeBiz - New API to OCMS Project Server
Update on process flow. Aziana Nurul
12:50 2. Inhouse Task (Development & QA) Task #13874: BSN Post Production Issues (iOS)
BSN (iOS v3.3.6 Build 39): https://testflight.apple.com/join/D69PNezx
Penril (iOS v3.3.6 Build 38): https://testflig...
Binti Marobi Athirah Umairah

March 19, 2024

15:03 2. Inhouse Task (Development & QA) Task #13876 (System Integration Test): BSN Post Production Issues (Android)
SIT v2.1.2 Build 7(BSN)
https://penrilsb-my.sharepoint.com/:u:/g/personal/luqman_hakim_penril_net/EdhF6A-gVfxMj8EMo2...
Binti Marobi Athirah Umairah
13:58 PROFESSIONAL SERVICES - QA Documentation #13938 (Development / Work In Progress): BRFD_CR24002 - BSNeBiz - Dormant Account
Binti Azauddin Nurin Sabrina
12:59 PROFESSIONAL SERVICES - QA Documentation #13939 (Development / Work In Progress): Test Script_CR24003 - BSNeBiz - New API to...
Nothing much could be done as i need to wait for the BRFD to be done finished first as now its only finished 10% by Nuna Bin Mior Kamarul Bahrain Amir Hakim

March 18, 2024

15:33 2. Inhouse Task (Development & QA) Monitor_Task #13942: Digital Services Act Compliance with respect to European Union law
Sent email to Aznil and Asrul for the request on 18th March 2024 Bin Hamzah Muhammad Fadhly
15:32 2. Inhouse Task (Development & QA) Monitor_Task #13942 (Closed - End of life cycle): Digital Services Act Compliance with respect to...
Follow up with Aznil and Asrul to confirm on the compliance for Digital Services Act with respect to European Union L... Bin Hamzah Muhammad Fadhly

March 15, 2024

16:22 PROFESSIONAL SERVICES - QA Documentation #13940 (Pending Review): Test Script_CR24002 - BSNeBiz - Dormant Account
To create test script for CR24002 - BSNeBiz - Dormant Account
Assignee:
* Nurin Sabrina
* Nurin Nadia
Binti Marobi Athirah Umairah
16:19 PROFESSIONAL SERVICES - QA Documentation #13939 (Development / Work In Progress): Test Script_CR24003 - BSNeBiz - New API to...
To create test script for CR24003 - BSNeBiz - New API to OCMS Project Server.
Assignee to:
* Nuna
* Amir
Binti Marobi Athirah Umairah
15:34 2. Inhouse Task (Development & QA) Task #13874: BSN Post Production Issues (iOS)
Apologize for the late reply. The build for BSN pointing to SIT has been shared to Umairah Bin Hamzah Muhammad Fadhly
15:28 PROFESSIONAL SERVICES - QA Documentation #13938 (Pending Review): BRFD_CR24002 - BSNeBiz - Dormant Account
To create BRFD for Dormant Account enhancement
Request :
BSNeBiz : Account with status Dormant
• To display ba...
Nurul Athira Abdul Rahim
13:31 PROFESSIONAL SERVICES - QA Task #13864 (Work Completed-End life cycle): BSNeBiz_Performance Test - CR22003: Enhancement of B...
Sent to BSN on 15/03/24 Binti Marobi Athirah Umairah
13:30 PROFESSIONAL SERVICES - QA Task #13756 (Work Completed-End life cycle): BSNeBiz_Performance Test - CR: GST
Sent to BSN on 15/03/24 Binti Marobi Athirah Umairah
10:52 PROFESSIONAL SERVICES - QA Documentation #13934: BRFD_CR24003 - BSNeBiz - New API to OCMS Project Server
Update on BRFD Aziana Nurul

March 14, 2024

16:27 2. Inhouse Task (Development & QA) Task #13912 (Development / Work In Progress): To Update mobile RESTful
Salam Mizal,
For Device Manager not function issue not happening in SIT/UAT. However, i have tested using latest b...
Binti Marobi Athirah Umairah
16:12 2. Inhouse Task (Development & QA) Task #13874: BSN Post Production Issues (iOS)
Salam Fadhly and team,
Kindly help to build version for SIT BSN. Thanks
Binti Marobi Athirah Umairah
16:10 2. Inhouse Task (Development & QA) Task #13874 (Pending SIT Deployment): BSN Post Production Issues (iOS)
Binti Marobi Athirah Umairah
16:10 2. Inhouse Task (Development & QA) Task #13889 (Pending SIT Deployment): Device Manager not function.
no issue in SIT/UAT. Need update from restful Binti Marobi Athirah Umairah
16:09 2. Inhouse Task (Development & QA) Task #13889 (Internal Testing): Device Manager not function.
Binti Marobi Athirah Umairah
16:05 2. Inhouse Task (Development & QA) Task #13889 (Development / Work In Progress): Device Manager not function.
Binti Marobi Athirah Umairah
16:00 2. Inhouse Task (Development & QA) Task #13881 (Pending SIT Deployment): Service under maintenance (iOS)
Binti Marobi Athirah Umairah
14:34 2. Inhouse Task (Development & QA) Monitor_Task #13923: Connection Error (Failed load Data)
HUAWEI SIT v2.1.1 Build 16 - Penril APK link
https://penrilsb.sharepoint.com/:li:/s/MobileDeveloper/E9b5GT2U5d1Fl...
Hazwani Syarifah
11:47 PROFESSIONAL SERVICES - QA Documentation #13934 (Work Completed-End life cycle): BRFD_CR24003 - BSNeBiz - New API to OCMS Pr...
To create BRFD based for BSNeBiz - New API to OCMS Project Server.
*BSNeBiz - New API to OCMS Project Server*
* R...
Binti Marobi Athirah Umairah

March 13, 2024

16:15 2. Inhouse Task (Development & QA) Task #13454: [IOS] Sanity Testing - App Version Update.
- i editted the summary page
https://docs.google.com/spreadsheets/d/1ZXa_VU_TGHUH2PJg40ovH-TRTYWaImuU/edit?usp=shar...
Bin Mior Kamarul Bahrain Amir Hakim

March 12, 2024

13:49 2. Inhouse Task (Development & QA) Task #13454: [IOS] Sanity Testing - App Version Update.
https://docs.google.com/spreadsheets/d/1ZXa_VU_TGHUH2PJg40ovH-TRTYWaImuU/edit?usp=sharing&ouid=101824174427676015721&... Bin Mior Kamarul Bahrain Amir Hakim

March 11, 2024

21:41 2. Inhouse Task (Development & QA) Task #13454: [IOS] Sanity Testing - App Version Update.
- Maps branch is fucntioning. Will modify the branch ejen tomorrow
- All rentas related just got the credential. wil...
Bin Mior Kamarul Bahrain Amir Hakim
10:12 0. CDB_Change Request Change #13832 (Pending Review): [CR24001] : BSNeBiz - DuitNow QR Notification (Soundbox - Bazar R...
Completely deployed. Migration ID0080 Binti Marobi Athirah Umairah
10:07 0. CDB_Change Request Task #13836 (Work Completed-End life cycle): CR24001 - SOW04 - Generate QR data file/PDF
Binti Marobi Athirah Umairah
10:07 0. CDB_Change Request Task #13835 (Work Completed-End life cycle): CR24001 - SOW03 - Push Notification via SMS API
Binti Marobi Athirah Umairah
10:06 0. CDB_Change Request Task #13834 (Work Completed-End life cycle): CR24001 - SOW02 - Intergration of soundbox API - Te...
Binti Marobi Athirah Umairah
10:05 0. CDB_Change Request Task #13833 (Work Completed-End life cycle): CR24001 - SOW01 - New project of DuitNow notificatio...
Binti Marobi Athirah Umairah

March 08, 2024

18:04 2. Inhouse Task (Development & QA) Monitor_Task #13923: Connection Error (Failed load Data)
Here I attach a proof of connection error. Aziana Nurul
17:11 PROFESSIONAL SERVICES - QA Task #13767: BSN- Huawei sanity testing
Here I attach latest file.
https://penrilsb-my.sharepoint.com/:b:/g/personal/nurul_aziana_penril_net/EWaJTWlp2m5Pj...
Aziana Nurul

March 05, 2024

21:55 2. Inhouse Task (Development & QA) Monitor_Task #13923 (New - Begin Life Cycle): Connection Error (Failed load Data)
Huawei connection error problem. Aziana Nurul
17:51 2. Inhouse Task (Development & QA) Task #13881: Service under maintenance (iOS)
iOS has finished adding the required logic, page and flow for the task. Bin Hamzah Muhammad Fadhly
17:49 2. Inhouse Task (Development & QA) Task #13881 (Internal Testing): Service under maintenance (iOS)
Bin Hamzah Muhammad Fadhly
13:27 PROFESSIONAL SERVICES - QA Task #13899 (Pending Review): BSNeBiz_Performance Test - CR23007 : Enhancement of webservice for ...
- Performed performance test on Transaction History for BSNeBiz and BSNeBiz Mobile
- Attached below are Performance ...
Binti Azauddin Nurin Sabrina

March 04, 2024

13:49 2. Inhouse Task (Development & QA) Task #13454: [IOS] Sanity Testing - App Version Update.
- Maps has been test. the Maps not responsive.
- fav bill payment doesnt exist
- rentas related task cannot be done...
Bin Mior Kamarul Bahrain Amir Hakim
13:48 2. Inhouse Task (Development & QA) Task #13454: [IOS] Sanity Testing - App Version Update.
- Maps has been test. the Maps not responsive.
- fav bill payment doesnt exist
- rentas related task cannot be done...
Bin Mior Kamarul Bahrain Amir Hakim

March 01, 2024

18:45 2. Inhouse Task (Development & QA) Task #13454: [IOS] Sanity Testing - App Version Update.
- Maps has been test. the Maps not responsive.
- rentas related task cannot be done because no rentas option
- Jomp...
Bin Mior Kamarul Bahrain Amir Hakim
17:35 2. Inhouse Task (Development & QA) Monitor_Task #13918 (New - Begin Life Cycle): Huawei Compile Issue
Monitoring log for Huawei bugs Nurul Athira Abdul Rahim
15:24 0. CDB_Change Request Task #13869: CR23004_P2 - Mobile (Android)
APK link for Android UAT v2.1.2 Build 3 - Penril
https://penrilsb.sharepoint.com/:li:/s/MobileDeveloper/E96hekxMB...
Hazwani Syarifah
11:43 2. Inhouse Task (Development & QA) Task #13885 (Pending SIT Deployment): Device Manager not function
no issue in SIT UAT. only pre-prod and prod. Binti Marobi Athirah Umairah
11:36 2. Inhouse Task (Development & QA) Task #13885 (Internal Testing): Device Manager not function
Binti Marobi Athirah Umairah
11:04 2. Inhouse Task (Development & QA) Task #13882 (Pending SIT Deployment): GST field should not display if value = 0 at confirmation, ...
tested and passed Binti Marobi Athirah Umairah
11:03 2. Inhouse Task (Development & QA) Task #13882 (Internal Testing): GST field should not display if value = 0 at confirmation, result
Binti Marobi Athirah Umairah
11:01 2. Inhouse Task (Development & QA) Task #13879 (Pending SIT Deployment): Amount 0 but, GST display 0.2 at confirmation page
tested and passed Binti Marobi Athirah Umairah
10:59 2. Inhouse Task (Development & QA) Task #13879 (Internal Testing): Amount 0 but, GST display 0.2 at confirmation page
Binti Marobi Athirah Umairah
10:47 2. Inhouse Task (Development & QA) Task #13912 (Internal Testing): To Update mobile RESTful
Bin Rahmat Ahmad Amirizal
10:36 2. Inhouse Task (Development & QA) Task #13876 (Internal Testing): BSN Post Production Issues (Android)
Binti Marobi Athirah Umairah
10:36 2. Inhouse Task (Development & QA) Task #13874 (Internal Testing): BSN Post Production Issues (iOS)
Binti Marobi Athirah Umairah
10:35 2. Inhouse Task (Development & QA) Task #13878 (Pending SIT Deployment): Able to entered amount 0.0. No validation in Android
tested and passed Binti Marobi Athirah Umairah
10:33 2. Inhouse Task (Development & QA) Task #13878 (Internal Testing): Able to entered amount 0.0. No validation in Android
Binti Marobi Athirah Umairah
10:28 2. Inhouse Task (Development & QA) Task #13884 (Pending SIT Deployment): Wrong error message when add as favourite for existing fav ...
tested and passed Binti Marobi Athirah Umairah
10:27 2. Inhouse Task (Development & QA) Task #13884 (Internal Testing): Wrong error message when add as favourite for existing fav account.
Binti Marobi Athirah Umairah

February 29, 2024

18:20 2. Inhouse Task (Development & QA) Task #13454: [IOS] Sanity Testing - App Version Update.
bugs
- Maps has been test. the Maps not responsive.
- rentas related task cannot be done because no rentas option
Bin Mior Kamarul Bahrain Amir Hakim
18:14 2. Inhouse Task (Development & QA) Task #13881 (Development / Work In Progress): Service under maintenance (iOS)
To check apps crashed when server down. Binti Marobi Athirah Umairah
18:12 2. Inhouse Task (Development & QA) Task #13886 (Pending SIT Deployment): Able to entered amount 0.0. No validation in mobile
Tested and passed. Binti Marobi Athirah Umairah
18:08 2. Inhouse Task (Development & QA) Task #13888 (Pending SIT Deployment): Wrong error message when add as favourite for existing fav ...
Tested and pass. Binti Marobi Athirah Umairah
17:55 2. Inhouse Task (Development & QA) Task #13884: Wrong error message when add as favourite for existing fav account.
(SIT v2.1.2 Build 5(Penril))
https://penrilsb-my.sharepoint.com/:u:/g/personal/luqman_hakim_penril_net/EU5RMwcT5-1Pr...
Binti Marobi Athirah Umairah
17:13 2. Inhouse Task (Development & QA) Task #13884 (Development / Work In Progress): Wrong error message when add as favourite for exist...
Hi Jun Yang,
Restful have been updated by Amirizal. I have tested and there is no error message "Account already e...
Binti Marobi Athirah Umairah
13:55 2. Inhouse Task (Development & QA) Task #13910 (Work Completed-End life cycle): Bug in iOS for [SCP ID :##6950##] : si enquiry duitn...
Binti Marobi Athirah Umairah

February 28, 2024

14:17 2. Inhouse Task (Development & QA) Task #13910: Bug in iOS for [SCP ID :##6950##] : si enquiry duitnow bug
Penril SIT version 3.3.6 build 12
CHANGELOG:
SI enquiry for confirm and result
- change from Status to Authorizati...
Ahmad Auzaie Hilmi
12:16 2. Inhouse Task (Development & QA) Task #13454: [IOS] Sanity Testing - App Version Update.
Hi Amir, please help to perform sanity testing for BSNeBiz Mobile > IOS.
Refer checklist as a guideline.
Also, p...
Nurul Athira Abdul Rahim

February 27, 2024

18:33 PROFESSIONAL SERVICES - QA Documentation #13837: BRFD_CR24001 - BSNeBiz - DuitNow QR Notification (Soundbox - Bazar Ramadhan)
Completed and uploaded to alfresco :
[[https://hub.penril.net/share/page/site/bsn/document-details?nodeRef=worksp...
Nurul Athira Abdul Rahim
18:31 0. CDB_Change Request Change #13832 (User Acceptance Test): [CR24001] : BSNeBiz - DuitNow QR Notification (Soundbox - B...
Nurul Athira Abdul Rahim
18:29 0. CDB_Change Request Change #13809 (System Integration Test): [CR23005] : BSNeBiz Update Expired Password Flow and Ema...
Pending sit testing to cover MFA module for CA expired password Nurul Athira Abdul Rahim
18:28 BSN Corporate Digital Banking Task #12556 (Closed - End of life cycle): Pentest - 2nd Assessment [2021]
Closed for this and refer new 2023/2024 (year 3 assessment) pentest report Nurul Athira Abdul Rahim
18:27 BSN Corporate Digital Banking Task #12581 (Closed - End of life cycle): Pentest_CDB - Usable Previously Requested OTP [LOW]
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
18:26 BSN Corporate Digital Banking Task #12582 (Closed - End of life cycle): Pentest_CDB - OTP Does Not Expire [LOW]
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
18:26 BSN Corporate Digital Banking Task #12590 (Closed - End of life cycle): Pentest_CDB - Diffie-Hellman Group Smaller Than 2048 Bi...
Nurul Athira Abdul Rahim
18:26 BSN Corporate Digital Banking Task #12589 (Closed - End of life cycle): Pentest_CDB - [POTENTIAL] TLS/SSL Timing Side-Channel A...
Nurul Athira Abdul Rahim
18:25 BSN Corporate Digital Banking Task #12576 (Closed - End of life cycle): Pentest_CDB - Using Components with Known Vulnerabiliti...
Close for this and refer new pentest report year 23/24 Nurul Athira Abdul Rahim
18:22 0. CDB_Change Request Change #13729: [CR22003] : Enhancement on IBAM CDB Application and Organization Setup
Parent task #13699 Nurul Athira Abdul Rahim
18:19 0. CDB_Change Request Change #13729 (Closed - End of life cycle): [CR22003] : Enhancement on IBAM CDB Application and O...
Nurul Athira Abdul Rahim
18:07 0. CDB_Change Request Task #13737 (Work Completed-End life cycle): CR22003_SOW06 - New Application - To add checkbox in...
Tested and passed. Refer compiled test result upload in alfresco.
[[https://hub.penril.net/share/page/site/bsn/doc...
Nurul Athira Abdul Rahim
18:07 0. CDB_Change Request Task #13736 (Work Completed-End life cycle): CR22003_SOW05 - New Application – Email Content
Tested and passed. Refer compiled test result upload in alfresco.
[[https://hub.penril.net/share/page/site/bsn/doc...
Nurul Athira Abdul Rahim
17:57 0. CDB_Change Request Task #13735 (Work Completed-End life cycle): CR22003_SOW04 - New Application – Result screen
Tested and passed. Refer compiled test result upload in alfresco.
[[https://hub.penril.net/share/page/site/bsn/doc...
Nurul Athira Abdul Rahim
17:57 0. CDB_Change Request Task #13734 (Work Completed-End life cycle): CR22003_SOW03 - New Application – To rearrange servi...
Tested and passed. Refer compiled test result upload in alfresco.
[[https://hub.penril.net/share/page/site/bsn/doc...
Nurul Athira Abdul Rahim
17:56 0. CDB_Change Request Task #13733 (Work Completed-End life cycle): CR22003_SOW02 - New Application – To add account num...
Tested and passed. Refer compiled test result upload in alfresco.
[[https://hub.penril.net/share/page/site/bsn/doc...
Nurul Athira Abdul Rahim
17:55 0. CDB_Change Request Task #13732 (Work Completed-End life cycle): CR22003_SOW01 - To add Delete button at IBAM>CBE - B...
Tested and passed. Refer compiled test result upload in alfresco.
[[https://hub.penril.net/share/page/site/bsn/doc...
Nurul Athira Abdul Rahim
17:51 0. CDB_Change Request Change #13729 (System Integration Test): [CR22003] : Enhancement on IBAM CDB Application and Orga...
Deployed to prod on 22/01/24
Migration ID0078
Nurul Athira Abdul Rahim
17:47 BSN Corporate Digital Banking Task #12559 (Closed - End of life cycle): Pentest_IBAM - Username Enumeration [LOW]
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:47 BSN Corporate Digital Banking Task #12568 (Closed - End of life cycle): Pentest_IBAM - Insecure Direct Object Reference (IDOR) ...
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:47 BSN Corporate Digital Banking Task #12569 (Closed - End of life cycle): Pentest_IBAM - Reflected Cross-Site Scripting (XSS) [LOW]
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:46 BSN Corporate Digital Banking Task #12570 (Closed - End of life cycle): Pentest_IBAM - [POTENTIAL] TLS/SSL Timing Side-Channel ...
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:46 BSN Corporate Digital Banking Task #12571 (Closed - End of life cycle): Pentest_IBAM - Diffie-Hellman Group Smaller Than 2048 B...
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:45 BSN Corporate Digital Banking Task #12573 (Closed - End of life cycle): Pentest_IBAM - TLS/SSL Server Supports The Use of Stati...
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:45 BSN Corporate Digital Banking Task #12574 (Closed - End of life cycle): Pentest_IBAM - Arbitrary Host Header Accepted [INFO]
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:45 BSN Corporate Digital Banking Task #12577 (Closed - End of life cycle): Pentest_CDB - Insecure Direct Object Reference (IDOR) [...
Nurul Athira Abdul Rahim
17:44 BSN Corporate Digital Banking Task #12577: Pentest_CDB - Insecure Direct Object Reference (IDOR) [MED]
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:44 BSN Corporate Digital Banking Task #12579 (Closed - End of life cycle): Pentest_CDB - Username Enumeration [LOW]
Nurul Athira Abdul Rahim
17:44 BSN Corporate Digital Banking Task #12579 (Work Completed-End life cycle): Pentest_CDB - Username Enumeration [LOW]
Nurul Athira Abdul Rahim
17:44 BSN Corporate Digital Banking Task #12579: Pentest_CDB - Username Enumeration [LOW]
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:43 BSN Corporate Digital Banking Task #12588 (Closed - End of life cycle): Pentest_CDB - Missing HTTP "Strict-Transport-Security" ...
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:43 BSN Corporate Digital Banking Task #12587 (Closed - End of life cycle): Pentest_CDB - Missing "X-Frame-Options" Header [LOW]
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:43 BSN Corporate Digital Banking Task #12586 (Closed - End of life cycle): Pentest_CDB - Missing "X-Content-Type-Options" Header [...
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:42 BSN Corporate Digital Banking Task #12584 (Closed - End of life cycle): Pentest_CDB - Missing "Content-Security-Policy" Header ...
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:42 BSN Corporate Digital Banking Task #12589: Pentest_CDB - [POTENTIAL] TLS/SSL Timing Side-Channel Attacks, aka the "Lucky Thirte...
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:41 BSN Corporate Digital Banking Task #12590: Pentest_CDB - Diffie-Hellman Group Smaller Than 2048 Bits [LOW]
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:40 BSN Corporate Digital Banking Task #12592 (Closed - End of life cycle): Pentest_CDB - TLS/SSL Server Supports The Use of Static...
Closed for this and refer new 2023/2024 pentest reportClosed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:40 BSN Corporate Digital Banking Task #12593 (Closed - End of life cycle): Pentest_CDB - Arbitrary Host Header Accepted [INFO]
Closed for this and refer new 2023/2024 pentest report Nurul Athira Abdul Rahim
17:35 2. Inhouse Task (Development & QA) Task #13912 (Pending SIT Deployment): To Update mobile RESTful
# minor changes made to set correct response message in error handling, awaiting deployment. Bin Rahmat Ahmad Amirizal
17:35 1. CDB_Phase 2 & 3 Development Bug #13093 (Work Completed-End life cycle): [IOS] System display blank screen when approver appro...
Nurul Athira Abdul Rahim
17:34 1. CDB_Phase 2 & 3 Development Enhancement #12314 (Work Completed-End life cycle): UAT_DuitNow - To Update BSNeBIZ Exceptional R...
Nurul Athira Abdul Rahim
17:28 BSN Corporate Digital Banking Task #12591 (Closed - End of life cycle): Pentest_CDB - TLS/SSL Server Is Using Commonly Used Pri...
Closed, now refer latest pentest 2023 Nurul Athira Abdul Rahim
17:27 BSN Corporate Digital Banking Task #12572 (Closed - End of life cycle): Pentest_IBAM - TLS/SSL Server Is Using Commonly Used Pr...
Closed, now refer latest pentest 2023 Nurul Athira Abdul Rahim
17:26 1. CDB_Phase 2 & 3 Development Bug #12296 (Closed - End of life cycle): UAT Multiple Window - To allow select current date
Nurul Athira Abdul Rahim
16:44 PROFESSIONAL SERVICES - QA Documentation #13765 (Work Completed-End life cycle): Test Script_CR23004 - Enhancement of Corpor...
Binti Marobi Athirah Umairah
16:44 PROFESSIONAL SERVICES - QA Documentation #13765: Test Script_CR23004 - Enhancement of Corporate Administrator Module to add MFA
P2: [[https://hub.penril.net/share/s/y2zjkaruSvWiZDZpImdxFQ]] Binti Marobi Athirah Umairah
16:39 PROFESSIONAL SERVICES - QA Documentation #13661 (Work Completed-End life cycle): Test Script_CR23002 - BSNeBiz : Fraud Manag...
Binti Marobi Athirah Umairah
16:36 0. CDB_Change Request Change #13619 (System Integration Test): [CR23003] : BSNeBIZ Fraud Management System
Binti Marobi Athirah Umairah
15:41 2. Inhouse Task (Development & QA) Task #13881: Service under maintenance (iOS)
Error message for Unable to connect to server has been change/update. Aziana Nurul
15:33 2. Inhouse Task (Development & QA) Task #13881: Service under maintenance (iOS)
Tested and the issues have been fixed. No bugs found. Aziana Nurul
15:27 2. Inhouse Task (Development & QA) Task #13886 (Internal Testing): Able to entered amount 0.0. No validation in mobile
Bin Hamzah Muhammad Fadhly
15:19 2. Inhouse Task (Development & QA) Task #13888: Wrong error message when add as favourite for existing fav account.
Has been tested. Proper error message not appeared. Aziana Nurul
14:55 2. Inhouse Task (Development & QA) Task #13889: Device Manager not function.
Device manager function has been tested. no issues or bugs were found. Aziana Nurul
14:45 2. Inhouse Task (Development & QA) Task #13889: Device Manager not function.
RESTful updated by Amirizal. Task #13912 Binti Marobi Athirah Umairah
14:45 2. Inhouse Task (Development & QA) Task #13888: Wrong error message when add as favourite for existing fav account.
RESTful updated by Amirizal. Task #13912 Binti Marobi Athirah Umairah
14:20 2. Inhouse Task (Development & QA) Task #13912 (Internal Testing): To Update mobile RESTful
# Add error handling to catch constraint/duplicate user to add as favourite for existing fav account.
# Device listi...
Bin Rahmat Ahmad Amirizal
13:41 0. CDB_Change Request Change #13832: [CR24001] : BSNeBiz - DuitNow QR Notification (Soundbox - Bazar Ramadhan)
Update :
Completed BRFD and Test Script and send to Encik Rahmat
Completed testing for Interbank (User testing)...
Nurul Athira Abdul Rahim
13:37 0. CDB_Change Request Task #13834: CR24001 - SOW02 - Intergration of soundbox API - TechHunter
27/2/24 from Firas.
Updated for issue failed to receive notification when perform BSN to BSN
Referring to our...
Nurul Athira Abdul Rahim
13:28 2. Inhouse Task (Development & QA) Task #13912 (Development / Work In Progress): To Update mobile RESTful
Bin Rahmat Ahmad Amirizal
12:07 1. CDB_Phase 2 & 3 Development Task #13137 (Work Completed-End life cycle): GST - Development
Deployed on 2/2/2024. Migration ID0078 Binti Marobi Athirah Umairah
11:59 1. CDB_Phase 2 & 3 Development Task #13140 (Work Completed-End life cycle): GST - Mobile [Android]
Binti Marobi Athirah Umairah
11:58 1. CDB_Phase 2 & 3 Development Task #13141 (Work Completed-End life cycle): GST - Mobile (IOS)
Binti Marobi Athirah Umairah
11:58 1. CDB_Phase 2 & 3 Development Task #13825 (Work Completed-End life cycle): GST - Restful (Charges)
Binti Marobi Athirah Umairah
11:47 2. Inhouse Task (Development & QA) Task #13912 (Pending Prod Deployment): To Update mobile RESTful
To update restful for mobile:
* Wrong error message when add as favourite for existing fav account.
* Device Mana...
Binti Marobi Athirah Umairah
11:39 2. Inhouse Task (Development & QA) Task #13887 (Work Completed-End life cycle): New transfer but receipt display as fav (p2p)
Related to Task #13875 Binti Marobi Athirah Umairah
11:33 2. Inhouse Task (Development & QA) Task #13883 (Work Completed-End life cycle): New transfer but receipt display as fav (p2p)
Related to Task #13875 Binti Marobi Athirah Umairah
11:31 2. Inhouse Task (Development & QA) Task #13884 (Internal Testing): Wrong error message when add as favourite for existing fav account.
Binti Marobi Athirah Umairah
11:30 2. Inhouse Task (Development & QA) Task #13884 (Work Completed-End life cycle): Wrong error message when add as favourite for existi...
Binti Marobi Athirah Umairah
11:29 2. Inhouse Task (Development & QA) Task #13875 (Work Completed-End life cycle): BSN Post Production Issues (Web)
Binti Marobi Athirah Umairah

February 26, 2024

16:08 2. Inhouse Task (Development & QA) Task #13910 (Internal Testing): Bug in iOS for [SCP ID :##6950##] : si enquiry duitnow bug
Penril SIT version 3.3.6 build 8
CHANGELOG:
- fix for SCPID 6950 - SI enquiry status wrong
https://testflight.app...
Ahmad Auzaie Hilmi
13:26 2. Inhouse Task (Development & QA) Task #13910 (Development / Work In Progress): Bug in iOS for [SCP ID :##6950##] : si enquiry duit...
Finding: the current SI status is using @siBean::status@ instead of @transactionStatus@ Ahmad Auzaie Hilmi
13:24 2. Inhouse Task (Development & QA) Task #13910 (Work Completed-End life cycle): Bug in iOS for [SCP ID :##6950##] : si enquiry duitn...
To fix bug on iOS for verifier status. Correct status: Pending Verify. Binti Marobi Athirah Umairah
10:24 2. Inhouse Task (Development & QA) Task #13884 (Internal Testing): Wrong error message when add as favourite for existing fav account.
Pending restful, mobile no fix required. Tye Jun Yang
10:22 2. Inhouse Task (Development & QA) Task #13877 (Pending SIT Deployment): Service under maintenance
Added repeated calls for access token on failure to minimize UX disruption. Also updated error logout screen to be mo... Tye Jun Yang
10:03 0. CDB_Change Request Task #13628 (System Integration Test): CR23002_Fraud: SOW03.2.2 - Enhancement at BSNeBiz Mobile -...
Ahmad Auzaie Hilmi
10:02 0. CDB_Change Request Task #13627 (System Integration Test): CR23002_Fraud: SOW03.1.2 - Enhancement at BSNeBiz Mobile -...
Ahmad Auzaie Hilmi
10:01 0. CDB_Change Request Task #13626 (System Integration Test): CR23002_Fraud: SOW03.2.1 - Enhancement at BSNeBiz Mobile -...
Ahmad Auzaie Hilmi
10:01 0. CDB_Change Request Task #13625 (System Integration Test): CR23002_Fraud: SOW03.1.1 - Enhancement at BSNeBiz Mobile -...
Ahmad Auzaie Hilmi
10:01 0. CDB_Change Request Task #13622 (System Integration Test): CR23002_Fraud: SOW01 - BSNeBIZ Mobile Intergration (ANDROID))
Ahmad Auzaie Hilmi
10:00 0. CDB_Change Request Task #13621 (System Integration Test): CR23002_Fraud: SOW01 - BSNeBIZ Mobile Intergration IOS)
Ahmad Auzaie Hilmi

February 23, 2024

17:21 PROFESSIONAL SERVICES - QA Documentation #13783: BRFD_CR23005 - BSNeBiz Update Expired Password Flow and Email Content
-Add new module CA with expired password and without device pairing flow.
Aziana Nurul
16:16 PROFESSIONAL SERVICES - QA Documentation #13837 (Work Completed-End life cycle): BRFD_CR24001 - BSNeBiz - DuitNow QR Notific...
Nurul Athira Abdul Rahim
16:15 2. Inhouse Task (Development & QA) Task #13889 (Internal Testing): Device Manager not function.
Mobile has no fix. Only restful Bin Hamzah Muhammad Fadhly
16:14 2. Inhouse Task (Development & QA) Task #13888 (Internal Testing): Wrong error message when add as favourite for existing fav account.
Bin Hamzah Muhammad Fadhly
 

Also available in: Atom