- 17:19 5. Training Compilation Issue Task #10583: CDB_Device Pairing TAC
- pending for SMS server error
- 17:17 5. Training Compilation Issue Bug #10661 (Work Completed-End life cycle): CDB_CA Login_LWrong error message
- Tested and passed
- 17:13 5. Training Compilation Issue Bug #10663 (Development / Work In Progress): IBAM-Create New Organization-Government check
- Hi Najmi, the error message still appear at wrong position.
Kindly fix for both
-Workflow or not workflow
-gover...
February 28, 2020
- 10:22 5. Training Compilation Issue Task #10656 (Internal Testing): CDB_User Migration_Expired Password
- 10:22 5. Training Compilation Issue Bug #10661 (Internal Testing): CDB_CA Login_LWrong error message
- 10:22 5. Training Compilation Issue Bug #10663 (Internal Testing): IBAM-Create New Organization-Government check
- 10:22 5. Training Compilation Issue Task #10583 (Internal Testing): CDB_Device Pairing TAC
February 27, 2020
- 17:40 5. Training Compilation Issue Task #10583 (Pending SIT Deployment): CDB_Device Pairing TAC
- 17:39 5. Training Compilation Issue Bug #10663 (Pending SIT Deployment): IBAM-Create New Organization-Government check
- 17:38 5. Training Compilation Issue Bug #10661 (Pending SIT Deployment): CDB_CA Login_LWrong error message
- 13:14 Internal Testing - CDB Bug #9716 (Work Completed-End life cycle): UAT-Transaction (workflow) made on mobile did not disp...
- Tested and passed
- 12:50 Internal Testing - CDB Bug #9739 (Work Completed-End life cycle): CDB- To change Bneficiary Name to "Nickname"
- Tested and passed
- 12:46 Internal Testing - CDB Bug #9427 (Work Completed-End life cycle): CDB_Online Reg_checkbox
- Tested and passed
- 12:27 5. Training Compilation Issue Bug #10666 (Work Completed-End life cycle): CDB-Bulk Payment Transaction-Email
- Hi Najmi, kindly at selected Org Code to the email content.
Refer attachment. - 12:25 Internal Testing - CDB Bug #9720 (Work Completed-End life cycle): UAT_Email - To amend the email content
- Tested and passed
- 11:54 Internal Testing - CDB Bug #10523 (Development / Work In Progress): CDB - Transaction History
- Hi Najmi,
The pagination still not available.
Refer my attachment.
February 26, 2020
- 18:24 1. CDB_Phase 2 & 3 Development Task #10362 (Development / Work In Progress): [P1_Extended] : IBAM - Email Notification for checker
- Tested and passed for
BBE
-User Admin
-Group Admin
-Navigation (IBAM)
-Content
-Message Box
CBE
-New Appli... - 15:10 5. Training Compilation Issue Bug #10663 (Work Completed-End life cycle): IBAM-Create New Organization-Government check
- To add error message at Government - Non Government field
Currently : Error message located at wrong postion
Re... - 10:54 Internal Testing - CDB Bug #9845 (Work Completed-End life cycle): System not display beneficiary ID at Verier/Approver
- tested and passed.
- 10:42 Internal Testing - CDB Bug #10647 (Work Completed-End life cycle): CDB_Interbank Transfer_Beneficiary Type and ID
- Tested and passed.
February 25, 2020
- 18:15 5. Training Compilation Issue Bug #10648 (Development / Work In Progress): CDB_SI Transaction_Stop SI_Verify-Approver
- Hi Najmi, the error still available.
Kindly check.
Thanks - 15:24 5. Training Compilation Issue Bug #10655 (Development / Work In Progress): CDB_Bulk Payment_IBG
- Tested and passed for reported bug.
Please remove the unknown characters that appears at error message.
Refer m... - 15:18 Internal Testing - CDB Bug #9553 (Work Completed-End life cycle): Email Notification - Auto Debit_Contact Person did not...
- Tested and passed.
- 11:59 5. Training Compilation Issue Bug #10661 (Work Completed-End life cycle): CDB_CA Login_LWrong error message
- Wrong error message at username
Steps:
1. CA login
2. Create new user
3. Use existing username
4. Click "cre...
February 24, 2020
- 15:34 5. Training Compilation Issue Task #10656 (Pending SIT Deployment): CDB_User Migration_Expired Password
- 15:00 5. Training Compilation Issue Task #10656 (Development / Work In Progress): CDB_User Migration_Expired Password
- 10:58 5. Training Compilation Issue Bug #10413 (Work Completed-End life cycle): CDB-Migrated User Login Flow
- 10:12 5. Training Compilation Issue Task #10656 (Work Completed-End life cycle): CDB_User Migration_Expired Password
- To handle migrated user with expired password
Currently : Migrated user with expired password cannot do self forgo... - 10:11 5. Training Compilation Issue Bug #10655 (Internal Testing): CDB_Bulk Payment_IBG
- Issue:
User enter alphanumeric for Customer Account when expected data is numeric.
Cause:
Column data type for C...
February 21, 2020
- 18:21 5. Training Compilation Issue Bug #10648 (Internal Testing): CDB_SI Transaction_Stop SI_Verify-Approver
- 18:21 Internal Testing - CDB Bug #10647 (Internal Testing): CDB_Interbank Transfer_Beneficiary Type and ID
- 18:21 Internal Testing - CDB Bug #9845 (Internal Testing): System not display beneficiary ID at Verier/Approver
- 18:20 5. Training Compilation Issue Bug #10638 (User Acceptance Test): UAT_IBAM_Admin User Manager_Access
- UAT deployed
- 18:20 5. Training Compilation Issue Task #10631 (User Acceptance Test): BSNeBIZ web - RSA Encryption
- UAT deployed
- 16:25 5. Training Compilation Issue Bug #10655 (Development / Work In Progress): CDB_Bulk Payment_IBG
- 16:20 5. Training Compilation Issue Bug #10655 (Work Completed-End life cycle): CDB_Bulk Payment_IBG
- 1. System accept special characters and characters into account no field
Expected : Only numeric
2. Cannot proc...
February 20, 2020
- 14:36 0. CDB_Change Request Enhancement #10112 (System Integration Test): [CR19001] : To add "Collection Receivable" function...
- Tested and passed.
Will pass to SIT for testing - 12:19 0. CDB_Change Request Enhancement #10112 (Development / Work In Progress): [CR19001] : To add "Collection Receivable" f...
- Hi Najmi,
The data type is fixed.
I try to download the report but the downloaded txt file is empty.
Refer... - 11:08 Internal Testing - CDB Bug #9845 (Pending SIT Deployment): System not display beneficiary ID at Verier/Approver
- 10:00 Internal Testing - CDB Bug #10647 (Pending SIT Deployment): CDB_Interbank Transfer_Beneficiary Type and ID
- 09:58 5. Training Compilation Issue Bug #10648 (Pending SIT Deployment): CDB_SI Transaction_Stop SI_Verify-Approver
- 09:07 5. Training Compilation Issue Bug #10648 (Development / Work In Progress): CDB_SI Transaction_Stop SI_Verify-Approver
February 19, 2020
- 17:59 5. Training Compilation Issue Bug #10638 (Pending UAT Deployment): UAT_IBAM_Admin User Manager_Access
- Tested and passed.
- 16:17 5. Training Compilation Issue Bug #10648 (Internal Testing): CDB_SI Transaction_Stop SI_Verify-Approver
- System cannot reject and approve the Stop SI request
Refer attachment - 16:13 Internal Testing - CDB Bug #10647 (Development / Work In Progress): CDB_Interbank Transfer_Beneficiary Type and ID
- 15:59 Internal Testing - CDB Bug #10647 (Work Completed-End life cycle): CDB_Interbank Transfer_Beneficiary Type and ID
- System not saving the inserted data
1. Do New Interbank Transfer
2. Checked beneficiary ID
3. Select and insert ... - 15:52 Internal Testing - CDB Bug #9845 (Development / Work In Progress): System not display beneficiary ID at Verier/Approver
- Hi Najmi,
Transaction : Other bank transfer
The Beneficiary Type not display at verifier and approver screen ... - 14:50 Internal Testing - CDB Bug #9813 (Work Completed-End life cycle): Verifier- Wrong SI title
- tested and passed
- 13:40 0. CDB_Change Request Enhancement #10112 (Internal Testing): [CR19001] : To add "Collection Receivable" function to ser...
- *
- 13:40 5. Training Compilation Issue Bug #10638 (Internal Testing): UAT_IBAM_Admin User Manager_Access
- 10:17 Internal Testing - IBAM Bug #9762 (Work Completed-End life cycle): UAT_System display wrong service type
February 18, 2020
- 15:56 5. Training Compilation Issue Bug #10639 (Work Completed-End life cycle): UAT_IBAM_Admin User Manager_Change Name
- Tested and passed.
- 14:03 Internal Testing - CDB Bug #9788 (Work Completed-End life cycle): IOS _Interface amended.
- 12:46 5. Training Compilation Issue Task #10631 (Pending UAT Deployment): BSNeBIZ web - RSA Encryption
- Tested and passed
-Main login
-Device pairing
-Activate Token - 12:05 5. Training Compilation Issue Task #10583 (Development / Work In Progress): CDB_Device Pairing TAC
- The new TAC process has been developed.
Kind add some extra feature to the TAC process
1. To add successful sen...
February 13, 2020
- 18:04 5. Training Compilation Issue Task #10631 (Internal Testing): BSNeBIZ web - RSA Encryption
- 18:04 5. Training Compilation Issue Task #10583 (Internal Testing): CDB_Device Pairing TAC
- 16:02 5. Training Compilation Issue Task #10631 (Pending SIT Deployment): BSNeBIZ web - RSA Encryption
- 16:02 5. Training Compilation Issue Task #10583 (Pending SIT Deployment): CDB_Device Pairing TAC
- 16:02 5. Training Compilation Issue Bug #10638 (Pending SIT Deployment): UAT_IBAM_Admin User Manager_Access
- 14:47 5. Training Compilation Issue Bug #10639 (Internal Testing): UAT_IBAM_Admin User Manager_Change Name
February 12, 2020
- 18:26 5. Training Compilation Issue Bug #10639 (Work Completed-End life cycle): UAT_IBAM_Admin User Manager_Change Name
- Path : IBAM > Admin User Manager > Create (Org Setup > User Maintenance)
To change name :
Suspend to Block
... - 18:10 5. Training Compilation Issue Bug #10638 (Work Completed-End life cycle): UAT_IBAM_Admin User Manager_Access
- Path : IBAM > Admin User Manager > Create (Org Setup)
Hi Najmi,
Why there is edit function under Organization S... - 11:19 Internal Testing - IBAM Bug #9924 (Work Completed-End life cycle): IBAM Password Policy - Fields in Maker and Checker pag...
- Tested and passed.
Sorry for the confusing. - 11:16 Internal Testing - IBAM Bug #9924 (Internal Testing): IBAM Password Policy - Fields in Maker and Checker pages are not sy...
- Please retest.
- 11:08 5. Training Compilation Issue Bug #10515 (Work Completed-End life cycle): IOS BSNeBIZ - GUI
- Tested and passed for all issues.
- 11:06 Internal Testing - IBAM Bug #9924 (Development / Work In Progress): IBAM Password Policy - Fields in Maker and Checker pa...
- Hi Najmi,
Tested and failed.
Issue still persist, kindly check.
Thanks - 10:28 5. Training Compilation Issue Bug #10622 (Work Completed-End life cycle): IBAM > Admin User Manager
- Tested and passed for :
-change suspend to block
-remove "edit password admin module user"
February 11, 2020
- 18:14 5. Training Compilation Issue Bug #10622 (Internal Testing): IBAM > Admin User Manager
- 18:14 Internal Testing - IBAM Bug #9924 (Internal Testing): IBAM Password Policy - Fields in Maker and Checker pages are not sy...
- 18:13 5. Training Compilation Issue Task #10583 (Internal Testing): CDB_Device Pairing TAC
- 18:13 5. Training Compilation Issue Task #10631 (Internal Testing): BSNeBIZ web - RSA Encryption
- 16:46 5. Training Compilation Issue Bug #10385 (Work Completed-End life cycle): IBAM - Domain user lock / unlock
- tested and passed
- 16:25 Internal Testing - IBAM Bug #9530 (Pending Review): Message Box - System display pending approval (archive)
- Issue:
Pending Message Box is in Authorization BBE. Has problem when admin has access to Message Box but no access t... - 16:21 5. Training Compilation Issue Task #10631 (Pending SIT Deployment): BSNeBIZ web - RSA Encryption
- 15:54 5. Training Compilation Issue Bug #10624: IBAM_Pre-Prod-Access Matrix
- Hi Najmi,
Kindly check on below issue
Path : Admin user manager > user access (select all access to view the ... - 15:46 5. Training Compilation Issue Bug #10505 (Work Completed-End life cycle): Android - GUI
- Tested and passed.
Thanks Darren and Bram. - 11:46 5. Training Compilation Issue Bug #10634 (New - Begin Life Cycle): Android_Own Account Transfer_Authorization
- Path : Authorization (Approver) > Own Account Transaction
Issue :
- Missing Transaction Details
- System not... - 11:42 5. Training Compilation Issue Bug #10507 (Work Completed-End life cycle): Mobile (Android) - Jompay
- Thank you.
Tested and passed - 11:41 5. Training Compilation Issue Bug #10529 (Development / Work In Progress): Android - Approver List
- Hi Darren,
The issue still persist, kindly check and fix.
Thank you - 11:33 5. Training Compilation Issue Bug #10579: Android_Authorization_Result Page listing
- Hi Darren,
Please amend the field name at authorization screen
Transaction : 3rd Party Transaction
- Fees ch... - 09:12 5. Training Compilation Issue Task #10583 (Pending SIT Deployment): CDB_Device Pairing TAC
- 09:12 5. Training Compilation Issue Task #10631 (Development / Work In Progress): BSNeBIZ web - RSA Encryption
- 09:10 5. Training Compilation Issue Bug #10624: IBAM_Pre-Prod-Access Matrix
- Hi Athira,
Please get the latest admin access matrix from Farid and updated according to IBAM.
February 10, 2020
- 16:23 Internal Testing - CDB Bug #9849 (Work Completed-End life cycle): Wrong pointing at side navigation CDB
- Tested and passed.
- 15:22 5. Training Compilation Issue Task #10631 (Closed - End of life cycle): BSNeBIZ web - RSA Encryption
- To add encryption to BSNeBiz web
- 12:41 1. CDB_Phase 2 & 3 Development Enhancement #10630 (Dropped-End of life cycle): IBAM_BSNeBiz_Mobile Manager
- *To add Mobile Manager function to IBAM and BSNeBiz*
*IBAM*
Path : IBAM > CBE > Organization Setup > Company
... - 12:33 5. Training Compilation Issue Task #10583 (Development / Work In Progress): CDB_Device Pairing TAC
- 12:28 Internal Testing - IBAM Enhancement #9755 (Work Completed-End life cycle): IBAM-File Upload
- Tested and passed.
- 12:27 1. CDB_Phase 2 & 3 Development Task #9803 (Internal Testing): [P1_Extended] : To develop BOLT module which allow CDB User to do ...
- Hi Athira,
Please find the latest fixed application install in email and try to test again for *below* issue.
I...
February 07, 2020
- 17:18 Internal Testing - CDB Enhancement #10213 (Work Completed-End life cycle): SIT_C027 - IBAM - Extend service time until 8...
- Tested and passed.
- 16:54 1. CDB_Phase 2 & 3 Development Task #9803 (Development / Work In Progress): [P1_Extended] : To develop BOLT module which allow C...
- Hi Chee Onn, just testing the updated system, below is my finding :
*Bugs :*
Bulk Payment 800
-1. Fix le... - 11:49 Internal Testing - IBAM Bug #10608 (Work Completed-End life cycle): IBAM - Side Navigation
- Tested and passed
- 11:49 Internal Testing - IBAM Bug #10609 (Work Completed-End life cycle): IBAM_Message Box_Not refresh User listing
- Tested and passed for both issue.
- 11:49 5. Training Compilation Issue Bug #10617 (Work Completed-End life cycle): IBAM_Error 500 screen
- Tested and passed
- 11:49 5. Training Compilation Issue Bug #10564 (Work Completed-End life cycle): CDB_Bulk Payment_Main note
- Tested and passed for all modules.
- 11:49 Internal Testing - CDB Bug #10610 (Work Completed-End life cycle): CDB-Message Box-Clear "New" sign at trash folder
- Tested and passed.
- 11:07 5. Training Compilation Issue Bug #10624 (Development / Work In Progress): IBAM_Pre-Prod-Access Matrix
- 08:58 Internal Testing - IBAM Bug #9924 (Pending SIT Deployment): IBAM Password Policy - Fields in Maker and Checker pages are ...
February 06, 2020
- 17:47 5. Training Compilation Issue Bug #10619 (Work Completed-End life cycle): CDB_Jompay_Filter Special Character
- Tested and passed
- 17:13 Internal Testing - CDB Bug #9812 (Work Completed-End life cycle): Verifier-Wrong highlight tab
- Tested and passed
- 17:05 Internal Testing - CDB Bug #9430 (Work Completed-End life cycle): CDB-Payment_Mobile,Upass
- Tested and passed
- 17:04 Internal Testing - CDB Bug #9678 (Work Completed-End life cycle): Transfer & Payment-Wrong error message
- Tested and passed
- 17:02 Internal Testing - IBAM Bug #9924: IBAM Password Policy - Fields in Maker and Checker pages are not synchronized
- Updated issue..
Path : Password Policy
1. Maker update field at Password Policy module
2. Checker reject the r... - 15:39 1. CDB_Phase 2 & 3 Development Task #9803 (Internal Testing): [P1_Extended] : To develop BOLT module which allow CDB User to do ...
- Hi Athira,
All the bug and task had been done, please find email for the new application installer.
Thank you - 15:27 Internal Testing - CDB Bug #9788: IOS _Interface amended.
- Tested and passed
- 15:26 5. Training Compilation Issue Bug #10622 (Pending SIT Deployment): IBAM > Admin User Manager
- 15:03 Internal Testing - CDB Task #9897 (Work Completed-End life cycle): To add Security Statement | Client Charter | Privacy ...
- 14:45 5. Training Compilation Issue Bug #10624 (Closed - End of life cycle): IBAM_Pre-Prod-Access Matrix
- Salam Najmi,
Reported from Farid (Security), there is some module missing in pre-prod environment.
Refer attac... - 13:43 5. Training Compilation Issue Bug #10622 (Development / Work In Progress): IBAM > Admin User Manager
- Delete from ADMIN_ACTION,ADMIN_NAVIGATION_ACTION and ADMIN_PERMISSION
- 10:27 5. Training Compilation Issue Bug #10528: IOS - Approver List
- Hi Adit,
Please prepare for UAT version. - 10:27 5. Training Compilation Issue Task #10578: IOS_Add Tnc to Jompay screen
- Hi Adit,
Please prepare for UAT version. - 10:25 Internal Testing - CDB Bug #9891 (Work Completed-End life cycle): Mobile IIOS - System display wrong error message
- Tested and passed for both issue.
Erro message updated for GMT issue
"Service is currently unavailable"
*Sh... - 10:10 5. Training Compilation Issue Task #10577: Add Tnc to Jompay screen
- Error message position has been fixed at SIT environment and waiting deployment for UAT.
- 10:09 5. Training Compilation Issue Task #10577 (Work Completed-End life cycle): Add Tnc to Jompay screen
- tested and passed for
New JomPAY
FAv Jompay
- 09:30 5. Training Compilation Issue Bug #10617 (Internal Testing): IBAM_Error 500 screen
- 09:28 Internal Testing - IBAM Bug #10609 (Internal Testing): IBAM_Message Box_Not refresh User listing
- 09:27 5. Training Compilation Issue Bug #10566 (Work Completed-End life cycle): IOS and Android - Failed to login on mobile (Approver)
- Tested and passed.
- 09:27 1. CDB_Phase 2 & 3 Development Task #10158: [P1_Extended] : RFP Sect 1.2.3 - To develop RENTAS (Real Time)
- Noted
- 09:27 Internal Testing - CDB Bug #10610 (Internal Testing): CDB-Message Box-Clear "New" sign at trash folder
- 09:26 Internal Testing - IBAM Bug #10608 (Internal Testing): IBAM - Side Navigation
- 09:26 5. Training Compilation Issue Bug #10619 (Internal Testing): CDB_Jompay_Filter Special Character
February 05, 2020
- 17:45 1. CDB_Phase 2 & 3 Development Task #10158: [P1_Extended] : RFP Sect 1.2.3 - To develop RENTAS (Real Time)
- Hi Najmi,
Please refer to attached screenshot for the RENTAS project branch and help to deploy into SIT environmen... - 17:37 1. CDB_Phase 2 & 3 Development Task #10158: [P1_Extended] : RFP Sect 1.2.3 - To develop RENTAS (Real Time)
- Please find attached Rentas transaction for both initial and reversal. (WSDL and format layout)
Both has been deploy... - 17:27 1. CDB_Phase 2 & 3 Development Task #10158: [P1_Extended] : RFP Sect 1.2.3 - To develop RENTAS (Real Time)
- Chee Ping,
Please update on the progress of this module.
Final requirement as per link [[https://hub.penril.net/s... - 16:47 5. Training Compilation Issue Bug #10620 (Work Completed-End life cycle): CDB_Generate PIN_Mobile Number
- Tested and passed.
- 16:28 5. Training Compilation Issue Bug #10619 (Pending SIT Deployment): CDB_Jompay_Filter Special Character
- 16:28 Internal Testing - IBAM Bug #10608 (Pending SIT Deployment): IBAM - Side Navigation
- 16:27 Internal Testing - CDB Bug #10610 (Pending SIT Deployment): CDB-Message Box-Clear "New" sign at trash folder
- 16:27 Internal Testing - IBAM Bug #10609 (Pending SIT Deployment): IBAM_Message Box_Not refresh User listing
- 16:27 5. Training Compilation Issue Task #10578 (Pending UAT Deployment): IOS_Add Tnc to Jompay screen
- 16:26 1. CDB_Phase 2 & 3 Development Task #9803 (Development / Work In Progress): [P1_Extended] : To develop BOLT module which allow C...
- I found another bugs and got some error message to add to the system.
*Bugs :*
*Bulk Payment 800*
1. Fix len... - 16:26 5. Training Compilation Issue Task #10578 (Pending SIT Deployment): IOS_Add Tnc to Jompay screen
- 16:26 5. Training Compilation Issue Bug #10617 (Pending SIT Deployment): IBAM_Error 500 screen
- 16:24 5. Training Compilation Issue Bug #10566 (Internal Testing): IOS and Android - Failed to login on mobile (Approver)
- Restful SIT and UAT updated. Please retest.
- 16:14 1. CDB_Phase 2 & 3 Development Task #9803: [P1_Extended] : To develop BOLT module which allow CDB User to do Batch Data Entry af...
- Please refer below and use the latest installer to test.
-1. Bulk Payment - 700-
- Entered symbol to Old IC Numbe... - 09:30 Internal Testing - IBAM Bug #10609 (Development / Work In Progress): IBAM_Message Box_Not refresh User listing
February 04, 2020
- 17:53 Internal Testing - CDB Bug #10610 (Development / Work In Progress): CDB-Message Box-Clear "New" sign at trash folder
- 16:30 5. Training Compilation Issue Task #10577 (Internal Testing): Add Tnc to Jompay screen
- 16:28 5. Training Compilation Issue Task #10577 (Development / Work In Progress): Add Tnc to Jompay screen
- 15:27 Internal Testing - IBAM Bug #10608 (Development / Work In Progress): IBAM - Side Navigation
- 15:26 5. Training Compilation Issue Bug #10620 (Internal Testing): CDB_Generate PIN_Mobile Number
- 15:20 5. Training Compilation Issue Bug #10385 (Internal Testing): IBAM - Domain user lock / unlock
- After discussion, flow should be:
# If AD user is lock, IBAM also lock
# After AD user is unlock, need to unlock ... - 14:39 5. Training Compilation Issue Bug #10281 (Work Completed-End life cycle): CDB-Estatement_Spacing
- Tested and passed.
Tested and passed - SIT side
- 14:19 5. Training Compilation Issue Bug #10622 (Work Completed-End life cycle): IBAM > Admin User Manager
- Hi Najmi,
Please remove Admin User Manager > Reset Password function on IBAM. - 14:10 1. CDB_Phase 2 & 3 Development Task #10203 (Work Completed-End life cycle): [P2_RFP] : CDB - Landing Page and Customer Info
- Tested and passed on web and mobile (android and ios)
- 14:08 5. Training Compilation Issue Bug #10576 (Work Completed-End life cycle): IOS - Time Counter at Transaction Signing
- Tested and passes.
No validation error appears since last fix. - 14:06 5. Training Compilation Issue Bug #10460 (Pending Review): Mobile IOS - Application Name
February 03, 2020
- 15:59 5. Training Compilation Issue Bug #10617 (Development / Work In Progress): IBAM_Error 500 screen
- 14:46 5. Training Compilation Issue Bug #10620 (Development / Work In Progress): CDB_Generate PIN_Mobile Number
- 14:46 5. Training Compilation Issue Bug #10619 (Development / Work In Progress): CDB_Jompay_Filter Special Character
- 12:16 5. Training Compilation Issue Bug #10620 (Work Completed-End life cycle): CDB_Generate PIN_Mobile Number
- CDB > Generate Pin > SMS (Mobile)
To add validation at Mobile Number field
Currently : System accept whatever n... - 09:44 5. Training Compilation Issue Bug #10619 (Work Completed-End life cycle): CDB_Jompay_Filter Special Character
- To filter special character to ICBS
Hi Najmi, Kindly update Company Name filter at JOMPAY
Currently : System th...