Activity

From March 01, 2016 to March 30, 2016

March 30, 2016

18:24 Enhancement #6047 (Pending Customer Feedback): [UAT1&2 - UAT_105] - Report Planning >> Summary Of...
Jasper Report limitation so Initiative budget cannot display in dynamic method in end of report.
New r_specialProgr...
Tan Jeng Wei
17:47 Enhancement #5866 (Internal Testing): [UAT1&2 - UAT_098] - Planning >> Planning Report >> Overall...
Hi Ayu,
I test ok with Enhancement Branch. Please ask for futher detail regarding this. Thanks a lot
Tan Jeng Wei
17:47 Enhancement #5934 (Pending Review): Local Trade Fair > top 5/10 product and service by hall
test result attached Lim Leonard
16:40 Enhancement #5934: Local Trade Fair > top 5/10 product and service by hall
HI Leo,
Kindly assist.
Siti Norahayu Mohd Desa
16:35 Enhancement #5866 (Development / Work In Progress): [UAT1&2 - UAT_098] - Planning >> Planning Rep...
Hi Jeng Wei,
Programme Type & Budget Type value display "null". Please assist.
Siti Norahayu Mohd Desa
16:17 Change #5867 (User Acceptance Test): [UAT1&2 - UAT_097] - Planning >> Planning Report >> Overall ...
Issue have been tested by Aishah. For data issue please refer Redmine #6047 Siti Norahayu Mohd Desa
16:10 Enhancement #5452: [UAT1&2 - UAT_115] - Report >> Generate Word Report
Hi Najmi,
Kindly assist to fix on the below issues:-
+Planning Report> Summary of Work Programme+
1. Column...
Siti Norahayu Mohd Desa
16:05 Enhancement #6047 (Development / Work In Progress): [UAT1&2 - UAT_105] - Report Planning >> Summa...
3. a)To add tittle Summary By Budget Type– Test on 25032016 fixed but do not bold the tittle
c) Initiative b...
Siti Norahayu Mohd Desa
15:59 Enhancement #5449 (Development / Work In Progress): [UAT1&2 - UAT_088] - Search Filter >> Date Range
New Request :

TPMS will display detail search based on fixed starting year 2002 for Planning and Planning JPPPA. ...
Siti Norahayu Mohd Desa

March 29, 2016

17:50 Enhancement #5453 (Development / Work In Progress): [UAT1&2 - UAT_048 & 049] - Planning & Plannin...
From: rizal@matrade.gov.my
Mar 18 (11 days ago)

# When click or roll-over at the event name, it should pop-up th...
Norhaidah Md Dasuki

March 28, 2016

13:46 Enhancement #5724: [UAT3-9 - UAT_017] - Dashboard > JPPPA
for the map still cant download with legend, found bug have discuss with amchart staff havent solve the issue.
Enh...
Aditya Prathama
13:46 Enhancement #5870: [UAT3-9 - UAT_151] - Dashboard
for the map still cant download with legend, found bug have discuss with amchart staff havent solve the issue.
Enh...
Aditya Prathama
13:45 Enhancement #5742: [UAT3-9 - UAT_017 & UAT_018] - Dashboard > JPPPA
for the map still cant download with legend, found bug have discuss with amchart staff havent solve the issue.
Enh...
Aditya Prathama

March 25, 2016

Avatar?id=1966&size=24 18:17 Enhancement #5934 (Internal Testing): Local Trade Fair > top 5/10 product and service by hall
Hi Ayu,
Fixes already done by jengwei on yesterday and deployed to UAT environment. Please try again.
Thank you.
Ngoh Chee Onn
11:14 Change #5867: [UAT1&2 - UAT_097] - Planning >> Planning Report >> Overall Summary >> Summary of W...
added information from Kak Aisah
Lim Leonard
11:14 Enhancement #5452: [UAT1&2 - UAT_115] - Report >> Generate Word Report
added information from Kak Aisah
Lim Leonard
11:14 Enhancement #6047: [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Programme
added information from Kak Aisah
Lim Leonard

March 23, 2016

17:02 Enhancement #5848: [UAT3-9 - UAT_157] - Post Event > Programmes > Feedback > List by Company
Issue have been changed from CR to Enhancement on 19/2/2016
Siti Norahayu Mohd Desa
13:10 Enhancement #5849 (Pending Review): [UAT3-9 - UAT_159] - Post Event > Event Report > Local Trade ...
test result attached Lim Leonard
12:11 Enhancement #5452 (Development / Work In Progress): [UAT1&2 - UAT_115] - Report >> Generate Word ...
Hi Najmi,
i found issue for 2 report
1. Budget Report > JPKA-Activity yang telah dijalankan
- did not down...
Lim Leonard

March 22, 2016

17:48 Enhancement #5837 (Closed - End of life cycle): [UAT3-9 - UAT_158] - Post Event > Programmes > Fe...
this issue has been log as Production issue due to urgency. Refer Support #6082 (TPMS_Prod094),
notes: As agreed i...
Norhaidah Md Dasuki
17:42 Change #5874 (Dropped-End of life cycle): [UAT3-9 - UAT_162] - Post Event > Programmes > Feedback...
Dropped based on discussion on 21/3/2016 Norhaidah Md Dasuki
16:41 Enhancement #5849 (Internal Testing): [UAT3-9 - UAT_159] - Post Event > Event Report > Local Trad...
Leo, please retest and verify. Norhaidah Md Dasuki
16:33 Enhancement #5934 (Development / Work In Progress): Local Trade Fair > top 5/10 product and servi...
Hi Jeng Wei,
Please assist on this issue
Thanks
Lim Leonard
16:05 Enhancement #5934 (Internal Testing): Local Trade Fair > top 5/10 product and service by hall
Leo,
Please re-check on the subtitle for Top 5/10 Product/Service by Hall. It shall be (Hall A) not only (A). Kindly...
Norhaidah Md Dasuki
15:10 Enhancement #5452: [UAT1&2 - UAT_115] - Report >> Generate Word Report
Hi Leo,
Kindly assist to test using http://172.25.96.136/matrade-tpms
The issue need to completed by today.
Siti Norahayu Mohd Desa
14:27 Enhancement #6047: [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Programme
Hi ayu,

I was already retrieve all the coding from production. Please retest after deployed around 5pm. Th...
Tan Jeng Wei
14:01 Enhancement #5866 (Internal Testing): [UAT1&2 - UAT_098] - Planning >> Planning Report >> Overall...
Hi Ayu,
The data alignment which is not solve yet. This one u have to futher discuss with najimi again, becaus...
Tan Jeng Wei
Avatar?id=1966&size=24 11:24 Enhancement #5449 (Internal Testing): [UAT1&2 - UAT_088] - Search Filter >> Date Range
Hi Ayu,
Search filter change according to user request, please test on SIT enhancement environment as URL below.
...
Ngoh Chee Onn
09:59 Enhancement #5449: [UAT1&2 - UAT_088] - Search Filter >> Date Range
Hi Chee Onn,
Kindly assist.
TPMS will display detail search based below:
For Planning starting year 2002
Fo...
Siti Norahayu Mohd Desa
Avatar?id=1966&size=24 09:33 Enhancement #5866 (Development / Work In Progress): [UAT1&2 - UAT_098] - Planning >> Planning Rep...
Hi Jeng Wei,
Please help to add excel template and add total budget request and total budget approved inside templ...
Ngoh Chee Onn

March 21, 2016

18:54 Enhancement #6047 (Internal Testing): [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Pro...
Hi ayu,
by adding the budget type into existing report. Please retest after deployed. Thanks a lot.
Tan Jeng Wei
18:37 Change #5874: [UAT3-9 - UAT_162] - Post Event > Programmes > Feedback > List by Company
Issue have been dropped in Discussion on CR and Conditional Sign-Off Issue List [Continuation] meeting dated 21/03/2016. Siti Norahayu Mohd Desa
16:28 Enhancement #5866: [UAT1&2 - UAT_098] - Planning >> Planning Report >> Overall Summary >> Details...
Hi chee on ,
Please help look into this.
Tan Jeng Wei
15:20 Enhancement #5837: [UAT3-9 - UAT_158] - Post Event > Programmes > Feedback > List By Company > Edit
Issue was changed from CR to Enhancement based on Discussion on CR and Conditional Sign-Off Issue List [Continuation]... Siti Norahayu Mohd Desa

March 19, 2016

10:05 Enhancement #5866 (Internal Testing): [UAT1&2 - UAT_098] - Planning >> Planning Report >> Overall...
Tan Jeng Wei

March 18, 2016

19:23 Change #6054 (User Acceptance Test): [UAT1&2 - UAT_122] - Planning >> Activities List

18/3/2016 - Sernd for SIT/UAT
Norhaidah Md Dasuki
19:15 Change #5949 (User Acceptance Test): [UAT1&2 - UAT_101] - Planning >> Activities List - Add Budge...
18/3/2016 - Sernd for SIT/UAT Norhaidah Md Dasuki
19:12 Change #5950 (User Acceptance Test): [UAT1&2 - UAT_108] - Planning JPPPA
18/3/2016 - Sernd for SIT/UAT Norhaidah Md Dasuki
19:09 Change #5951: [UAT1&2 - UAT_109] - Report Planning JPPPA >> List of Promotion Programme By All Mi...
18/3/2016 - Send for SIT/UAT Norhaidah Md Dasuki
19:07 Change #5948: [UAT1&2 - UAT_100] - Planning >> Activities List
18/3/2016 - Send for SIT/UAT Norhaidah Md Dasuki
18:38 Enhancement #5452: [UAT1&2 - UAT_115] - Report >> Generate Word Report
Ayu, Please proceed for Internal Testing Norhaidah Md Dasuki
18:36 Enhancement #5451: [UAT1&2 - UAT_114] - All Module >> Table Header Sorting
18/3/2016 - Send for SIT/UAT Norhaidah Md Dasuki
18:19 Enhancement #5452 (Internal Testing): [UAT1&2 - UAT_115] - Report >> Generate Word Report
Pending Development server deployment.
Do take note that microsoft word has limited function when generating jasper ...
Najmi Pasarudin
18:14 Enhancement #5450: [UAT1&2 - UAT_106] - Report Time Stamp
18/3/2016 - Send for SIT/UAT Norhaidah Md Dasuki
18:11 Change #5865 (User Acceptance Test): [UAT1&2 - UAT_092] - Planning >> Activities List
18/3/2016 - Send for SIT/UAT Norhaidah Md Dasuki
17:41 Enhancement #5449 (Development / Work In Progress): [UAT1&2 - UAT_088] - Search Filter >> Date Range
Based on further discussion with En. Rizal and SD (Najmie), TPMS will display detail search based on fixed starting y... Norhaidah Md Dasuki
17:00 Enhancement #5448 (User Acceptance Test): [UAT1&2 - UAT_050] - Administration >> Audit Trail
18/3/2016 - Send for SIT/UAT Norhaidah Md Dasuki
14:34 Change #5865 (Pending Review): [UAT1&2 - UAT_092] - Planning >> Activities List
test result attached Lim Leonard
14:33 Change #5949 (Pending Review): [UAT1&2 - UAT_101] - Planning >> Activities List - Add Budget Revi...
test result attached Lim Leonard
14:28 Bug #6092 (Pending Review): Planning >> Activities List
test result attached Lim Leonard
13:33 Change #5949 (Internal Testing): [UAT1&2 - UAT_101] - Planning >> Activities List - Add Budget Re...
Leo, please continue testing Norhaidah Md Dasuki
13:32 Bug #6092 (Internal Testing): Planning >> Activities List
Leo please test. Norhaidah Md Dasuki
12:12 Change #5867: [UAT1&2 - UAT_097] - Planning >> Planning Report >> Overall Summary >> Summary of W...
In progress.
Need to check on the data which is currently the data for summary report is not tally with the data sea...
Lizahwati Basirun
12:04 Change #5949: [UAT1&2 - UAT_101] - Planning >> Activities List - Add Budget Revised & Budget Type
List of issue fixed. please retest Aditya Prathama
11:26 Bug #6092: Planning >> Activities List
Finding: found null pointer on controller
Solution : fix null pointer to escape null pointer exception
Aditya Prathama
10:34 Enhancement #5665 (Pending Review): [M3-9/050] - Post Event >> Programmes (UAT3-9/251)
test result attached Lim Leonard
10:21 Change #5950 (Pending Review): [UAT1&2 - UAT_108] - Planning JPPPA
[Lizah - 18/03/2016]Tested and passed. Lizahwati Basirun

March 17, 2016

19:24 Change #6054 (Pending Review): [UAT1&2 - UAT_122] - Planning >> Activities List
Norhaidah Md Dasuki
19:05 Change #5865 (Internal Testing): [UAT1&2 - UAT_092] - Planning >> Activities List
Issue 2 - To Change label at below field(fix) deployed to http://172.25.96.136/matrade-tpms Aditya Prathama
18:58 Enhancement #5866 (Development / Work In Progress): [UAT1&2 - UAT_098] - Planning >> Planning Rep...
Norhaidah Md Dasuki
18:55 Enhancement #5447: [UAT1&2 - UAT_027] - Planning >> KPI Setting >> View >> Print Format
Send for SIT/UAT via email dated Wed, Feb 10, 2016
18/3/2016 - Resend for retest. Test environment via http://172....
Norhaidah Md Dasuki
18:15 Enhancement #6047 (Development / Work In Progress): [UAT1&2 - UAT_105] - Report Planning >> Summa...
Hi Jing Wei,
There is mistake on the screenshot given by Aishah (Inteksof). Please refer the update CR. Thank you.
Norhaidah Md Dasuki
17:58 Change #5949 (Development / Work In Progress): [UAT1&2 - UAT_101] - Planning >> Activities List -...
Dear Adit,
Kindly assist on the issue.
1) TPMS>Planning>Activities List
Unable to click on Add Activity. Syste...
Lizahwati Basirun
17:44 Change #5865 (Development / Work In Progress): [UAT1&2 - UAT_092] - Planning >> Activities List
Hi Adit,
Kindly assist on FAILED status. Thank you.
Tested on changes for issue 1 and issue 2.
Issue 1 - To ...
Lizahwati Basirun
Avatar?id=1966&size=24 15:32 Enhancement #5665 (Internal Testing): [M3-9/050] - Post Event >> Programmes (UAT3-9/251)
Hi Leonard,
Please help to test this enhancement on UAT environment.
Thank you.
Ngoh Chee Onn
15:29 Bug #6092 (Work Completed-End life cycle): Planning >> Activities List
Dear Adit,
Kindly assist to fix on the "blue screen" error. (THE SYSTEM HAS ENCOUNTERED AN ERROR. PLEASE CONTACT S...
Lizahwati Basirun
11:48 Change #6054: [UAT1&2 - UAT_122] - Planning >> Activities List
test result attached Lim Leonard
11:38 Enhancement #5448 (Pending Review): [UAT1&2 - UAT_050] - Administration >> Audit Trail
Norhaidah Md Dasuki
Avatar?id=1966&size=24 11:31 Enhancement #5628 (Pending Customer Feedback): [M3-9/019] - Promotion >> Registration Form Intern...
Hi Haidah,
Enhancement auto focus cannot be done, due to lack supported library for current project framework.
...
Ngoh Chee Onn
Avatar?id=1966&size=24 11:28 Change #6054 (Internal Testing): [UAT1&2 - UAT_122] - Planning >> Activities List
Hi Leonard,
Finished deploy for all related module. Please test on enhancement environment.
Thank you.
Ngoh Chee Onn
10:41 Enhancement #5448: [UAT1&2 - UAT_050] - Administration >> Audit Trail
test result attached Lim Leonard

March 16, 2016

18:36 Enhancement #5866 (Pending Customer Feedback): [UAT1&2 - UAT_098] - Planning >> Planning Report >...
Have to double confirm the requirement by user. Tan Jeng Wei
17:08 Enhancement #6047 (Internal Testing): [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Pro...
Hi Leo,
I was adding the SUMMARY BY BUDGET TYPE. Please retest after deployed from enhancement Branch. Thanks...
Tan Jeng Wei

March 15, 2016

11:24 Enhancement #5866: [UAT1&2 - UAT_098] - Planning >> Planning Report >> Overall Summary >> Details...
Jeng Wei,
Please help look into this.
Thank you.
Najmi Pasarudin
11:24 Enhancement #6047: [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Programme
Jeng Wei,
Please help look into this.
Thank you.
Najmi Pasarudin
10:05 Enhancement #5628: [M3-9/019] - Promotion >> Registration Form Internal & External (UAT3-9/247)
Hi Chee Onn,
Kindly assist.
Siti Norahayu Mohd Desa
10:04 Change #6054: [UAT1&2 - UAT_122] - Planning >> Activities List
Hi Chee Onn,
Kindly assist.
Siti Norahayu Mohd Desa

March 14, 2016

Avatar?id=1966&size=24 12:00 Change #5950 (Internal Testing): [UAT1&2 - UAT_108] - Planning JPPPA
Hi Ayu,
This CR finish develop and push to enhancement branch, please inform najmi deploy to enhancement environme...
Ngoh Chee Onn

March 11, 2016

17:21 Change #5948 (User Acceptance Test): [UAT1&2 - UAT_100] - Planning >> Activities List
test result is attached Lim Leonard
15:51 Change #6054: [UAT1&2 - UAT_122] - Planning >> Activities List
List below already deployed at http://172.25.96.136/matrade-tpms/login
Planning>Activities List - List of Activity
...
Aditya Prathama
15:49 Change #5865 (Internal Testing): [UAT1&2 - UAT_092] - Planning >> Activities List
Change development done, deployed at http://172.25.96.136/matrade-tpms Aditya Prathama

March 09, 2016

15:41 Change #5949 (Internal Testing): [UAT1&2 - UAT_101] - Planning >> Activities List - Add Budget Re...
Change Development completed please test on http://172.25.96.136/matrade-tpms-enhancement/login Aditya Prathama

March 08, 2016

18:30 Change #6054 (Closed - End of life cycle): [UAT1&2 - UAT_122] - Planning >> Activities List
To add Total Generated Sales (RM) and Total Approved Participants to the screen as below:
* Planning>Activities L...
Norhaidah Md Dasuki

March 07, 2016

18:43 Change #5663 (Pending Customer Feedback): [M3-9/048] - Post Event >> List Of Event (UAT3-9/250)
Norhaidah Md Dasuki
18:41 Enhancement #6047 (Closed - End of life cycle): [UAT1&2 - UAT_105] - Report Planning >> Summary O...
To enhance the report planing - summary work programmed list as per user request.
>Add Summary By Budget Type (ref...
Norhaidah Md Dasuki
18:34 Change #5949 (New - Begin Life Cycle): [UAT1&2 - UAT_101] - Planning >> Activities List - Add Bud...
Kindly proceed on the development. Refer attached CR Form. Norhaidah Md Dasuki
18:29 Change #5690 (Pending Customer Feedback): [M3-9/076] - Administration>> Template Management (UAT3...
Norhaidah Md Dasuki
18:28 Change #5709 (Pending Customer Feedback): [TPMS_Review] - Promotion >> Business Meeting (UAT3-9/244)
Norhaidah Md Dasuki
18:26 Change #5708 (Pending Customer Feedback): [TPMS_Review] - Promotion >> Business Meeting >> Master...
Norhaidah Md Dasuki
18:26 Enhancement #5866 (New - Begin Life Cycle): [UAT1&2 - UAT_098] - Planning >> Planning Report >> O...
Najmi, please proceed on the development. Refer attached confirmed requirement.
*Category change to Enhancement as...
Norhaidah Md Dasuki
18:19 Change #5867 (Internal Testing): [UAT1&2 - UAT_097] - Planning >> Planning Report >> Overall Summ...
Ayu, kindly recheck on the Data populated in the report to ensure its have valid information and tally with the screen. Norhaidah Md Dasuki
17:58 Change #5950: [UAT1&2 - UAT_108] - Planning JPPPA
Hi Chee Onn,
Kindly assist on this CR. Refer confirm requirement as per attached.
Norhaidah Md Dasuki
15:04 Enhancement #5448 (Internal Testing): [UAT1&2 - UAT_050] - Administration >> Audit Trail
Hi Leo,
Kindy prepare the test result.
[[http://172.25.96.136/matrade-tpms/]]
Norhaidah Md Dasuki
14:45 Change #5865 (Development / Work In Progress): [UAT1&2 - UAT_092] - Planning >> Activities List
Adit,
Kindly fix:
Issue (i): a. Change column sequence structure (please refer attachment TPMS - RIZAL.xlsx). Kin...
Norhaidah Md Dasuki
11:36 Enhancement #5453 (Pending Customer Feedback): [UAT1&2 - UAT_048 & 049] - Planning & Planning JPP...
send to En Rizal to have feedback on the look and feel.
date: Mon, Mar 7, 2016 at 11:36 AM
subject:[UAT1&2 - UAT_04...
Norhaidah Md Dasuki

March 03, 2016

14:29 Enhancement #5849 (User Acceptance Test): [UAT3-9 - UAT_159] - Post Event > Event Report > Local ...
Fixed. already revert back the code to production Aditya Prathama
13:25 Enhancement #5453 (Internal Testing): [UAT1&2 - UAT_048 & 049] - Planning & Planning JPPPA >> Act...
Calendar updated with filter day month year and programtype
please test at http://172.25.96.136/matrade-tpms-enhance...
Aditya Prathama

March 02, 2016

15:09 Enhancement #5934 (User Acceptance Test): Local Trade Fair > top 5/10 product and service by hall
test result attached Lim Leonard
11:34 Change #5874 (Pending Customer Feedback): [UAT3-9 - UAT_162] - Post Event > Programmes > Feedback...
Hold until get feedback from Inteksoft Norhaidah Md Dasuki
11:34 Enhancement #5837 (Pending Customer Feedback): [UAT3-9 - UAT_158] - Post Event > Programmes > Fee...
Hold until get feedback from Inteksoft Norhaidah Md Dasuki
10:46 Change #5948 (Internal Testing): [UAT1&2 - UAT_100] - Planning >> Activities List
Aditya Prathama
10:46 Change #5948: [UAT1&2 - UAT_100] - Planning >> Activities List
Updated page able to test on http://172.25.96.136/matrade-tpms-enhancement. Aditya Prathama
 

Also available in: Atom