Activity
From September 24, 2013 to October 23, 2013
October 23, 2013
- 12:49 Bug #3793 (User Acceptance Test): M2U History: Pagination
- 12:46 Task #3821 (User Acceptance Test): BII CC Payment: Change De102 Message Format
- 11:41 Bug #3793: M2U History: Pagination
- * Already done testing.
* The result :
- m2u history show pagination more than 1 page (file attach). - 11:15 Task #3821: BII CC Payment: Change De102 Message Format
- * Already done testing.
* The result :
1. For testing on free amount(session expired when click submit), full amo...
October 22, 2013
- 18:54 Task #3567: MSS BRS
- Thomas is reviewing it since 22nd October 2013 evening.
- 18:54 Task #3566 (Pending Customer Feedback): RIB BRS
- Thomas is reviewing it since 22nd October 2013 evening.
- 18:54 Task #3567 (Pending Customer Feedback): MSS BRS
- 18:53 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (User Acceptance Test): New Requirement: Loan "PITA" Account
- 18:51 Maybank Bii Internet Banking Phase 2 UAT Task #3757 (User Acceptance Test): Mobile Postpaid & Prepaid : Change Format at Bit 37
- 18:50 Maybank Bii Internet Banking Phase 2 UAT Task #3758 (User Acceptance Test): ON/2 Error Message: To Change Label
- 18:50 Bug #3793 (Internal Testing): M2U History: Pagination
- Mas Toomy,
Kindly test this issue that has been fixed by Najmi.
Test in UAT. Username: ribuser1, password: pass... - 18:36 Task #3821 (Internal Testing): BII CC Payment: Change De102 Message Format
- Toomy, this item has been deployed to UAT because Pak Rudhi wants to test it.
At the same please assist to make su... - 18:31 Task #3821: BII CC Payment: Change De102 Message Format
- Done development and deployed to UAT, in order for Pak Rudhi to test. I never get any successful message though De102...
- 18:27 Task #3821 (Development / Work In Progress): BII CC Payment: Change De102 Message Format
- 15:00 Task #3821 (Closed - End of life cycle): BII CC Payment: Change De102 Message Format
- Need to change the De102 Message Format to Host.
Current system: De102 = Currency Code ISO+ From Account
New requ... - 14:54 Task #3467 (Development / Work In Progress): Biller Reconciliation
October 21, 2013
- 17:35 Task #3467: Biller Reconciliation
- Hi Chee Ping,
Biller reconciliation requirement has been changed to suit with Typ3 Citynet format.
Please assis...
October 18, 2013
- 10:50 Bug #3793 (Finished Development): M2U History: Pagination
- 10:48 Maybank Bii Internet Banking Phase 2 UAT Task #3742 (Finished Development): TAC Window Pop Up Look & Feel
- 10:47 Maybank Bii Internet Banking Phase 2 UAT Task #3742 (Development / Work In Progress): TAC Window Pop Up Look & Feel
- 10:08 Bug #3793 (Development / Work In Progress): M2U History: Pagination
October 17, 2013
- 20:53 Task #3496 (Pending Customer Feedback): To change My Plan Account (8XXXXXXXXX) flow
- 5. My Plan account, show under Savings- need further confirmation about this tomorrow. Requirement is different from ...
- 19:34 Task #3490 (Pending SIT Deployment): User migration: Phone # and Email address
- 19:33 Task #3490 (Finished Development): User migration: Phone # and Email address
- Done and tested locally.
- 19:33 Task #3490 (Development / Work In Progress): User migration: Phone # and Email address
- Wsdl has been updated to cater for the existing email thrown by IBS. Wahyu push the item back to us to do development.
- 17:42 Task #3499 (Pending SIT Deployment): BII Credit Card : add "PAY" button
- 17:41 Task #3499 (Finished Development): BII Credit Card : add "PAY" button
- Done and tested.
- 17:39 Task #3499 (Development / Work In Progress): BII Credit Card : add "PAY" button
- Issues reported:
2013-10-16 Thomas: If from account blank, it still show. Requested to be:
- no from account: thr... - 16:41 Bug #3793 (Closed - End of life cycle): M2U History: Pagination
- Najmi, please assist:
Online M2U history which consists more than 2 pages will give this error:
[ServletExcepti... - 16:34 Task #3501 (Pending SIT Deployment): Interbank Online: To add "reference no"
- 16:34 Task #3501 (Finished Development): Interbank Online: To add "reference no"
- 16:31 Task #3501 (Development / Work In Progress): Interbank Online: To add "reference no"
- result does not match with requirement. minimum length = 0, maximum length = 16.
- 14:05 Maybank Bii Internet Banking Phase 2 UAT Task #3748: New Requirement: Loan "PITA" Account
- * Already testing.
* The result (file attach).
- PITA Account can not allow user to do download statement. - 13:47 Maybank Bii Internet Banking Phase 2 UAT Task #3741 (Finished Development): M2U Receipt: Change dual language to single language
October 16, 2013
- 17:10 Maybank Bii Internet Banking Phase 2 SIT Bug #3719 (Finished Development): 6:sent item (Send box)
- Query to update DB:
update "DBO"."IB_NAVIGATION"
set PAGE_PATH ='/ib117/secureMailboxMain.do'
where NODE_NAME =...
October 14, 2013
- 09:49 Maybank Bii Internet Banking Phase 2 UAT Task #3741 (Development / Work In Progress): M2U Receipt: Change dual language to single language
October 11, 2013
- 17:58 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Internal Testing): New Requirement: Loan "PITA" Account
- Toomy,
Please assist to test using ribuser/password12345 in bii-rib-sit
1. PITA Account shall be parked under cre... - 17:54 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Finished Development): New Requirement: Loan "PITA" Account
- 17:31 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Development / Work In Progress): New Requirement: Loan "PITA" Account
- Requireemnt Change from Pak Wahyu:
PITA Account is a loan account which uses credit card service.
PITA Account wi... - 14:46 Maybank Bii Internet Banking Phase 2 UAT Task #3758 (Pending SIT Deployment): ON/2 Error Message: To Change Label
- 14:45 Maybank Bii Internet Banking Phase 2 UAT Task #3758 (Finished Development): ON/2 Error Message: To Change Label
- Done.
- 12:37 Maybank Bii Internet Banking Phase 2 UAT Task #3757 (Internal Testing): Mobile Postpaid & Prepaid : Change Format at Bit 37
- 12:35 Maybank Bii Internet Banking Phase 2 UAT Task #3757 (Finished Development): Mobile Postpaid & Prepaid : Change Format at Bit 37
- Done.
- 12:27 Maybank Bii Internet Banking Phase 2 SIT Task #3721 (Development / Work In Progress): 34.Fund Transfer > FCR: Transfer to Yen Account shal...
- 12:25 Maybank Bii Internet Banking Phase 2 SIT Task #3721: 34.Fund Transfer > FCR: Transfer to Yen Account shall not allow decimal point.
- * Already test in http://10.226.16.74:9080/bii-rib-sit/common/Login.do
* The result : show error when submit (file a... - 12:08 Maybank Bii Internet Banking Phase 2 UAT Task #3758 (Closed - End of life cycle): ON/2 Error Message: To Change Label
- Pak Hakim to give dual language for these items:
• Internet banking Prepaid : informasi screen yang ditampilkan "... - 12:05 Maybank Bii Internet Banking Phase 2 UAT Task #3757 (Closed - End of life cycle): Mobile Postpaid & Prepaid : Change Format at Bit 37
- This is for Artajasa Certification:
Request from Pak Ridho:
Internet banking Postpaid : informasi screen nomer Re...
October 10, 2013
- 16:28 Maybank Bii Internet Banking Phase 2 UAT Task #3742: TAC Window Pop Up Look & Feel
- Item 3 - 6, mainly can be done via javascript, however, different browsers & different versions will have it's own wa...
- 14:39 Maybank Bii Internet Banking Phase 2 UAT Task #3740 (Finished Development): M2U Receipt : Reduce font size
- 12:47 RIB Phase 2 Development Task #3498: email notification: sending to Beneficiary email if a valid email key in by customer
- Hi Toomy,
Update for point #4 & #6:
URL: https://10.225.16.152/owa/
Username: lab\TWicaksono
Password: Bii12345 - 12:44 Task #3481 (Finished Development): Change Previous 1 month transaction to 3 months transaction
- 12:42 Maybank Bii Internet Banking Phase 2 SIT Task #3735 (Finished Development): Credit Card Statement
- 11:11 RIB Phase 2 Development Task #3498: email notification: sending to Beneficiary email if a valid email key in by customer
- Hi Toomy,
How to test in SIT:
1. Perform new interbank online transfer.
2. So far I do not know the beneficiar...
October 09, 2013
- 05:10 Maybank Bii Internet Banking Phase 2 UAT Task #3736 (User Acceptance Test): Loan account details: Show Amount & Date Format, remove unnece...
- Deployed to SIT, INT-UAT, and UAT on 9th October evening. Already informed Pak Aditya via email to test. bii support ...
- 05:09 Maybank Bii Internet Banking Phase 2 UAT Task #3736: Loan account details: Show Amount & Date Format, remove unnecessary notes
- Below is the test result. I will attach the screenshot later.
Maturity Date = Feb 1, 2015
Current Interest Balanc... - 05:04 Maybank Bii Internet Banking Phase 2 UAT Task #3736 (Internal Testing): Loan account details: Show Amount & Date Format, remove unnecessar...
- 05:03 Maybank Bii Internet Banking Phase 2 UAT Task #3736 (Finished Development): Loan account details: Show Amount & Date Format, remove unnece...
- 05:01 Maybank Bii Internet Banking Phase 2 UAT Task #3736: Loan account details: Show Amount & Date Format, remove unnecessary notes
- Done as per requested by Pak Aditya.
- 05:00 Maybank Bii Internet Banking Phase 2 UAT Task #3746 (User Acceptance Test): CardPac: Ignore CardPac Error at Account & Summary
- I will inform Thomas to test it tomorrow morning.
- 04:58 Maybank Bii Internet Banking Phase 2 UAT Task #3746 (Internal Testing): CardPac: Ignore CardPac Error at Account & Summary
- How did I test:
1. Login using ribuser
2. Its GCIF has bunch of account including 2 Credit Cards
3. CardPac syst... - 04:55 Maybank Bii Internet Banking Phase 2 UAT Task #3746 (Finished Development): CardPac: Ignore CardPac Error at Account & Summary
- 04:54 Maybank Bii Internet Banking Phase 2 UAT Task #3746: CardPac: Ignore CardPac Error at Account & Summary
- Change the flow of GetMonetaryInfoCCService, whereby no validation will be thrown if its response from host is not su...
- 04:50 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (User Acceptance Test): New Requirement: Loan "PITA" Account
- Deployed to both SIT, UAT, INT-UAT (Artajasa Certification). Have not yet told Pak Wahyu to test. I will inform him T...
- 04:48 Maybank Bii Internet Banking Phase 2 UAT Task #3748: New Requirement: Loan "PITA" Account
- Tested with PITA account which is 8888881000000755. In BIIAccount.java, I have added checking if accounttypenumber en...
- 04:44 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Internal Testing): New Requirement: Loan "PITA" Account
- 04:44 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Finished Development): New Requirement: Loan "PITA" Account
- 04:43 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Development / Work In Progress): New Requirement: Loan "PITA" Account
- Hi Lee Yong,
It has been done. - 01:39 Maybank Bii Internet Banking Phase 2 UAT Task #3748: New Requirement: Loan "PITA" Account
- Hi Gabby,
Please discuss with customer to get the clear requirements of this PITA account. Then we can discuss on th... - 01:33 Maybank Bii Internet Banking Phase 2 SIT Task #3721 (Internal Testing): 34.Fund Transfer > FCR: Transfer to Yen Account shall not allow de...
- Hi Toomy,
Please test. If ok, change the status to SIT and deploy for customer retest. - 01:31 Maybank BII Internet Banking Phase 3 Task #3466: FD withdrawal-change flow
- Hi Gabby, please help to follow with customer about this status.
- 01:29 RIB Phase 2 Development Task #3498 (Internal Testing): email notification: sending to Beneficiary email if a valid email ...
- Hi Toomy,
Please test. - 18:09 Maybank Bii Internet Banking Phase 2 UAT Task #3748 (Closed - End of life cycle): New Requirement: Loan "PITA" Account
- Pak Wahyu added PITA Account which account format seems different. His goal previously was to test "Loan account that...
- 17:47 Maybank Bii Internet Banking Phase 2 UAT Task #3746 (Development / Work In Progress): CardPac: Ignore CardPac Error at Account & Summary
- 17:44 Maybank Bii Internet Banking Phase 2 UAT Task #3746 (Closed - End of life cycle): CardPac: Ignore CardPac Error at Account & Summary
- Pak Thomas request this item verbally stating that:
If CardPac (credit card system which handles all related credi... - 17:41 Maybank Bii Internet Banking Phase 2 UAT Task #3736 (Development / Work In Progress): Loan account details: Show Amount & Date Format, rem...
- Still waiting until ESB fix their issue of transaction file close 90. Else, account & summary can't be accessed, so d...
- 15:06 Maybank Bii Internet Banking Phase 2 UAT Task #3742: TAC Window Pop Up Look & Feel
- Hi Gabby
1. TAC window shall take over the entire screen. The transaction screen will be a foreground and can't be... - 14:54 Maybank Bii Internet Banking Phase 2 UAT Task #3740: M2U Receipt : Reduce font size
- Hi Gabby,
Previously, the setting was (1)font=10 and (2)line-spacing=20.
Attached is example of (1)font=8 and ... - 14:31 Maybank Bii Internet Banking Phase 2 UAT Task #3742 (Closed - End of life cycle): TAC Window Pop Up Look & Feel
- Amy,
Would you able to assist on this?
User expects to have windows TAC not in 'windows pop up form'. If I refe... - 14:15 Maybank Bii Internet Banking Phase 2 UAT Task #3740 (Development / Work In Progress): M2U Receipt : Reduce font size
- 13:30 Maybank Bii Internet Banking Phase 2 UAT Task #3741 (Closed - End of life cycle): M2U Receipt: Change dual language to single language
- Hi Najmi,
Kindly assist to change the m2u receipt into single language instead of dual language. It means that, th... - 13:27 Maybank Bii Internet Banking Phase 2 UAT Task #3740 (Closed - End of life cycle): M2U Receipt : Reduce font size
- Hi Najmi,
This is the copy of task https://hub.penril.net/redmine/issues/3500.
According to user the receipt is...
October 08, 2013
- 17:54 Maybank Bii Internet Banking Phase 2 SIT Task #3721 (Finished Development): 34.Fund Transfer > FCR: Transfer to Yen Account shall not allo...
- 17:53 RIB Phase 2 Development Task #3498 (Finished Development): email notification: sending to Beneficiary email if a valid em...
- 17:01 Maybank Bii Internet Banking Phase 2 UAT Task #3736: Loan account details: Show Amount & Date Format, remove unnecessary notes
- This was reported by Aditya and he would like to add more for loan account details:
The fields highlighted in gree... - 16:48 Maybank Bii Internet Banking Phase 2 UAT Task #3736 (Closed - End of life cycle): Loan account details: Show Amount & Date Format, remove ...
- To remove text: “*Loan Account only for display” in Account & Summary under loan account.
Loan details:
- To add ... - 16:42 Maybank Bii Internet Banking Phase 2 SIT Task #3735 (Development / Work In Progress): Credit Card Statement
- OK
- 16:40 Maybank Bii Internet Banking Phase 2 SIT Task #3735 (Closed - End of life cycle): Credit Card Statement
- Najmi,
Could you assist on this?
Current issue:
- Credit card previous/next statement does not have pagination.... - 16:35 Maybank Bii Internet Banking Phase 2 SIT Task #3734 (Dropped-End of life cycle): FTL: Link Account - Validation Causes Field to Reset
- During link account, if the validation pops up (such as host giving error response 1212 Customer Channel already exis...
- 13:03 Task #3481: Change Previous 1 month transaction to 3 months transaction
- Not really. Already change from 1 month to 3 months. The pagination still incomplete.
- 12:48 Task #3481: Change Previous 1 month transaction to 3 months transaction
- Najmi, are you facing any issue with this?
October 04, 2013
- 18:14 Maybank Bii Internet Banking Phase 2 SIT Task #3721 (Development / Work In Progress): 34.Fund Transfer > FCR: Transfer to Yen Account shal...
- 16:49 Task #3566 (Pending Review): RIB BRS
- Ms. Lee Lee,
Please review both MSS & RIB BRS v1.1. You can refer to document amendment details, it can link to re... - 16:47 Task #3566 (Finished Development): RIB BRS
- Done.
- 16:42 Task #3476 (Pending UAT Deployment): Today's Transaction - kolom Balance
- 16:41 Maybank Bii Internet Banking Phase 2 SIT Bug #3720 (Work Completed-End life cycle): 16.Today's Transaction - kolom Balance, why all zero?
- tested good by Wahyu in SIT.
- 15:01 Task #3472 (Finished Development): employee account for SKN/RTGS transaction
- Change to get the charges code from business options, one employee account or gold account will point to 1 changes code.
- 14:36 Maybank Bii Internet Banking Phase 2 SIT Bug #3720 (System Integration Test): 16.Today's Transaction - kolom Balance, why all zero?
- Already redeployed to bii-rib-sit and ask Wahyu to retest. Waiting for feedback.
- 13:07 Maybank Bii Internet Banking Phase 2 SIT Bug #3720 (Finished Development): 16.Today's Transaction - kolom Balance, why all zero?
- The balance is hide due to previous request. Now change to show balance
- 13:00 Maybank Bii Internet Banking Phase 2 SIT Task #3721: 34.Fund Transfer > FCR: Transfer to Yen Account shall not allow decimal point.
- Assign to Najmi because this issue cause by Najmi added one toEmailAddress in FCR module, but in the screen and form-...
- 12:41 Maybank Bii Internet Banking Phase 2 SIT Task #3721 (Closed - End of life cycle): 34.Fund Transfer > FCR: Transfer to Yen Account shall no...
- Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya. - 12:39 Maybank Bii Internet Banking Phase 2 SIT Bug #3720 (Closed - End of life cycle): 16.Today's Transaction - kolom Balance, why all zero?
- Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya. - 12:36 Maybank Bii Internet Banking Phase 2 SIT Bug #3719 (Closed - End of life cycle): 6:sent item (Send box)
- Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya. - 12:21 Task #3483 (Pending UAT Deployment): Requested to remove the footer:About Us | Branches/ATM | Car...
- 4 oct:
Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya.
P... - 12:20 Task #3506 (Pending UAT Deployment): Change TAC notification message
- 4 oct:
Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya.
P... - 12:18 Task #3478 (Pending UAT Deployment): Change Password max length
- 4 Oct:
Gabby,
Mohon dicek kembali untuk point 6,16,34 karena masih ada error terlampir screenshot detailnya.
P...
October 03, 2013
- 18:48 RIB Phase 2 Development Task #3505 (System Integration Test): Loan Account : Do not show Loan Account which is fully paid
- 18:47 RIB Phase 2 Development Task #3504 (System Integration Test): Loan Account:show details information
- 18:46 RIB Phase 2 Development Task #3503 (System Integration Test): Joint account: not allow to show in account & summary and L...
- 18:45 RIB Phase 2 Development Task #3510 (System Integration Test): Link/Unlink Account page:allow the customer select the acco...
- 18:43 Task #3501 (System Integration Test): Interbank Online: To add "reference no"
- 18:42 RIB Phase 2 Development Task #3500 (System Integration Test): M2U Receipt : Reduce font size
- 18:41 Task #3499 (System Integration Test): BII Credit Card : add "PAY" button
- 18:39 Task #3496 (System Integration Test): To change My Plan Account (8XXXXXXXXX) flow
- 18:38 Task #3493 (System Integration Test): Currency Code Create, Edit, and Details page
- 18:38 Task #3509 (System Integration Test): To change the MT103 message for FCR's Mt103RECVBIC (table) ...
- 18:37 Task #3490 (System Integration Test): User migration: Phone # and Email address
- 18:36 Task #3489 (System Integration Test): FCR: changes the MT103 message and value X & XXX
- 18:35 Task #3488 (System Integration Test): SKN/RTGS: add 2nd charges in MSS
- 18:33 Task #3507 (System Integration Test): Change the alignment of right buttons
- 18:28 Task #3506 (System Integration Test): Change TAC notification message
- 18:26 Task #3478 (System Integration Test): Change Password max length
- 18:25 Task #3476 (System Integration Test): Today's Transaction - kolom Balance
- 18:24 Task #3474 (System Integration Test): Foreign Currency : Transaksi Valas - 3 charges (charges 1,2...
- 18:24 Task #3473 (System Integration Test): Requested the longer Benefinary name and message
- 18:22 Task #3471 (System Integration Test): Trf SKN/LLG List Destination Bank
- 18:21 Task #3470 (System Integration Test): Monthly report (refer to new format)
- 18:21 RIB Phase 2 Development Task #3469 (System Integration Test): Exchange Rate (all items hv foreign currency involved)
- 18:20 RIB Phase 2 Development Task #3468 (System Integration Test): Bill payment - Oustanding payment request
- 18:19 Task #3467 (System Integration Test): Biller Reconciliation
- 18:18 RIB Phase 2 Development Task #3465 (System Integration Test): sent item (Send box)
- 18:16 Task #3460 (System Integration Test): LLD report
- 18:06 Task #3472 (Development / Work In Progress): employee account for SKN/RTGS transaction
- REQUIREMENT CHANGE, Update from Pak Thomas 3rd October 2013 :
- Change the design of employee charges
Current C... - 18:06 Task #3486 (System Integration Test): TAC pop up windows
- pls remember to include Najmi latest changes today 3 oct 3:28pm. once deploy to SIT, pls test on the all browsers, th...
- 18:02 RIB Phase 2 Development Task #3505 (Pending Customer Feedback): Loan Account : Do not show Loan Account which is fully paid
- Pending from Pak Thomas to give the sample data in SIT/UAT, so that it will allow us to do testing.
Refer to email... - 17:51 Task #3486: TAC pop up windows
- As per our email to confirm whether technically can it be done and since did not get any reply and others developers ...
- 17:50 Task #3497 (System Integration Test): Fund Transfer > FCR
- * Already done testing.
* The result in file attach. - 17:18 RIB Phase 2 Development Task #3505 (Finished Development): Loan Account : Do not show Loan Account which is fully paid
- 17:18 RIB Phase 2 Development Task #3505: Loan Account : Do not show Loan Account which is fully paid
- Done.
- 16:46 RIB Phase 2 Development Task #3505 (Development / Work In Progress): Loan Account : Do not show Loan Account which is ful...
- Change requirement:
Current Interest Balance = 0
Current Principal Amount = 0
Late Charge Past Due Amount = 0
... - 16:30 RIB Phase 2 Development Task #3505 (Pending Customer Feedback): Loan Account : Do not show Loan Account which is fully paid
- Update from Thomas, 3rd October 2013 03:28 PM:
Current Interest Balance = 0
Current Principal Amount = 0
Late Ch... - 15:39 RIB Phase 2 Development Task #3492 (System Integration Test): RIB: Bill Payment > Mobile Postpaid.
- 15:31 RIB Phase 2 Development Task #3492 (Pending SIT Deployment): RIB: Bill Payment > Mobile Postpaid.
- Hi Lee Lee,
Item had been tested by Toomy at bii-int-sit environment and passed.
This item in fact is now in te... - 15:23 Task #3508: To add 1 more item (Terminated) under the drop down list: Pembukaan Deposito: Choice ...
- Yes, Further question was raised regarding to this item in this email subject: Re: [BII M2U] Request for Test Data (U...
- 15:20 Task #3497 (Development / Work In Progress): Fund Transfer > FCR
- Mas Toomy,
According to above result, the testing was considered FAIL. Kindly look once more into the requirement:... - 15:15 Task #3486 (Pending Customer Feedback): TAC pop up windows
- Try some research and seems it can not be done for IE.
http://stackoverflow.com/questions/5968779/how-to-make-ie-... - 14:50 Task #3508: To add 1 more item (Terminated) under the drop down list: Pembukaan Deposito: Choice ...
- may l know that you are having further question to ask customer in order continue finish the development work or it w...
- 14:49 RIB Phase 2 Development Task #3492: RIB: Bill Payment > Mobile Postpaid.
- may l know that you are having further question to ask customer in order continue finish the development work or it w...
- 14:45 Task #3497: Fund Transfer > FCR
- may l know that you are having further question to ask customer in order continue finish the development work or it w...
- 14:39 RIB Phase 2 Development Task #3502 (System Integration Test): User migration: To change the current migration progress by...
- l would assumed it tested in SIT environment from Penril internal team. so l change to status SIT. Pending Bank team ...
- 13:26 Task #3496 (Finished Development): To change My Plan Account (8XXXXXXXXX) flow
- 12:50 Task #3566 (Development / Work In Progress): RIB BRS
- pls let me know the status for redmine: 3486 in order to update to the FSD.
October 02, 2013
- 19:43 Task #3496 (Development / Work In Progress): To change My Plan Account (8XXXXXXXXX) flow
- Just receive email from Gabby, in order to check My Plan Account, we need to check the product code also. Below are t...
- 18:37 RIB Phase 2 Development Task #3465 (Pending UAT Deployment): sent item (Send box)
- Thanks Toomy, this item will be Pending for UAT deployment then.
- 18:36 RIB Phase 2 Development Task #3498: email notification: sending to Beneficiary email if a valid email key in by customer
- Can test email function for New Fund Transfer.
Favorite Fund Transfer still need fixes. - 18:34 Task #3566 (Pending Review): RIB BRS
- 18:33 Task #3567 (Pending Review): MSS BRS
- 18:32 Task #3566 (Finished Development): RIB BRS
- 18:32 Task #3567 (Finished Development): MSS BRS
- 18:31 Task #3566 (Development / Work In Progress): RIB BRS
- 18:31 Task #3567 (Development / Work In Progress): MSS BRS
- 18:27 RIB Phase 2 Development Task #3502: User migration: To change the current migration progress by hide the security image &...
- * Already done testing.
* The result (file attach). - 18:08 Task #3462 (Pending Customer Feedback): Credit Card Statement Download
- We not able to continue, because it will throw "Pesan Kesalahan" and "Anda Belum Login" after sent http post to that ...
- 17:18 RIB Phase 2 Development Task #3502 (Internal Testing): User migration: To change the current migration progress by hide t...
- Mas Toomy,
Please test this item in SIT. The test goal is to have the box's size surrounding user password smaller... - 15:05 RIB Phase 2 Development Task #3502: User migration: To change the current migration progress by hide the security image &...
- please update when can this be completed.
- 11:26 Task #3496 (Pending Customer Feedback): To change My Plan Account (8XXXXXXXXX) flow
- Due the current account also start with "8", we cannot differentiate which one is my plan account. Just ask Haryono a...
- 11:07 Task #3463 (Pending Customer Feedback): SI
- Host SI webservice show socket timeout on the inquiry part, and show error message invalid username/password in the r...
October 01, 2013
- 18:07 Task #3486: TAC pop up windows
- 2. remove the min and max button - require assistant
- 18:04 Task #3486: TAC pop up windows
- 1. make TAC window smaller - done by Najmi
2. remove the min and max button - require assistant
3. changing of cont... - 17:56 Task #3486 (Development / Work In Progress): TAC pop up windows
- Najmi
may we confirm that
1. make TAC window smaller - done by Najmi?
2. remove the min and max button --> need G... - 17:53 RIB Phase 2 Development Task #3498 (Development / Work In Progress): email notification: sending to Beneficiary email if ...
- 17:53 Task #3486 (Finished Development): TAC pop up windows
- 13:47 Task #3479 (Pending Customer Feedback): User Migration
- Already done create a ejb to compile all the migrated customer id into a text file. For the biller migration list can...
September 30, 2013
- 15:22 RIB Phase 2 Development Task #3510 (Finished Development): Link/Unlink Account page:allow the customer select the account...
- Finish changed in link account and unlink account function to include account rule. To check whether this account abl...
- 11:30 Task #3484: FTL: Change email length from 30 to 40 chars.
- The key concept of testing is ensure the module is works as requirements or design. Also, not only to check any error...
- 10:16 Task #3484: FTL: Change email length from 30 to 40 chars.
- * Already done testing and no error found.
September 29, 2013
- 17:00 Task #3497 (Pending Customer Feedback): Fund Transfer > FCR
- * Already done testing.
* The result in file attach. - 16:39 Task #3484 (System Integration Test): FTL: Change email length from 30 to 40 chars.
- 16:37 Task #3483 (System Integration Test): Requested to remove the footer:About Us | Branches/ATM | Ca...
- 16:26 Task #3483: Requested to remove the footer:About Us | Branches/ATM | Career at BII | Contact Us
- * Already done testing.
* The result :
- There is no footer information (About Us | Careers at BII, etc) in ALL R... - 16:17 RIB Phase 2 Development Task #3492 (Pending Customer Feedback): RIB: Bill Payment > Mobile Postpaid.
- * Already done testing.
* The result :
- File Attach - 16:08 Task #3483 (Internal Testing): Requested to remove the footer:About Us | Branches/ATM | Career at...
- Mas Toomy,
Please test this item:
1. Make sure the footer information (About Us | Careers at BII, etc) do not a... - 16:06 Task #3472 (Internal Testing): employee account for SKN/RTGS transaction
- Mas Toomy,
The test process is siimilar to https://hub.penril.net/redmine/issues/3488. Kindly refer to the informa... - 16:03 Task #3488 (Internal Testing): SKN/RTGS: add 2nd charges in MSS
- Mas Toomy,
to test this item, kindly perform skn/rtgs transfer.
To checker whether the FEE is sent correctly to... - 16:02 Task #3484 (Pending Customer Feedback): FTL: Change email length from 30 to 40 chars.
- * Already done testing.
* The result :
- If input email with not correct email format show message error (file at... - 15:55 Task #3495 (Closed - End of life cycle): To change Credit Card: "Active" status to 1 instead of 00
- Already in migration. I will close this item instead.
- 15:54 Task #3497 (Internal Testing): Fund Transfer > FCR
- Mas Toomy, please test for this item:
RIB > Fund Transfer > FCR
1. If transfer to Yen
2. Key in amount ¥1000.1... - 15:29 Task #3499 (Internal Testing): BII Credit Card : add "PAY" button
- Mas Toomy,
Please test below item. Kindly refer to RIB BRS Phase 2 v1.0.
RIB > Accounts & Banking > Credit Card... - 15:29 Maybank BII Internet Banking Phase 3 Task #3466 (Pending Customer Feedback): FD withdrawal-change flow
- * According Gabby, ESB for this services not yet have.
- 15:26 Task #3508 (Pending Customer Feedback): To add 1 more item (Terminated) under the drop down list:...
- * Already done testing.
* The result (file attached). - 15:23 Task #3501 (Internal Testing): Interbank Online: To add "reference no"
- I will draft out one email to BII for this.
Mas Toomy, please remind me on this. - 15:14 RIB Phase 2 Development Task #3503 (Internal Testing): Joint account: not allow to show in account & summary and Link acc...
- Bii has not yet provided the joint account.
I will draft an email to BII to get joint account.
Mas Toomy, pleas... - 15:12 RIB Phase 2 Development Task #3504 (Internal Testing): Loan Account:show details information
- Mas Toomy,
Kindly test for below loan account.
Previously loan account doesn't have details page, now loan acco... - 13:45 Task #3497 (Finished Development): Fund Transfer > FCR
- 13:43 RIB Phase 2 Development Task #3505 (Internal Testing): Loan Account : Do not show Loan Account which is fully paid
- Toomy, understood that ribuser does not have loan account.
I will request to BII team tomorrow morning, please kee... - 13:37 Task #3506 (Internal Testing): Change TAC notification message
- How to test TAC notification message:
Login to MSS:
1. Customer Profile
2. find user 'ribuser', take note on the... - 13:26 Task #3508 (Internal Testing): To add 1 more item (Terminated) under the drop down list: Pembukaa...
- Mas Toomy,
Please check The Time Deposit Placement.
How to check:
- Go to RIB > Time Deposit > TIme Deposit Pl... - 13:17 Task #3499 (Finished Development): BII Credit Card : add "PAY" button
September 28, 2013
- 20:44 Task #3499 (Development / Work In Progress): BII Credit Card : add "PAY" button
- 14:41 RIB Phase 2 Development Task #3504 (Finished Development): Loan Account:show details information
- 12:43 RIB Phase 2 Development Task #3505 (Finished Development): Loan Account : Do not show Loan Account which is fully paid
September 27, 2013
- 20:30 Task #3482 (System Integration Test): Change Default language
- 20:25 Task #3486: TAC pop up windows
- for any browser, do not want to see the min and max button...
- 18:43 Task #3501 (Finished Development): Interbank Online: To add "reference no"
- Done the development, waiting Rudhi to fix the echannel service. Then only can do one time testing.
- 18:17 Task #3486 (Development / Work In Progress): TAC pop up windows
- Need to check "2. remove the min and max button" for Internet Explorer
- 17:27 Task #3488 (Finished Development): SKN/RTGS: add 2nd charges in MSS
- Uncommented the 2nd charges already done in MSS. Change logic in RIB to get the charges from DB rather than in AppCon...
- 16:58 Task #3470: Monthly report (refer to new format)
- * not yet deploy with Gabby
- 16:09 RIB Phase 2 Development Task #3465: sent item (Send box)
- * sent item (Send box) already test.
* The result :
- Can not see the detail send box message when click link sub... - 15:08 Task #3476 (Pending UAT Deployment): Today's Transaction - kolom Balance
- 14:36 Task #3482 (Pending SIT Deployment): Change Default language
- * Already internal testing (file attach).
- 13:00 Task #3508 (Finished Development): To add 1 more item (Terminated) under the drop down list: Pemb...
- There are no drop down list for Principall roll over, Principal + interest roll over, and Terminated. It is ratio but...
- 11:05 Task #3483 (Finished Development): Requested to remove the footer:About Us | Branches/ATM | Caree...
September 26, 2013
- 19:13 RIB Phase 2 Development Task #3503 (Finished Development): Joint account: not allow to show in account & summary and Link...
- Done development. Waiting to test once Rudhi change one of the account to join account. For now we not able to test d...
- 18:08 Task #3506 (Finished Development): Change TAC notification message
- 17:58 Task #3472 (Finished Development): employee account for SKN/RTGS transaction
- 12:29 RIB Phase 2 Development Task #3498: email notification: sending to Beneficiary email if a valid email key in by customer
- Lee Lee,
For subject we using : Internet Banking Transaction Notification.
September 25, 2013
- 13:58 RIB Phase 2 Development Task #3498: email notification: sending to Beneficiary email if a valid email key in by customer
- received email from Thomas:
Based on discussion with pak Ferry , email notification for beneficiary using same with...
September 24, 2013
- 13:56 Task #3486: TAC pop up windows
- The TAC sample content screen
Also available in: Atom