Activity

From November 15, 2020 to December 14, 2020

December 11, 2020

21:58 1. CDB_Phase 2 & 3 Development Task #10108 (Internal Testing): [P1_Extended] : Mobile ANDROID - Update E-statement
Nurul Athira Abdul Rahim
15:31 1. CDB_Phase 2 & 3 Development Task #10108 (Finished Development): [P1_Extended] : Mobile ANDROID - Update E-statement
Hi Athira.
Finished the development for e-statement module.
please refer the link below for the apk.
SIT http...
Rahmat Aina Nadia
Avatar?id=1966&size=24 15:14 3. System Internal Testing (SIT) Enhancement #11374 (Internal Testing): SIT19-ePFG-To include save "Excel format" in zip file
Hi Athira,
Please grab the latest ePFG installer in email for this fixed.
Thank you
Ngoh Chee Onn
11:45 1. CDB_Phase 2 & 3 Development Task #10107 (Internal Testing): [P1_Extended] : Mobile IOS - Update E-statement
Hi Athira,
Please do testing on this part and let me know any issue raise ya.
Thank you
Nur Syamili Abdul Majid

December 10, 2020

06:35 3. System Internal Testing (SIT) Enhancement #11374 (Development / Work In Progress): SIT19-ePFG-To include save "Excel format" in...
Hi Chee Onn, kindly refer my attachment. I get failed result during save BP700 and Auto Debit.
Thanks
Nurul Athira Abdul Rahim
06:21 3. System Internal Testing (SIT) Enhancement #11373 (System Integration Test): SIT15_SIT16-ePFG-To re-arrange the details column
Tested and passed Nurul Athira Abdul Rahim
06:18 3. System Internal Testing (SIT) Enhancement #11372 (System Integration Test): SIT13-SIT14-SIT18_ePFG-To reposition button
Tested and passed Nurul Athira Abdul Rahim
06:18 3. System Internal Testing (SIT) Enhancement #11371 (System Integration Test): SIT12-ePFG-To fixed organization field to column 5 ...
Tested and passed Nurul Athira Abdul Rahim
06:17 3. System Internal Testing (SIT) Enhancement #11375 (System Integration Test): SIT20-ePFG-To add version
Nurul Athira Abdul Rahim
02:01 5. Training Compilation Issue Bug #10008: [BSN_Training-08&09] - CDB_Mobile(Android) - Change Passcode
Fixed, tested and deployed before CDB Live.
Nurul Athira Abdul Rahim
01:42 1. CDB_Phase 2 & 3 Development Task #10107: [P1_Extended] : Mobile IOS - Update E-statement
Hi Syamili, received update from Aditya that the restful integration is up and done. Kindly update the status.
Th...
Nurul Athira Abdul Rahim
01:40 1. CDB_Phase 2 & 3 Development Task #10108: [P1_Extended] : Mobile ANDROID - Update E-statement
Hi Aina, received update from Aditya that you are completed the task. Kindly update the status.
Thank youuu
Nurul Athira Abdul Rahim

December 09, 2020

18:48 3. System Internal Testing (SIT) Enhancement #11375: SIT20-ePFG-To add version
Tested and passed Nurul Athira Abdul Rahim

December 08, 2020

17:43 1. CDB_Phase 2 & 3 Development Bug #11414 (Work Completed-End life cycle): LHDN_To change Reference 3 at PPM file
Tested and passed by Azyan Erni Suhaireen Zulkifli
16:55 0. CDB_Change Request Change #11264: [SCP ID :##5559##] : Daily balance summary >> CR20002
Finished all the new changes. Please update the service name in ibam service info, service code = BBALSUMMARY. Please... Ngoh Chee Ping
14:46 1. CDB_Phase 2 & 3 Development Bug #11414 (Internal Testing): LHDN_To change Reference 3 at PPM file
Erni,
PPM file already test by Azyan. Reference 3 display as expected.
Nurul Hasnieza Bt Mohd Zamri

December 04, 2020

11:40 5. Training Compilation Issue Bug #10231: Mobile_IOS_Camera GUI
Completed a year ago. Nur Syamili Abdul Majid

December 03, 2020

18:00 1. CDB_Phase 2 & 3 Development Bug #11366 (Work Completed-End life cycle): LHDN_Error at total count at "Total No of Records"
Erni Suhaireen Zulkifli
18:00 1. CDB_Phase 2 & 3 Development Bug #11366: LHDN_Error at total count at "Total No of Records"
Tested and passed.
refer attach file
Erni Suhaireen Zulkifli
17:09 1. CDB_Phase 2 & 3 Development Bug #11366 (Internal Testing): LHDN_Error at total count at "Total No of Records"
Erni,
issue has been fixed. Kindly retest.
Nurul Hasnieza Bt Mohd Zamri
16:49 0. CDB_Change Request Change #11338: [SCP ID :##5559##] : CR20002-Daily balance summary-Mobile_IOS
Hi Mili,
Please assist to rename title for this module to be "Balance Inquiry"
Erni Suhaireen Zulkifli
16:49 0. CDB_Change Request Change #11333: [SCP ID :##5559##] : CR20002-Daily balance summary-Mobile_Android
Hi Darren,
Please assist to rename title for this module to be "Balance Inquiry"
Erni Suhaireen Zulkifli
16:48 0. CDB_Change Request Change #11264 (Development / Work In Progress): [SCP ID :##5559##] : Daily balance summary >> CR2...
Hi Chee Ping,
Please assist to change on below matter (as requested by user Rahmat Aris on 3/12/2020):
1. Remove ...
Erni Suhaireen Zulkifli
14:32 0. CDB_Change Request Change #11307 (Internal Testing): [SCP ID :##5602##] : PruBSN new file format >> CR20003
Not all fixes done.
Please do positive testing first.
Najmi Pasarudin
10:41 0. CDB_Change Request Change #11264: [SCP ID :##5559##] : Daily balance summary >> CR20002
Erni,
done deployment. Kindly retest at internal.
Nurul Hasnieza Bt Mohd Zamri

December 02, 2020

18:12 1. CDB_Phase 2 & 3 Development Bug #11414 (Finished Development): LHDN_To change Reference 3 at PPM file
Nurul Hasnieza Bt Mohd Zamri
17:41 1. CDB_Phase 2 & 3 Development Bug #11366 (Finished Development): LHDN_Error at total count at "Total No of Records"
Nurul Hasnieza Bt Mohd Zamri
13:04 1. CDB_Phase 2 & 3 Development Task #10107: [P1_Extended] : Mobile IOS - Update E-statement
Hi Athira,
Waiting for adit to merge the code and once dah boleh test I'll let you know.
Nur Syamili Abdul Majid
11:13 1. CDB_Phase 2 & 3 Development Bug #11414 (Work Completed-End life cycle): LHDN_To change Reference 3 at PPM file
Currently: PPM file display 092 at Reference 3
Expected: PPM file should display 077 at Reference 3
Erni Suhaireen Zulkifli
10:44 0. CDB_Change Request Change #11264: [SCP ID :##5559##] : Daily balance summary >> CR20002
Nieza,
Please assist to deploy at internal environment
Erni Suhaireen Zulkifli

November 30, 2020

18:06 0. CDB_Change Request Change #11264 (Internal Testing): [SCP ID :##5559##] : Daily balance summary >> CR20002
Updated based on the requirement changed. Please test after hasnieza or najmi is deployed. Ngoh Chee Ping
14:29 1. CDB_Phase 2 & 3 Development Task #10108: [P1_Extended] : Mobile ANDROID - Update E-statement
Hi Athira. For the UI already finished. Currently, I’m still doing the restful part. Would it be possible to have a l... Rahmat Aina Nadia
14:19 1. CDB_Phase 2 & 3 Development Task #10107: [P1_Extended] : Mobile IOS - Update E-statement
For the ui enhancement for eStatement mobile already finished. Got stuck on the restful. I need time until this Wedne... Nur Syamili Abdul Majid
13:11 1. CDB_Phase 2 & 3 Development Task #10107: [P1_Extended] : Mobile IOS - Update E-statement
Hi Syamili, what is the progress for this enhancement? Nurul Athira Abdul Rahim
13:09 0. CDB_Change Request Change #11338: [SCP ID :##5559##] : CR20002-Daily balance summary-Mobile_IOS
Hi Syamili, what is the progress for this CR on IOS? Nurul Athira Abdul Rahim
13:08 1. CDB_Phase 2 & 3 Development Task #10108: [P1_Extended] : Mobile ANDROID - Update E-statement
Hi Aina, any update on this?
Nurul Athira Abdul Rahim

November 27, 2020

13:28 0. CDB_Change Request Change #11307: [SCP ID :##5602##] : PruBSN new file format >> CR20003
Hi Najmi,
Found below issue, please recheck:
1. EOD Summary amount count error
2. File Processing .xls report do...
Erni Suhaireen Zulkifli
12:22 0. CDB_Change Request Task #11336 (Work Completed-End life cycle): To create PruBSN screen at authorization - Android
Tested and passed for verifier and approval at ANDROID
Refer attachment for details.
Erni Suhaireen Zulkifli
Avatar?id=1966&size=24 10:54 3. System Internal Testing (SIT) Enhancement #11371 (Internal Testing): SIT12-ePFG-To fixed organization field to column 5 digit
Hi Athira,
Please grab the latest installer with name 'PaymentFileGeneratorSetup_20201127' in email and perform te...
Ngoh Chee Onn
Avatar?id=1966&size=24 10:54 3. System Internal Testing (SIT) Enhancement #11371 (Development / Work In Progress): SIT12-ePFG-To fixed organization field to co...
Ngoh Chee Onn
Avatar?id=1966&size=24 10:53 3. System Internal Testing (SIT) Enhancement #11375 (Internal Testing): SIT20-ePFG-To add version
Hi Athira,
Please grab the latest installer with name 'PaymentFileGeneratorSetup_20201127' in email and perform te...
Ngoh Chee Onn
Avatar?id=1966&size=24 10:53 3. System Internal Testing (SIT) Enhancement #11375 (Development / Work In Progress): SIT20-ePFG-To add version
Ngoh Chee Onn
Avatar?id=1966&size=24 10:53 3. System Internal Testing (SIT) Enhancement #11372 (Internal Testing): SIT13-SIT14-SIT18_ePFG-To reposition button
Hi Athira,
Please grab the latest installer with name 'PaymentFileGeneratorSetup_20201127' in email and perform te...
Ngoh Chee Onn
Avatar?id=1966&size=24 10:52 3. System Internal Testing (SIT) Enhancement #11372 (Development / Work In Progress): SIT13-SIT14-SIT18_ePFG-To reposition button
Ngoh Chee Onn
Avatar?id=1966&size=24 10:52 3. System Internal Testing (SIT) Enhancement #11374 (Internal Testing): SIT19-ePFG-To include save "Excel format" in zip file
Hi Athira,
Please grab the latest installer with name 'PaymentFileGeneratorSetup_20201127' in email and perform te...
Ngoh Chee Onn
Avatar?id=1966&size=24 10:52 3. System Internal Testing (SIT) Enhancement #11374 (Development / Work In Progress): SIT19-ePFG-To include save "Excel format" in...
Ngoh Chee Onn
Avatar?id=1966&size=24 10:52 3. System Internal Testing (SIT) Enhancement #11373 (Internal Testing): SIT15_SIT16-ePFG-To re-arrange the details column
Hi Athira,
Please grab the latest installer with name 'PaymentFileGeneratorSetup_20201127' in email and perform te...
Ngoh Chee Onn
Avatar?id=1966&size=24 10:48 3. System Internal Testing (SIT) Enhancement #11373 (Development / Work In Progress): SIT15_SIT16-ePFG-To re-arrange the details c...
Ngoh Chee Onn

November 26, 2020

18:28 0. CDB_Change Request Change #11307 (Development / Work In Progress): [SCP ID :##5602##] : PruBSN new file format >> CR...
Currently EOD does not run PRUBSN.
Please recheck
Erni Suhaireen Zulkifli
11:49 0. CDB_Change Request Task #11336 (Finished Development): To create PruBSN screen at authorization - Android
Added prubsn service code for authorization
SIT https://drive.google.com/file/d/12L5G49dj5_WdmhBhs-5eTJmyKG5j-39m/...
Darren Gee Teik Aun
11:27 0. CDB_Change Request Task #11337 (Work Completed-End life cycle): To create PruBSN screen at authorization - Restful
Tested and passed at SIT Erni Suhaireen Zulkifli
10:39 1. CDB_Phase 2 & 3 Development Task #10108 (Development / Work In Progress): [P1_Extended] : Mobile ANDROID - Update E-statement
Rahmat Aina Nadia

November 25, 2020

13:37 0. CDB_Change Request Change #11250 (System Integration Test): [SCP ID :##5544##] : Add filtering Org Code in IBAM/CDB ...
Nurul Athira Abdul Rahim
13:11 0. CDB_Change Request Change #11003 (Pending Prod Deployment): [CR19003] : To Add New EPF Payment Type (Late Payment & ...
Tested and passed in SIT and UAT
Received UAT Signed Off
Pending date to deploy from JTM
Nurul Athira Abdul Rahim
13:03 0. CDB_Change Request Task #11337 (Internal Testing): To create PruBSN screen at authorization - Restful
Deployed on 25/11/2020 Nurul Athira Abdul Rahim

November 24, 2020

20:17 0. CDB_Change Request Change #11307 (Internal Testing): [SCP ID :##5602##] : PruBSN new file format >> CR20003
Test scenario:
# Access CDB>Auto Credit>File Upload, upload a PruBSN file
# Access CDB>Auto Credit>History Listing,...
Najmi Pasarudin
17:00 3. System Internal Testing (SIT) Enhancement #11371: SIT12-ePFG-To fixed organization field to column 5 digit
Hi chee onn,
As I discuss with Encik Rahmat Bohari, he agreed to go with our second plan which is to keep the orga...
Nurul Athira Abdul Rahim
15:53 0. CDB_Change Request Task #11337 (Pending SIT Deployment): To create PruBSN screen at authorization - Restful
Hasnieza,
Please help to deploy to SIT.
Erni Suhaireen Zulkifli
12:07 1. CDB_Phase 2 & 3 Development Task #10108: [P1_Extended] : Mobile ANDROID - Update E-statement
Hi Aina, kindly continue the development as discuss with Darren.
The due date of this module is 30th of November 2...
Nurul Athira Abdul Rahim
09:43 1. CDB_Phase 2 & 3 Development Task #10424: [P1_Extended] IOS - CDB_Push Notification for authorization
Until now we still cant access FCM web service from Web server ip 10.10.95.121 Aditya Prathama
09:42 0. CDB_Change Request Task #11337 (Internal Testing): To create PruBSN screen at authorization - Restful
@erni i forgot to send u back this. yesterday u test pru bsn ios and success Aditya Prathama

November 23, 2020

12:22 0. CDB_Change Request Task #11339 (Work Completed-End life cycle): To create PruBSN screen at authorization - IOS
Tested and passed for iOS.
PruBSN txn successfully listed at iOS Authorization List and able to approve.
Refer atta...
Erni Suhaireen Zulkifli
12:18 0. CDB_Change Request Change #11307: [SCP ID :##5602##] : PruBSN new file format >> CR20003
Please also recheck on below issue:
After approver approve, PruBSN transaction does not listed at:
1. BSNeBiz Txn...
Erni Suhaireen Zulkifli

November 20, 2020

18:08 1. CDB_Phase 2 & 3 Development Task #10362 (Development / Work In Progress): [P1_Extended] : IBAM - Email Notification for checker
However,
After fully tested again, found that email notification also send to other user that is not related to th...
Erni Suhaireen Zulkifli
14:14 0. CDB_Change Request Change #11250 (Internal Testing): [SCP ID :##5544##] : Add filtering Org Code in IBAM/CDB >> CR20001
SIT deployed on 20/11/2020. Please re-test. Najmi Pasarudin
11:53 1. CDB_Phase 2 & 3 Development Bug #11360 (Work Completed-End life cycle): LHDN_Agent File does not include all transaction in o...
Tested and passed.
Footer successfully displayed the correct value
refer attachment for details
Erni Suhaireen Zulkifli
11:30 1. CDB_Phase 2 & 3 Development Bug #11360 (Internal Testing): LHDN_Agent File does not include all transaction in one org code.
Hi Erni.
total record counter at agent file footer has been updated. Kindly retest.
Nurul Hasnieza Bt Mohd Zamri

November 19, 2020

17:28 0. CDB_Change Request Change #11338 (Development / Work In Progress): [SCP ID :##5559##] : CR20002-Daily balance summar...
Waiting for restful Nur Syamili Abdul Majid
17:22 1. CDB_Phase 2 & 3 Development Task #10107 (Development / Work In Progress): [P1_Extended] : Mobile IOS - Update E-statement
Nur Syamili Abdul Majid
17:21 Internal Testing - CDB Bug #9698 (Finished Development): Mobile_iOS_Field and error message correction for Payment
Nur Syamili Abdul Majid
17:17 5. Training Compilation Issue Bug #10231 (Finished Development): Mobile_IOS_Camera GUI
Nur Syamili Abdul Majid
16:10 0. CDB_Change Request Task #11339 (Internal Testing): To create PruBSN screen at authorization - IOS
Done with the integration code part. Waiting to be tested by Adit. Nur Syamili Abdul Majid
15:15 0. CDB_Change Request Change #11335 (Development / Work In Progress): [SCP ID :##5559##] : CR20002-Daily balance summar...
pending Middle Service working on progress Aditya Prathama
15:14 0. CDB_Change Request Task #11337 (Pending Integration): To create PruBSN screen at authorization - Restful
after checked on restful source code. current source code already have PRUBSN to shown. Aditya Prathama
14:41 0. CDB_Change Request Task #11339 (Development / Work In Progress): To create PruBSN screen at authorization - IOS
Nur Syamili Abdul Majid

November 18, 2020

12:06 3. System Internal Testing (SIT) Enhancement #11375 (Closed - End of life cycle): SIT20-ePFG-To add version
To include version count at copyright note below.
Sample :
"Copyright ©Penril Datability(M) Sdn Bhd. All Rights...
Nurul Athira Abdul Rahim
11:54 3. System Internal Testing (SIT) Enhancement #11372: SIT13-SIT14-SIT18_ePFG-To reposition button
Hi Chee Onn, Please take note below remark :
*Amendment for browse button*
Dont edit the browse button name, ju...
Nurul Athira Abdul Rahim

November 17, 2020

02:32 3. System Internal Testing (SIT) Enhancement #11374 (Closed - End of life cycle): SIT19-ePFG-To include save "Excel format" in zip...
To include save "Excel format" in zip file and remove "Save as excel" button
Currently : System separate the excel...
Nurul Athira Abdul Rahim
02:23 3. System Internal Testing (SIT) Enhancement #11373 (Closed - End of life cycle): SIT15_SIT16-ePFG-To re-arrange the details column
*To reposition BP 800 column :*
# Customer acc no
# Customer Name
# Amount
# Ref number (Set to not mandatory)
#...
Nurul Athira Abdul Rahim
02:17 3. System Internal Testing (SIT) Enhancement #11372 (Closed - End of life cycle): SIT13-SIT14-SIT18_ePFG-To reposition button
1. To reposition "Browse" button and amend the button name to
"Open existing Data file"
2. To reposition "Add" "...
Nurul Athira Abdul Rahim
02:06 3. System Internal Testing (SIT) Enhancement #11371 (Closed - End of life cycle): SIT12-ePFG-To fixed organization field to column...
To fixed organization field to 5 digit characters only.
example : N4986
Currently system allow 8 characters inclu...
Nurul Athira Abdul Rahim
01:57 3. System Internal Testing (SIT) Bug #11018 (Work Completed-End life cycle): SIT10-ePFG-To allow special character at field Name
27/08/20 - Tested and passed by Azyan Nurul Athira Abdul Rahim
01:56 3. System Internal Testing (SIT) Task #11007 (Work Completed-End life cycle): SIT05-ePFG-To include java package inside ePFG insta...
Tested and success on 24/7/2020 by Firas Nurul Athira Abdul Rahim
01:56 3. System Internal Testing (SIT) Enhancement #11006 (Work Completed-End life cycle): SIT04-ePFG-Make screen responsive
27/10/2020 - Tested and passed by Azyan Nurul Athira Abdul Rahim
01:55 3. System Internal Testing (SIT) Enhancement #11008 (Work Completed-End life cycle): SIT06-ePFG-To put validation on empty data
Tested and passed by Amira Nurul Athira Abdul Rahim
01:54 3. System Internal Testing (SIT) Enhancement #11016 (Work Completed-End life cycle): SIT11-ePFG-To change the save folder
Tested and passed by azyan Nurul Athira Abdul Rahim
01:54 3. System Internal Testing (SIT) Bug #11030 (Work Completed-End life cycle): SIT09-ePFG-System does not verify the service type is...
tested and passed by firas Nurul Athira Abdul Rahim
01:53 3. System Internal Testing (SIT) Bug #11036 (Work Completed-End life cycle): SIT07-ePFG- In the enrollment screen the org code was...
Nurul Athira Abdul Rahim
01:52 1. CDB_Phase 2 & 3 Development Task #9803 (User Acceptance Test): [P1_Extended] : To develop BOLT module which allow CDB User to...
Nurul Athira Abdul Rahim
01:51 3. System Internal Testing (SIT) Bug #11041 (Work Completed-End life cycle): SIT08-ePFG- System prompt incorect file type
Nurul Athira Abdul Rahim
00:48 0. CDB_Change Request Change #11250 (Development / Work In Progress): [SCP ID :##5544##] : Add filtering Org Code in IB...
Hi Najmi, Kindly fix below issue
*Module Functionality*
*Setting : Admin tick "Yes" to allow assign org code
O...
Nurul Athira Abdul Rahim
11:25 0. CDB_Change Request Change #11250 (Internal Testing): [SCP ID :##5544##] : Add filtering Org Code in IBAM/CDB >> CR20001
Hi Athira,
done SIT deployment. Kindly retest.
Nurul Hasnieza Bt Mohd Zamri
10:34 1. CDB_Phase 2 & 3 Development Task #10362 (Internal Testing): [P1_Extended] : IBAM - Email Notification for checker
Nurul Athira Abdul Rahim
09:35 0. CDB_Change Request Change #11307 (Development / Work In Progress): [SCP ID :##5602##] : PruBSN new file format >> CR...
Najmi Pasarudin
09:34 0. CDB_Change Request Change #11250 (Pending SIT Deployment): [SCP ID :##5544##] : Add filtering Org Code in IBAM/CDB >...
Hi Nieza,
Please deploy to SIT.
Najmi Pasarudin

November 16, 2020

15:47 0. CDB_Change Request Task #11336: To create PruBSN screen at authorization - Android
Hi Darren,
Attached file is the result screen for PRUBSN (Upload File). You may refer the screen for PruBSN mobil...
Nurul Athira Abdul Rahim
15:41 0. CDB_Change Request Task #11339: To create PruBSN screen at authorization - IOS
Hi Syamili,
Attached file is the result screen for PRUBSN. You may refer the screen for PruBSN mobile authorizati...
Nurul Athira Abdul Rahim
13:39 1. CDB_Phase 2 & 3 Development Task #10107: [P1_Extended] : Mobile IOS - Update E-statement
Hi erni,
I think for this one, waiting restful from adit. And then I'll finish the integration part
Nur Syamili Abdul Majid
11:56 1. CDB_Phase 2 & 3 Development Task #10108: [P1_Extended] : Mobile ANDROID - Update E-statement
Hi Darren,
Please update latest progress on this issue.
Erni Suhaireen Zulkifli
11:55 1. CDB_Phase 2 & 3 Development Task #10107: [P1_Extended] : Mobile IOS - Update E-statement
Hi Mili,
Please update latest progress on this issue.
Erni Suhaireen Zulkifli
11:49 1. CDB_Phase 2 & 3 Development Bug #11366: LHDN_Error at total count at "Total No of Records"
Path: IBAM > File Enquiry > View Details
Current Result: "Total Number of Record" display value PCB + CP38
Expe...
Erni Suhaireen Zulkifli
11:48 1. CDB_Phase 2 & 3 Development Bug #11366 (Work Completed-End life cycle): LHDN_Error at total count at "Total No of Records"
Erni Suhaireen Zulkifli
11:42 1. CDB_Phase 2 & 3 Development Bug #11360 (Development / Work In Progress): LHDN_Agent File does not include all transaction in ...
Issue reported by Azyan:
Error total record count at footer.
Kindly recheck and fix for this issue.
Erni Suhaireen Zulkifli
 