July 11, 2013

18:03 3.BIB Bug #2456 (Internal Testing): BIB : Login as an Initiator - Functionality
Amended Error message for Exceed max. error attempt during login. Alwi Husada
17:43 1.IBAM Task #3248 (Internal Testing): IBAM>User Profile Maintenance
Added action ID. Alwi Husada
17:42 1.IBAM Task #3248 (Finished Development): IBAM>User Profile Maintenance
Alwi Husada
16:26 1.IBAM Bug #2032 (Work Completed-End life cycle): IBAM>BIB: BIB Navigation - View & Edit Navigation & Na...
Siti Norahayu Mohd Desa
16:18 1.IBAM Bug #1993 (Internal Testing): IBAM>IBAM: Content>Product Type
Norhaidah Md Dasuki
14:06 1.IBAM Task #3248 (Work Completed-End life cycle): IBAM>User Profile Maintenance
Hi Alwi,
Kindly assist on adding the Action Permission checkbox for BIB>Account Management.This is for allowing us...
Lizahwati Basirun
13:36 3.BIB Bug #2456 (Finished Development): BIB : Login as an Initiator - Functionality
Alwi Husada
13:30 Bug #3001 (Work Completed-End life cycle): [Phase 2] IBAM : IRIB
Tested and passed. Lizahwati Basirun
13:21 3.BIB Bug #3246 (Work Completed-End life cycle): BIB : Message Box > Unread Message Flag
*Unread Message counter not tally with the new message in INBOX*
+Step to reproduce+
+Step 1+
# Delete NEW mes...
Siti Norahayu Mohd Desa
13:02 1.IBAM Change #3072 (Internal Testing): IBAM>Content>Notices
just push the code. Syahrul Anwar
11:42 1.IBAM Bug #3133 (Development / Work In Progress): IBAM>IBAM : Content - Interbank
Syahrul,
*kindly assist to solve the BUG.*
*Still there is the same issue.*
*Step to re-produce:*
# Click on ...
Hosseiny Elham
11:35 3.BIB Bug #2456 (Development / Work In Progress): BIB : Login as an Initiator - Functionality
Salam Alwi,
From the internal testing here the test result:
# Test Case# 2.2.1 - *PASSED*
# Test Case# 2.2.2 -...
Lizahwati Basirun
11:29 1.IBAM Change #3205 (Work Completed-End life cycle): Authorization - Approval
Fixed and retested succesfully Hosseiny Elham
11:22 3.BIB Task #2481 (Work Completed-End life cycle): [Phase 2] BIB : Login as Viewer
Completed. Tested and passed. Lizahwati Basirun
11:15 3.BIB Bug #2530 (Work Completed-End life cycle): BIB : Login as Viewer (Access Module)
Completed. Tested and passed. Lizahwati Basirun
11:10 1.IBAM Change #3072 (Development / Work In Progress): IBAM>Content>Notices
+*Test Result*+
+Create & Edit Notices Content+
To move LABEL to top NOT re-order the field position. TQ
Siti Norahayu Mohd Desa
11:08 3.BIB Task #2464 (Work Completed-End life cycle): [Phase 2] BIB : First Time Login - Viewer
Completed. Tested and passed. Lizahwati Basirun
11:00 3.BIB Bug #2505 (Work Completed-End life cycle): BIB : Login as Single User - Functionality
Tested and passed. Lizahwati Basirun
10:59 3.BIB Bug #2465 (Work Completed-End life cycle): BIB : FTL - Viewer (Functionality)
Successfully tested. Lizahwati Basirun
10:59 1.IBAM Task #2267 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Activate
Sub Module Activate has been completed for Internal Testing Siti Norahayu Mohd Desa
10:58 1.IBAM Task #2268 (Development / Work In Progress): IBAM >IBAM : User Profile Maintenance - Delete
Siti Norahayu Mohd Desa
10:55 3.BIB Task #2448 (Work Completed-End life cycle): [Phase 2] BIB : First time login - Approver
Completed testing and passed. Lizahwati Basirun
10:54 1.IBAM Task #2268 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Delete
Siti Norahayu Mohd Desa
10:53 1.IBAM Task #2269 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Create
Sub Module Create has been completed for Internal Testing Siti Norahayu Mohd Desa
10:52 1.IBAM Task #2266 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Suspend
Sub Module Suspend has been completed for Internal Testing Siti Norahayu Mohd Desa
10:46 1.IBAM Change #3209: IBAM >IBAM : User Profile Maintenance - Authorization > Edit User Profile
Please refer attachment for more information. Siti Norahayu Mohd Desa
10:39 1.IBAM Task #1860: [Phase2] IBAM: Authorization
pending for the 2210 Hosseiny Elham
10:36 1.IBAM Bug #2210 (Development / Work In Progress): [Phase2] IBAM: Authorization
Anuwar,
kindly assist to solve the Bug.
*login by maker.*
* After doingg any change and Edit the Item . by maker...
Hosseiny Elham
10:35 1.IBAM Bug #3216 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Authorization ...
Tested & Passed. User can be unlocked. Siti Norahayu Mohd Desa
09:59 3.BIB Bug #2449 (Work Completed-End life cycle): BIB : FTL - Approver (Functionality)
Tested and passed. Lizahwati Basirun

July 10, 2013

17:51 2.RIB Bug #2994: [Phase 2] RIB: Fund Transfer and Bill Payment - Maintenance
Hi Anwar,
Kindly assist. TQ
Siti Norahayu Mohd Desa
17:48 1.IBAM Change #3125 (Work Completed-End life cycle): [Phase 2] Maintenance : Message Box
Tested & Passed. TQ Siti Norahayu Mohd Desa
17:45 1.IBAM Change #3209 (Development / Work In Progress): IBAM >IBAM : User Profile Maintenance - Authorizat...
+*Test Result*+
+*Pending List & Approval List*+
# To change description from Update User Profile to Edit User Pr...
Siti Norahayu Mohd Desa
17:39 3.BIB Bug #3236 (Work Completed-End life cycle): BIB > Account & Banking - Quicklink
Hi Alwi,
Kindly assist on the "Session Expired" issue.
*Step to re-produce:*
Login as Single User/Initiator
...
Lizahwati Basirun
17:36 1.IBAM Change #3213 (Development / Work In Progress): IBAM >IBAM : User Profile Maintenance - Authorizat...
*+Test Result+*
+User Transaction Log - Details+
Before State & After State for delete User Name display same val...
Siti Norahayu Mohd Desa
17:28 1.IBAM Bug #3133: IBAM>IBAM : Content - Interbank
Hi Alwi,
Is it the issue ready to be test?
If yes, please assign to Elham to do so.
TQ.
Siti Norahayu Mohd Desa
17:26 1.IBAM Bug #3171 (Development / Work In Progress): [Phase 2] Maintenance : Message Box - Date Picker (Ex...
+*Test Result*+
*To add validation for Expiry Date to be required for Filter by criteria.*
+Step to reproduce+
...
Siti Norahayu Mohd Desa
17:16 1.IBAM Bug #3214 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Create
Tested & Passed. TQ Siti Norahayu Mohd Desa
17:12 1.IBAM Bug #3175 (Work Completed-End life cycle): IBAM>AUTHORIZATION
Tested & Passed. TQ Siti Norahayu Mohd Desa
17:09 1.IBAM Bug #3133 (Internal Testing): IBAM>IBAM : Content - Interbank
Syahrul Anwar
17:06 1.IBAM Task #3219 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Reset Password
Sub Module Reset Password has been completed for Internal Testing Siti Norahayu Mohd Desa
16:59 1.IBAM Change #3072 (Internal Testing): IBAM>Content>Notices
done Syahrul Anwar
16:57 1.IBAM Bug #3221 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Authorization ...
Tested & Passed Siti Norahayu Mohd Desa
16:52 1.IBAM Bug #3177 (Development / Work In Progress): IBAM>BIB : Company Enquiry - User Maintenance (Edit C...
HI Ikh,
h1. Tested & Failed.
*Enter Tel No 9 digits*
*Actual Result :*
Tel No cannot be less than 10 dig...
Siti Norahayu Mohd Desa
16:51 1.IBAM Bug #3234: IBAM>BIB: Company Enquiry - View, Create & Edit Company Details
Syahrul,
please help to solve this issue.
Hosseiny Elham
16:48 1.IBAM Bug #3234 (Work Completed-End life cycle): IBAM>BIB: Company Enquiry - View, Create & Edit Compan...
Anwar,
*please assist to solve the Bug , thanks.*
*Test Company Enquiry - View, Create & Edit Company Details.*...
Hosseiny Elham
16:32 1.IBAM Bug #2228 (Work Completed-End life cycle): [Phase2] IBAM>BIB: Company Enquiry - View, Create & Ed...

Fixed and retested successfully.
Hosseiny Elham
16:15 1.IBAM Change #2245 (Development / Work In Progress): IBAM>Maker Checker Maintenance - Screen Flow and S...
Anwar,
Kindly assist to slove this bug.
*Test IBAM - Maker Checker Maintenance* **
please
change Max lenght 7 t...
Hosseiny Elham
16:07 1.IBAM Bug #2032 (Internal Testing): IBAM>BIB: BIB Navigation - View & Edit Navigation & Navigable Services
Anwar Khairul
16:06 1.IBAM Bug #2032 (Finished Development): IBAM>BIB: BIB Navigation - View & Edit Navigation & Navigable S...
All requested changes has been made. Anwar Khairul
16:04 1.IBAM Bug #3175 (Internal Testing): IBAM>AUTHORIZATION
Anwar Khairul
16:02 1.IBAM Bug #3171 (Internal Testing): [Phase 2] Maintenance : Message Box - Date Picker (Expiry Date)
Anwar Khairul
15:53 1.IBAM Change #3125 (Internal Testing): [Phase 2] Maintenance : Message Box
Anwar Khairul
15:52 1.IBAM Change #3205 (Internal Testing): Authorization - Approval
Anwar Khairul
15:51 1.IBAM Change #3213 (Internal Testing): IBAM >IBAM : User Profile Maintenance - Authorization > Delete U...
Anwar Khairul
15:51 3.BIB Bug #2737 (Internal Testing): BIB – User Maintenance – Edit User
Anwar Khairul
15:50 1.IBAM Bug #3221 (Internal Testing): IBAM >IBAM : User Profile Maintenance - Authorization > Reset Password
Anwar Khairul
15:50 1.IBAM Bug #2228 (Internal Testing): [Phase2] IBAM>BIB: Company Enquiry - View, Create & Edit Company De...
Anwar Khairul
15:49 1.IBAM Bug #2210 (Internal Testing): [Phase2] IBAM: Authorization
Anwar Khairul
15:49 1.IBAM Change #3209 (Internal Testing): IBAM >IBAM : User Profile Maintenance - Authorization > Edit Use...
Anwar Khairul
15:48 1.IBAM Bug #3214 (Internal Testing): IBAM >IBAM : User Profile Maintenance - Create
Anwar Khairul
14:39 1.IBAM Task #1855 (Work Completed-End life cycle): [Phase2] IBAM>BIB: BIB User Activity Log

Fixed and retested successfully.
Hosseiny Elham
14:29 1.IBAM Bug #2160 (Work Completed-End life cycle): [Phase2] IBAM>BIB: BIB User Activity Log
Fixed and retested succesfully. Hosseiny Elham
13:56 1.IBAM Bug #2022 (Work Completed-End life cycle): IBAM>BIB: Company Enquiry - View, Create & Edit Compan...

Fixed and retested successfully.
Hosseiny Elham
13:16 1.IBAM Bug #2210 (Finished Development): [Phase2] IBAM: Authorization
Requested changes has been made. Anwar Khairul
13:15 1.IBAM Bug #2228 (Finished Development): [Phase2] IBAM>BIB: Company Enquiry - View, Create & Edit Compan...
Requested changes has been made. Anwar Khairul
13:05 1.IBAM Bug #3133: IBAM>IBAM : Content - Interbank
Hi Syahrul,
Kindly assist.
Siti Norahayu Mohd Desa
13:00 1.IBAM Bug #2943 (Development / Work In Progress): [Phase2] IBAM>BIB: BIB Navigation - View & Edit Navig...

screen shot has been attached.
Hosseiny Elham
12:51 1.IBAM Bug #2920 (Work Completed-End life cycle): Phase2BIB:SIT IBAM - Maintenance - Change Own Password

Fixed and retested succesfully.
Hosseiny Elham
12:50 1.IBAM Bug #2210: [Phase2] IBAM: Authorization
Hi Anwar,
Kindly assist.
Siti Norahayu Mohd Desa
12:49 1.IBAM Bug #2160 (Finished Development): [Phase2] IBAM>BIB: BIB User Activity Log
Changes requested has been made. Anwar Khairul
12:36 1.IBAM Bug #2623 (Work Completed-End life cycle): [Phase2] IBAM>RIB: RIB User Enquiry
fixed and retested succesfully. Hosseiny Elham
12:33 1.IBAM Bug #2228 (Development / Work In Progress): [Phase2] IBAM>BIB: Company Enquiry - View, Create & E...
Hi Anwar,
kindly assist to solve the bug, thanks.
*Step to reproduce*
# Click on BIB
# Click on Compant Enqui...
Hosseiny Elham
12:32 1.IBAM Bug #3221 (Finished Development): IBAM >IBAM : User Profile Maintenance - Authorization > Reset P...
1. Page throw System unavailable after Checker approve the transaction.
- No issue found when approved with remarks....
Anwar Khairul
12:29 1.IBAM Bug #2920: Phase2BIB:SIT IBAM - Maintenance - Change Own Password
Hi Ting Wei,
Kindly assist. TQ.
Siti Norahayu Mohd Desa
12:28 1.IBAM Bug #2943: [Phase2] IBAM>BIB: BIB Navigation - View & Edit Navigation & Navigable Services
Hi Syahrul,
Kindly assist. TQ
Siti Norahayu Mohd Desa
12:13 1.IBAM Bug #1993: IBAM>IBAM: Content>Product Type
Hi Ting Wei,
Kindly assist.
Siti Norahayu Mohd Desa
12:10 1.IBAM Change #3209 (Finished Development): IBAM >IBAM : User Profile Maintenance - Authorization > Edit...
All requested changes has been made. Anwar Khairul
12:05 1.IBAM Bug #3214 (Finished Development): IBAM >IBAM : User Profile Maintenance - Create
All requested changes has been made. Anwar Khairul
11:34 3.BIB Bug #2737 (Finished Development): BIB – User Maintenance – Edit User
All requested changes has been made. Anwar Khairul
10:45 3.BIB Bug #2737: BIB – User Maintenance – Edit User
Hi Lizah & Anwar
For phone number, I've already assigned Ikhmatiar to fix it. Pending for deployment.
Please take ...
Siti Norahayu Mohd Desa
10:36 3.BIB Bug #2737 (Development / Work In Progress): BIB – User Maintenance – Edit User
Hi Anwar,
*IB Service Administration*
+*Create User*+
*1) Tel No.*
Enter south area phone no. "063876680"
...
Lizahwati Basirun
10:07 1.IBAM Bug #2022: IBAM>BIB: Company Enquiry - View, Create & Edit Company Details
Hi Elham,
Kindly check if the error still persist, if not the issue can be closed. TQ.
Siti Norahayu Mohd Desa
09:38 1.IBAM Change #3213 (Finished Development): IBAM >IBAM : User Profile Maintenance - Authorization > Dele...
All changes completed as per request Anwar Khairul
09:35 3.BIB Task #2513 (Pending Review): BIB : Account Enquiry - Account Details (Single User)
Hi Kak Haida, all pending issues are retested and fixed. Attached is the latest module test checklist for this module. Ting Wei Gan

July 09, 2013

19:03 3.BIB Bug #2737 (Internal Testing): BIB – User Maintenance – Edit User
Alwi Husada
19:02 1.IBAM Bug #2022 (Internal Testing): IBAM>BIB: Company Enquiry - View, Create & Edit Company Details
Hi Elham,
this happened before finish the integration, during that time when the company was created was not using...
Alwi Husada
18:59 1.IBAM Bug #3177 (Internal Testing): IBAM>BIB : Company Enquiry - User Maintenance (Edit CA User)
Sibghotulloh Ikhmatiar
18:58 1.IBAM Bug #3177: IBAM>BIB : Company Enquiry - User Maintenance (Edit CA User)
Resolution: Added Validation for every Tel No.(except extension no.) with:
1. Min Length 9 digits
2. Max Length 10 ...
Sibghotulloh Ikhmatiar
18:34 1.IBAM Bug #3216 (Finished Development): IBAM >IBAM : User Profile Maintenance - Authorization > Unlock
passed invalid parameter to upass API, should pass user alias instead of user name. Alwi Husada
18:26 1.IBAM Bug #1888 (Internal Testing): IBAM>IBAM: Upass Maintenance
Re-test on this issue. Alwi Husada
18:00 1.IBAM Bug #3221 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Authorization ...
*1. Page throw System unavailable after Checker approve the transaction.*
+Step to re-produce+
# Login as Maker ...
Siti Norahayu Mohd Desa
17:54 1.IBAM Task #3219 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Reset Password
To test on functionality to Reset User Profile Password Siti Norahayu Mohd Desa
17:49 1.IBAM Change #3205 (Finished Development): Authorization - Approval
Removed. Completed. Anwar Khairul
17:49 2.RIB Bug #2994 (Development / Work In Progress): [Phase 2] RIB: Fund Transfer and Bill Payment - Maint...
+*Test Result*+
*1. Delete 3rd Party Favorite - Reset Bean for TAC & check box*
_RIB > Fund Transfer > 3rd Part...
Siti Norahayu Mohd Desa
17:40 2.RIB Bug #3172 (Work Completed-End life cycle): [Phase 2] RIB: Fund Transfer - Favourite Interbank Mai...
Tested & Passed. Siti Norahayu Mohd Desa
17:31 1.IBAM Change #3072 (Development / Work In Progress): IBAM>Content>Notices
Kindly assist to change the Title & Abstract (EN) label to the top. TQ Siti Norahayu Mohd Desa
17:26 1.IBAM Bug #1993: IBAM>IBAM: Content>Product Type
Hi Kartono,
Kindly assist to update on the issue. TQ
Siti Norahayu Mohd Desa
17:18 1.IBAM Bug #2022: IBAM>BIB: Company Enquiry - View, Create & Edit Company Details
Hi Elham,
Please follow up the issue closely. TQ
Siti Norahayu Mohd Desa
17:13 1.IBAM Bug #2032: IBAM>BIB: BIB Navigation - View & Edit Navigation & Navigable Services
Hi Anwar,
Kindly assist. TQ
Siti Norahayu Mohd Desa
17:10 1.IBAM Bug #2160: [Phase2] IBAM>BIB: BIB User Activity Log
Hi Anwar,
Kindly assist.
Siti Norahayu Mohd Desa
17:06 1.IBAM Bug #2162: IBAM>IBAM : Content > Payee > Content List
Hi Kartono,
Kindly update on this issue. TQ
Siti Norahayu Mohd Desa
17:05 1.IBAM Bug #2459: BIB: BIB Transaction Enquiry
Hi Alwi,
Kindly update on the issue.
Hi Elham,
Please follow up the issue.
Siti Norahayu Mohd Desa
17:03 1.IBAM Bug #2228: [Phase2] IBAM>BIB: Company Enquiry - View, Create & Edit Company Details
Hi Elham,
What is the issue progress?
Kindly provide the step on how to reproduce and actual/expected issue for...
Siti Norahayu Mohd Desa
17:00 1.IBAM Change #3125 (Finished Development): [Phase 2] Maintenance : Message Box
To rename User Name column at Search Recipient result to be Name only.
- Change the column title to Name at Search R...
Anwar Khairul
16:57 1.IBAM Bug #2917 (Dropped-End of life cycle): IBAM>Message Box
Norhaidah Md Dasuki
16:57 1.IBAM Bug #2915: IBAM>IBAM: Content>Product Type
Hi Kartono,
Kindly update on this issue. TQ
Siti Norahayu Mohd Desa
16:54 1.IBAM Bug #2917: IBAM>Message Box
Issue have been dropped due to Subject Maintenance was not needed. TQ
Hi Kak Haida,
Kindly assist to dropped the...
Siti Norahayu Mohd Desa
16:51 1.IBAM Bug #2920: Phase2BIB:SIT IBAM - Maintenance - Change Own Password
Hi Kartono,
Kindly update on this issue. TQ
Siti Norahayu Mohd Desa
16:49 1.IBAM Bug #2943: [Phase2] IBAM>BIB: BIB Navigation - View & Edit Navigation & Navigable Services
Hi Kartono,
Kindly update on the issue reported.
Siti Norahayu Mohd Desa
16:48 1.IBAM Bug #1888: IBAM>IBAM: Upass Maintenance
Hi Alwi,
Kindly update on the status. TQ
Siti Norahayu Mohd Desa
16:44 1.IBAM Bug #3177 (Development / Work In Progress): IBAM>BIB : Company Enquiry - User Maintenance (Edit C...
+*Test Result*+
# Change Validation for Tel No.
* Min Length 9 digits
* Max Length 10 digits
Hi Ikh,
Please...
Siti Norahayu Mohd Desa
16:26 1.IBAM Task #2267: IBAM >IBAM : User Profile Maintenance - Activate
Pending for Anwar to change on the Authorization description.
Refer issue #3209
Siti Norahayu Mohd Desa
16:26 1.IBAM Task #2266: IBAM >IBAM : User Profile Maintenance - Suspend
Pending for Anwar to change on the Authorization description.
Refer issue #3209
Siti Norahayu Mohd Desa
16:25 1.IBAM Task #2265: IBAM >IBAM : User Profile Maintenance - Unlock
Pending for Anwar to chnage on the Authorization description.
Refer issue #3209
Siti Norahayu Mohd Desa
16:23 1.IBAM Bug #3216 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Authorization ...
*Unable to Approve LOCKED user. System throw "System not ready"*
+Step to re-produce+
# Login as Maker and unlock...
Siti Norahayu Mohd Desa
16:16 1.IBAM Change #3209: IBAM >IBAM : User Profile Maintenance - Authorization > Edit User Profile
Hi Anwar,
Kindly change for below action as well. TQ
* Activate
* Suspend
* Unlock
Siti Norahayu Mohd Desa
16:11 1.IBAM Bug #3171 (Finished Development): [Phase 2] Maintenance : Message Box - Date Picker (Expiry Date)
Add reset end date when back button pressed. Completed. Anwar Khairul
16:07 1.IBAM Bug #3215 (Work Completed-End life cycle): IBAM>NOTICES
Alwi,
*Kindly assist to solve this bug.*
*Step to reproduce:*
# Click on IBAM
# Click on Contetn
# Select Noti...
Hosseiny Elham
15:52 1.IBAM Bug #3175 (Finished Development): IBAM>AUTHORIZATION
Remove as requested. Completed Anwar Khairul
15:49 3.BIB Bug #2687 (Finished Development): BIB : Account Enquiry - Account Details - Single User (Functio...
Header added in the downloaded CSV and text file. Bug fixed. Ting Wei Gan
15:41 1.IBAM Bug #3214 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Create
# *New User Creation, User Status display as NORMAL instead of NEW.*
# *Press Enter to Create Confirmation Page*
...
Siti Norahayu Mohd Desa
15:32 1.IBAM Change #3213 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Authorizati...
+*Pending List & Approval List*+
# To change description from Delete Administrator to Delete User Profile
+*User ...
Siti Norahayu Mohd Desa
15:17 1.IBAM Change #3209 (Work Completed-End life cycle): IBAM >IBAM : User Profile Maintenance - Authorizati...
+*Pending List & Approval List*+
# To change description from Update Administrator Profile to Edit User Profile
...
Siti Norahayu Mohd Desa
14:57 1.IBAM Change #3205 (Work Completed-End life cycle): Authorization - Approval
*Anwar,*
*Kindly assist to change these .*
*Step one to re - produce:*
# 1. click on IBAM.
# 2. Click on Appr...
Hosseiny Elham
14:56 1.IBAM Change #3125: [Phase 2] Maintenance : Message Box
Hi Anwar,
Kindly assist. Thanx a lot.
Siti Norahayu Mohd Desa
14:53 1.IBAM Bug #3171: [Phase 2] Maintenance : Message Box - Date Picker (Expiry Date)
Hi Anwar,
Kindly assist. TQ
Siti Norahayu Mohd Desa
14:33 1.IBAM Bug #3126 (Work Completed-End life cycle): [Phase 2] Maintenance : Message Box
Tested & Passed. TQ Siti Norahayu Mohd Desa
12:28 2.RIB Bug #2997 (Work Completed-End life cycle): [Phase 2] RIB: Message Box
Noted with thanks. Issue Closed. Siti Norahayu Mohd Desa
12:19 1.IBAM Bug #3175 (Development / Work In Progress): IBAM>AUTHORIZATION
+*Test Result:*+
*Description For IBAM Pending & IBAM Authorization Approval List table*
To remove Education L...
Siti Norahayu Mohd Desa
11:51 2.RIB Bug #2995: [Phase 2] RIB : Block ATM Card (Navigation)
Hi Anwar,
Kindly assist.
Note: I think the error occurred because of the user CIF. please investigate. TQ
Siti Norahayu Mohd Desa
11:08 3.BIB Bug #2737 (Finished Development): BIB – User Maintenance – Edit User
root cause: Invalid formBean.
resolution : Use valid formBean.
Alwi Husada
10:59 2.RIB Bug #2994 (Internal Testing): [Phase 2] RIB: Fund Transfer and Bill Payment - Maintenance
Change "Go Back" button label to "Back" Alwi Husada
10:24 2.RIB Change #3128 (Work Completed-End life cycle): [Phase 2] RIB: FT > Own Account Transfer - Own acco...
Tested & Passed. TQ Siti Norahayu Mohd Desa
09:45 3.BIB Change #3080 (Finished Development): BIB : Print Receipt button (Change to Download as PDF)
Changed back to "Print Receipt". Ting Wei Gan
09:33 1.IBAM Change #2245 (Internal Testing): IBAM>Maker Checker Maintenance - Screen Flow and Specification R...
Anwar Khairul
09:33 2.RIB Change #3128 (Internal Testing): [Phase 2] RIB: FT > Own Account Transfer - Own account transfer ...
Anwar Khairul
09:32 3.BIB Bug #2687 (Internal Testing): BIB : Account Enquiry - Account Details - Single User (Functionality)
Anwar Khairul

July 08, 2013

18:35 1.IBAM Bug #3126: [Phase 2] Maintenance : Message Box
Salam Kak haida,
Kindly assist to change the Status to Internal testing in order to update this issue. TQ
Siti Norahayu Mohd Desa
18:14 1.IBAM Change #3131 (Work Completed-End life cycle): [Phase 2] Maintenance : Msg Box > Send New Notifica...
Tested & Passed. TQ Siti Norahayu Mohd Desa
18:10 1.IBAM Bug #3171 (Development / Work In Progress): [Phase 2] Maintenance : Message Box - Date Picker (Ex...
+*Test Result*+
*Reset Bean for Expiry Date.*
+Step to reproduce+
_Maintenance > Message Box > Notification >...
Siti Norahayu Mohd Desa
17:20 3.BIB Enhancement #2822 (Work Completed-End life cycle): BIB - Corporate Admin - Enhancement on Create ...
Tested & Passed Siti Norahayu Mohd Desa
17:17 3.BIB Bug #3155 (Work Completed-End life cycle): BIB : Message Box - Restore
Tested & Passed. Siti Norahayu Mohd Desa
16:35 3.BIB Bug #2687 (Finished Development): BIB : Account Enquiry - Account Details - Single User (Functio...
Completed. Anwar Khairul
16:23 3.BIB Bug #3192 (Closed - End of life cycle): BIB031 - Add 3rd Party Beneficiary
The issue already fixed by Kahyan.
*Step to re-produce:*
BIB>Beneficiary 3rd Party Account Maintenance
# Key in ...
Lizahwati Basirun
16:14 3.BIB Bug #2687 (Development / Work In Progress): BIB : Account Enquiry - Account Details - Single Use...
Alwi Husada
15:56 3.BIB Bug #2838 (Development / Work In Progress): BIB : User Maintenance - Edit User (Change Max Length...
+*Test Result:*+
1. *To change validation for Tel No :-*
* Min Length - 9 digits
* Max Length - 10 digits
...
Siti Norahayu Mohd Desa
14:54 2.RIB Change #3128 (Finished Development): [Phase 2] RIB: FT > Own Account Transfer - Own account trans...
Completed. Anwar Khairul
14:04 1.IBAM Change #2245 (Finished Development): IBAM>Maker Checker Maintenance - Screen Flow and Specificati...
Completed Anwar Khairul
13:17 3.BIB Bug #3155 (Internal Testing): BIB : Message Box - Restore
Sibghotulloh Ikhmatiar
13:15 3.BIB Bug #3155 (Finished Development): BIB : Message Box - Restore
root of issue: no new flag message checking at front-end level.
resolution: added new flag message checking on it.
Sibghotulloh Ikhmatiar
13:15 3.BIB Change #3080 (Development / Work In Progress): BIB : Print Receipt button (Change to Download as ...
Hi Lizah,
I have been informed, the label is remain as "Print Receipt" instead of Download as PDF.
Hi Ting We...
Siti Norahayu Mohd Desa
13:08 3.BIB Change #3080 (Work Completed-End life cycle): BIB : Print Receipt button (Change to Download as PDF)
Siti Norahayu Mohd Desa
13:06 3.BIB Change #3080: BIB : Print Receipt button (Change to Download as PDF)
Tested & Passed. Siti Norahayu Mohd Desa
13:01 3.BIB Change #3137 (Work Completed-End life cycle): BIB : Message Box - Wrap Text
Tested & Passed. Siti Norahayu Mohd Desa
11:40 1.IBAM Bug #3175 (Internal Testing): IBAM>AUTHORIZATION
All Completed Anwar Khairul

July 06, 2013

12:58 3.BIB Change #3137 (Internal Testing): BIB : Message Box - Wrap Text
Sibghotulloh Ikhmatiar
12:58 3.BIB Change #3137 (Finished Development): BIB : Message Box - Wrap Text
root of issue: no text wrap function at front-end level design.
resolution: added text wrap at front-end level.
Sibghotulloh Ikhmatiar
12:56 1.IBAM Bug #3171 (Internal Testing): [Phase 2] Maintenance : Message Box - Date Picker (Expiry Date)
Sibghotulloh Ikhmatiar
12:55 1.IBAM Bug #3171 (Finished Development): [Phase 2] Maintenance : Message Box - Date Picker (Expiry Date)
root of issue: no error validation message for back dated calendar.
resolution: froze the editable textbox become re...
Sibghotulloh Ikhmatiar
12:48 1.IBAM Bug #3177 (Finished Development): IBAM>BIB : Company Enquiry - User Maintenance (Edit CA User)
Root of issue: when back-end detected maker user, it was committing the records during the result page.
Resolution: ...
Sibghotulloh Ikhmatiar

July 05, 2013

03:09 1.IBAM Change #3131 (Internal Testing): [Phase 2] Maintenance : Msg Box > Send New Notification
Sibghotulloh Ikhmatiar
18:17 1.IBAM Bug #3175 (Development / Work In Progress): IBAM>AUTHORIZATION
Pending Details[Edit Content] - Before changes are not appear in the screen. It shown as "Details for this transactio... Anwar Khairul
18:08 1.IBAM Change #3179 (Work Completed-End life cycle): [Phase2] IBAM: Add Validation for unallowed special...
Test Case: Enter un-allowed special character to name field in below module.
1. IBAM>IBAM - User Profile Maintenance...
Norhaidah Md Dasuki
17:55 2.RIB Bug #3172 (Finished Development): [Phase 2] RIB: Fund Transfer - Favourite Interbank Maintenance
Alwi Husada
16:58 1.IBAM Bug #3177 (Work Completed-End life cycle): IBAM>BIB : Company Enquiry - User Maintenance (Edit CA...
Hi Ikhmatiar,
Kindly assist on the issue.
*Step to re-produce:*
# Login as maker
# Click on Company Enquiry
...
Lizahwati Basirun
12:18 1.IBAM Bug #3175: IBAM>AUTHORIZATION
Hi Anwar,
For the pagination issue, involved modules are:
# User Profile Maintenance
# IBAM Navigation
# Secure...
Lizahwati Basirun
12:13 1.IBAM Bug #3175 (Work Completed-End life cycle): IBAM>AUTHORIZATION
Hi Anwar,
As per discussion before, kindly assist on the issue.Thanks.
# *Pending Details[Edit Content]* - Befo...
Lizahwati Basirun
11:37 1.IBAM Task #2193: [Phase2] IBAM>Maker Checker Maintenance
updating Task :
Task is pending changes to be done: 2245
Hosseiny Elham
11:35 1.IBAM Change #2245 (Development / Work In Progress): IBAM>Maker Checker Maintenance - Screen Flow and S...
Hosseiny Elham
11:34 1.IBAM Change #2245: IBAM>Maker Checker Maintenance - Screen Flow and Specification Rules
Alwi,
kindly change the name of the Button "Maker Checker Detail" to "Back".
*Step to re-produce:*
# Click on "...
Hosseiny Elham

July 04, 2013

17:54 2.RIB Bug #2994: [Phase 2] RIB: Fund Transfer and Bill Payment - Maintenance
*+Test Result+*
*1. Delete 3rd Party Favorite*
* Click on "Go Back" button, error message throw "TAC is required....
Siti Norahayu Mohd Desa
17:44 2.RIB Bug #3172 (Work Completed-End life cycle): [Phase 2] RIB: Fund Transfer - Favourite Interbank Mai...
*Reset TAC & Check Box bean*
_RIB > Fund Transfer > Favorite Interbank Maintenance_
+Step 1+
# Edit Favorite I...
Siti Norahayu Mohd Desa
17:05 2.RIB Task #2039: [Phase2] RIB>Zakat Payment
Hi Lizah,
Do this module have a checklist?
Kindly attach the checklist if the module completed. TQ
Siti Norahayu Mohd Desa
17:02 2.RIB Bug #2997: [Phase 2] RIB: Message Box
HI Alwi,
Kindly change the status to Internal Testing in order to closed this issue. TQ
Siti Norahayu Mohd Desa
16:59 2.RIB Bug #2995 (Development / Work In Progress): [Phase 2] RIB : Block ATM Card (Navigation)
Error still persist. Kindly assist.
User Name: sittester2
Password: aaaa6666
Siti Norahayu Mohd Desa
16:56 2.RIB Change #2996 (Work Completed-End life cycle): [Phase 2] RIB: Profile Management - Update Profile ...
Tested & Passed Siti Norahayu Mohd Desa
16:49 1.IBAM Bug #3126: [Phase 2] Maintenance : Message Box
Hi Ikh,
I believed the changes have been fixed and deployed. Kindly assist to change the status to Internal Testing ...
Siti Norahayu Mohd Desa
16:46 1.IBAM Change #3131: [Phase 2] Maintenance : Msg Box > Send New Notification
Hi Ikh,
I believed the changes have been fixed and deployed. Kindly assist to change the status to Internal Testing...
Siti Norahayu Mohd Desa
16:42 1.IBAM Task #2707 (Work Completed-End life cycle): IBAM>MAINTENANCE>Message Box>Notification (BIB Site)
Tested & Passed.
Siti Norahayu Mohd Desa
16:33 1.IBAM Bug #3171 (Work Completed-End life cycle): [Phase 2] Maintenance : Message Box - Date Picker (Exp...
* *Expiry Date Cannot less than today's date. - user can manually edited*
* *Expiry Date for Filter by criteria is r...
Siti Norahayu Mohd Desa
16:15 3.BIB Bug #3155 (Work Completed-End life cycle): BIB : Message Box - Restore
*Restore deleted message still show NEW message flag at Inbox.*
+Step to reproduce+
+Step 1+
_BIB > Message Bo...
Siti Norahayu Mohd Desa
15:55 3.BIB Change #3137 (Work Completed-End life cycle): BIB : Message Box - Wrap Text
*Wrap text for Subject text box field*
+Step to reproduce+
_BIB > Message Box_
# Inbox List Page
# Read Messa...
Siti Norahayu Mohd Desa
14:41 1.IBAM Task #1851 (Work Completed-End life cycle): [Phase2] IBAM>BIB: Company Enquiry - View, Add & Upda...

Updated Task:retested succesfully
Hosseiny Elham
14:20 1.IBAM Bug #1877 (Work Completed-End life cycle): IBAM>BIB: Company Enquiry - Secure Pass Management

This issue has been fixed and retested succesfully.
Hosseiny Elham
13:09 1.IBAM Bug #3133 (Work Completed-End life cycle): IBAM>IBAM : Content - Interbank
Hi Ting Wei ,
*Login as: userMaker*
*password: aaaa9999*
*Step to re-produce:*
# Click on IBAM
# Click on ...
Hosseiny Elham
10:23 3.BIB Bug #2726: BIB – User Maintenance – Create User – Viewer
Retest is done. Bug fixed. Ting Wei Gan
10:02 1.IBAM Change #3122 (Work Completed-End life cycle): [Phase 2] IBAM : Login
Tested & Passed. Siti Norahayu Mohd Desa

July 03, 2013

21:45 1.IBAM Change #3122 (Internal Testing): [Phase 2] IBAM : Login
Amended error message. Alwi Husada
21:44 1.IBAM Bug #1877 (Internal Testing): IBAM>BIB: Company Enquiry - Secure Pass Management
Fixed the Issue by adding BusinessException key. Alwi Husada
21:42 1.IBAM Change #3131: [Phase 2] Maintenance : Msg Box > Send New Notification
Fixed wrap page. Alwi Husada
21:07 1.IBAM Bug #3126 (Finished Development): [Phase 2] Maintenance : Message Box
*Root of Issue*: 1) back-dated calendar was enabled. 2) wrong BACK action forward mapping at the back-end level.
*Re...
Sibghotulloh Ikhmatiar
20:42 3.BIB Bug #2456 (Internal Testing): BIB : Login as an Initiator - Functionality
KIndly re-test. Alwi Husada
20:40 3.BIB Bug #2632 (Internal Testing): BIB : Profile Management - Update Profile (Initiator)~Functionality
Fixed issue kindly re-test. Alwi Husada
20:25 3.BIB Bug #2726 (Internal Testing): BIB – User Maintenance – Create User – Viewer
Updated username regex in DB. Alwi Husada
20:20 2.RIB Bug #2997 (Finished Development): [Phase 2] RIB: Message Box
related with this issue: https://hub.penril.net/redmine/issues/3131 Alwi Husada
20:18 1.IBAM Change #3131 (Finished Development): [Phase 2] Maintenance : Msg Box > Send New Notification
Alwi Husada
19:05 3.BIB Bug #2533 (Finished Development): BIB : Account Enquiry - Account Details (Layout & Design)
Resolution: Updated new layout and alignment Sibghotulloh Ikhmatiar
19:04 1.IBAM Bug #1877 (Finished Development): IBAM>BIB: Company Enquiry - Secure Pass Management
Alwi Husada
19:02 3.BIB Bug #2575 (Finished Development): BIB : Fund Transfer - New Interbank Transfer (Initiator)~ TAC F...
Sibghotulloh Ikhmatiar
19:01 1.IBAM Change #2780 (Work Completed-End life cycle): [Comfort Test] IBAM: IBAM Navigation - Result Page ...
Tested & Passed.
Note: This changes only apply for IBAM Navigation. BIB & RIB Navigation still need to be change.
Siti Norahayu Mohd Desa
18:28 1.IBAM Change #3131 (Work Completed-End life cycle): [Phase 2] Maintenance : Msg Box > Send New Notifica...
*Wrap text for Subject text box field*
+Step to reproduce+
_Maintenance > Message Box > Notification > Send New...
Siti Norahayu Mohd Desa
18:07 1.IBAM Change #3122 (Finished Development): [Phase 2] IBAM : Login
Alwi Husada
17:16 2.RIB Bug #2997 (Development / Work In Progress): [Phase 2] RIB: Message Box
Issue reported Tested & Passed.
But is it possible to cater the Inbox table as well?
Please refer attached. TQ
Siti Norahayu Mohd Desa
17:05 2.RIB Bug #2998 (Work Completed-End life cycle): [Phase 2] RIB: Message Box Alert
Tested & Passed. Issue closed. Siti Norahayu Mohd Desa
17:01 2.RIB Change #3128: [Phase 2] RIB: FT > Own Account Transfer - Own account transfer highlighted at HOME...
Please refer attachment for more information.TQ Siti Norahayu Mohd Desa
16:54 2.RIB Change #3128 (Work Completed-End life cycle): [Phase 2] RIB: FT > Own Account Transfer - Own acco...
*Click on "Make Another Transaction" button and Own Account Transfer navigation highlighted at HOME instead of Fund T... Siti Norahayu Mohd Desa
15:03 1.IBAM Bug #3126 (Work Completed-End life cycle): [Phase 2] Maintenance : Message Box
* *Page blank after click on BACK button at Confirm message page*
* *Expiry date must be today's date or greater tha...
Siti Norahayu Mohd Desa
14:47 1.IBAM Change #3125 (Work Completed-End life cycle): [Phase 2] Maintenance : Message Box
+*Search Recipient Screen*+
# Cater User Name field for User Name instead of Name
+*Search Recipient Result Scree...
Siti Norahayu Mohd Desa
12:29 1.IBAM Change #3122 (Work Completed-End life cycle): [Phase 2] IBAM : Login
+*Test Case# 1b.1.1*+
*Label not tally with error Message*
_Normal Login - Enter invalid Username or password_
...
Siti Norahayu Mohd Desa
11:18 1.IBAM Bug #1877 (Development / Work In Progress): IBAM>BIB: Company Enquiry - Secure Pass Management
Hosseiny Elham
11:17 1.IBAM Bug #1877: IBAM>BIB: Company Enquiry - Secure Pass Management
Hi Alwi ,
*I have been retested the Issue and faced new Bug. Kindly fix it .*
*Login As username:userMaker* ...
Hosseiny Elham

July 02, 2013

16:45 1.IBAM Bug #1877 (Internal Testing): IBAM>BIB: Company Enquiry - Secure Pass Management
Amended as per request,
and for Page die after click on "Create" button issue fixed after implemented SM token.
Alwi Husada
16:33 3.BIB Bug #2725: BIB – User Maintenance – Create User – Single User
Retest done. Bug fixed. Ting Wei Gan
16:09 3.BIB Bug #2449 (Internal Testing): BIB : FTL - Approver (Functionality)
Fixed after developed SM token implementation. Alwi Husada
16:07 3.BIB Bug #2505 (Internal Testing): BIB : Login as Single User - Functionality
Same issue as reported in this case: https://hub.penril.net/redmine/issues/2534 Alwi Husada
16:06 3.BIB Bug #2534 (Internal Testing): BIB : Account Enquiry - Account Details (Single User)~ Functionality
Invalid username and password, kindly proceed by using new valid single user. Alwi Husada
16:02 3.BIB Bug #2530 (Internal Testing): BIB : Login as Viewer (Access Module)
Cannot replicate, currently able to login as viewer and display the navigation. Alwi Husada
15:56 3.BIB Bug #2635 (Internal Testing): BIB : Profile Management - Change Password (Initiator)~Functionality
fixed kindly re-test, Alwi Husada
15:33 3.BIB Bug #2725 (Internal Testing): BIB – User Maintenance – Create User – Single User
Set Username regex as based on requirements. Alwi Husada
15:29 3.BIB Bug #2568 (Internal Testing): BIB : Fund Transfer - Favourite Maintenance (Initiator) ~ Functiona...
Fixed, reset field as per requested. Alwi Husada
09:44 3.BIB Change #3080 (Internal Testing): BIB : Print Receipt button (Change to Download as PDF)
Changed "Print Receipt" to "Download as PDF" Yap Kah Yan

July 01, 2013

14:41 3.BIB Task #2661 (Pending Review): BIB : Message Box (Single User)
The test on this module is done. No bug. Ting Wei Gan
14:40 3.BIB Task #2660 (Pending Review): BIB : Message Box (Corporate Admin)
The test on this module is done. No bug. Ting Wei Gan

June 28, 2013

17:32 1.IBAM Bug #2752 (Work Completed-End life cycle): IBAM>Maker Checker Maintenance - Screen Flow and Speci...

This Bug fixed and restested succesfully.
Hosseiny Elham
15:45 3.BIB Bug #2895 (Finished Development): BIB : Message Box (Single User)
Please refer from Bug #2840. Please note that the Message Box is a sharing feature for all BIB users. Sibghotulloh Ikhmatiar
15:12 1.IBAM Change #3072 (Finished Development): IBAM>Content>Notices
put secondLanguageSupportViewBean in jsp for multilanguage Syahrul Anwar
15:07 3.BIB Change #3080 (Work Completed-End life cycle): BIB : Print Receipt button (Change to Download as PDF)
Hi KahYan,
Kindly assist on changing the Print Receipt button to Download as PDF button. Please change for all but...
Lizahwati Basirun
09:45 1.IBAM Bug #2752 (Internal Testing): IBAM>Maker Checker Maintenance - Screen Flow and Specification Rules
Amended ":" position. Alwi Husada

June 27, 2013

15:35 1.IBAM Bug #2752 (Finished Development): IBAM>Maker Checker Maintenance - Screen Flow and Specification ...
Alwi Husada
15:10 1.IBAM Bug #2752 (Development / Work In Progress): IBAM>Maker Checker Maintenance - Screen Flow and Spec...
Hi
Kindly assist to solve it.
*Login as maker:userMaker
Password:aaaa5555*
# click on IBAM
# Click on Maker C...
Hosseiny Elham

June 26, 2013

18:29 1.IBAM Change #3072 (Work Completed-End life cycle): IBAM>Content>Notices
Salam Syahrul,
Kindly assist on the changes. Thank you.
+*Notices>Create and Edit*+
*IBAM>Authorization>Pend...
Lizahwati Basirun

June 25, 2013

11:28 2.RIB Bug #2994 (Finished Development): [Phase 2] RIB: Fund Transfer and Bill Payment - Maintenance
Yap Kah Yan
10:28 2.RIB Change #2996 (Internal Testing): [Phase 2] RIB: Profile Management - Update Profile (Remove label)
removed Language field. Alwi Husada

June 24, 2013

16:00 2.RIB Bug #2995 (Internal Testing): [Phase 2] RIB : Block ATM Card (Navigation)
cannot replicate issue Yap Kah Yan
15:34 2.RIB Bug #2998 (Internal Testing): [Phase 2] RIB: Message Box Alert
root cause:
Nid parameter is not encrypted, this cause unable to find Navigation node id in the DB.
resolution:
...
Alwi Husada
15:31 2.RIB Bug #2997 (Internal Testing): [Phase 2] RIB: Message Box
Added CSS (Style: word-wrap:brea-word) to wrap mailbox subject. Alwi Husada
15:25 Bug #3001 (Internal Testing): [Phase 2] IBAM : IRIB
Added validation for checking operation start time != Operation end time and customer name validation to accept space Alwi Husada
14:50 3.BIB Enhancement #2822 (Internal Testing): BIB - Corporate Admin - Enhancement on Create User and Edit...
Ting Wei Gan

June 23, 2013

02:52 Bug #3001 (Finished Development): [Phase 2] IBAM : IRIB
Alwi Husada
02:25 2.RIB Bug #2997 (Finished Development): [Phase 2] RIB: Message Box
Alwi Husada
02:14 2.RIB Bug #2998 (Finished Development): [Phase 2] RIB: Message Box Alert
Alwi Husada
17:20 Bug #3001 (Work Completed-End life cycle): [Phase 2] IBAM : IRIB
Salam Alwi,
Kindly assist on fix the bugs issue. Thanks.
+*RIB Navigation*+
*Edit RIB Navigation (Parent Cat...
Lizahwati Basirun
14:54 2.RIB Bug #2998 (Work Completed-End life cycle): [Phase 2] RIB: Message Box Alert
Salam Alwi,
Kindly assist on the "Session Expired" issue. Thanks.
Message Box Alert
-Click on You have <> unre...
Lizahwati Basirun
14:52 2.RIB Bug #2997 (Work Completed-End life cycle): [Phase 2] RIB: Message Box
Salam Alwi,
Kindly assist on this issue. Thanks.
Message Box (**Refer attachment)
-Click on Message Box>Inbox
...
Lizahwati Basirun
14:50 2.RIB Change #2996 (Work Completed-End life cycle): [Phase 2] RIB: Profile Management - Update Profile ...
Salam Alwi,
Kindly assist on it. Thanks.
-Update Profile Management
-->Once updated the profile, on the detail...
Lizahwati Basirun
14:46 2.RIB Bug #2995 (Work Completed-End life cycle): [Phase 2] RIB : Block ATM Card (Navigation)
Salam Alwi,
Kindly assist on the "Session Expired" issue.Thanks.
*Step to re-produce:*
Click on Block ATM Card...
Lizahwati Basirun
14:41 2.RIB Bug #2994 (Work Completed-End life cycle): [Phase 2] RIB: Fund Transfer and Bill Payment - Mainte...
Salam Alwi,
Kindly assist. Thanks.
h1. *3rd Party Maintenance*
+*Add Favourite 3rd Party (invalid error mess...
Lizahwati Basirun

June 19, 2013

19:37 3.BIB Bug #2840 (Finished Development): BIB : Message Box (Corporate Admin)
*Root of Issue:* No checkbox Validation defined on the back-end layer.
*Resolution:* Added checkbox Validation defin...
Sibghotulloh Ikhmatiar
14:35 1.IBAM Bug #2943 (Work Completed-End life cycle): [Phase2] IBAM>BIB: BIB Navigation - View & Edit Naviga...
Hi Kartono,
*Kindly assist to solve this Bug,*
h3. login:
username: elhamMaker
Password: aaaa1111
*
* *Ste...
Hosseiny Elham
08:43 1.IBAM Bug #2752 (Internal Testing): IBAM>Maker Checker Maintenance - Screen Flow and Specification Rules
Same issue as https://hub.penril.net/redmine/issues/2245, Alwi Husada
08:42 1.IBAM Change #2245 (Internal Testing): IBAM>Maker Checker Maintenance - Screen Flow and Specification R...
Amended the screen flow as per Requirement,
Thanks,
Alwi Husada

June 18, 2013

15:59 1.IBAM Bug #2920 (Work Completed-End life cycle): Phase2BIB:SIT IBAM - Maintenance - Change Own Password
Dear Kartono,
Kindly assist to solve this Bug.Thanks
IBAM,
1. Click Maintenance
2. Click on Change Own Passw...
Hosseiny Elham
14:58 1.IBAM Bug #2917 (Dropped-End of life cycle): IBAM>Message Box
Hi Kartono,
Kindly assist to solve this bug thanks.
1. Click on "Messgae Box".
2. Select "Subject Maintenace".
...
Hosseiny Elham
13:31 1.IBAM Bug #2915 (Work Completed-End life cycle): IBAM>IBAM: Content>Product Type
Dear Kartono,
please assist to solve this issue.Thank you .
1.Click on IBAM.
2.Click on Content Module .
3...
Hosseiny Elham

June 17, 2013

17:47 3.BIB Bug #2895 (Work Completed-End life cycle): BIB : Message Box (Single User)
Hi Ikh,
Please fix the bugs below, kindly refer to the attached module test checklist and screenshot for reference...
Ting Wei Gan
17:19 3.BIB Task #2439 (Pending Review): [Phase 2] BIB: First Time Login - Initiator
Salam Kak Haida,
As per attached is the updated Module Checklist. Bugs have been fixed and successfully re-tested....
Lizahwati Basirun
17:14 3.BIB Bug #2447 (Work Completed-End life cycle): BIB>FTL - Initiator (Password Validation)
All bugs were fixed and successfully re-tested. Lizahwati Basirun
13:07 1.IBAM Bug #1993 (Development / Work In Progress): IBAM>IBAM: Content>Product Type
Hi Alwi,Kindly asssist to solve the Bug.
please change to standard space for all colons ":" in Content module.
Hosseiny Elham
10:10 1.IBAM Task #1850 (Pending Review): [Phase2] IBAM>BIB: Company Enquiry - View, Create & Edit User Mainte...
Dear Haida,
*** All Bugs have been fixed and retested succesfully.
Hosseiny Elham

June 14, 2013

11:29 1.IBAM Bug #2532 (Work Completed-End life cycle): IBAM>BIB: Company Enquiry - View, Create & Edit User M...

The bug has been fixed and retested successfuly unless they want to change the flow fro single user.
Hosseiny Elham
11:03 1.IBAM Bug #2820 (Work Completed-End life cycle): IBAM>BIB: Company Enquiry - View, Create & Edit User M...

Ehis Bug Fixed and retested succesfully .
Hosseiny Elham
11:02 1.IBAM Bug #2820: IBAM>BIB: Company Enquiry - View, Create & Edit User Maintenance

Hosseiny Elham
10:46 3.BIB Bug #2686 (Work Completed-End life cycle): BIB : Reset Password - Corporate Admin (Password Funct...
Bug fixed and retest is done. Ting Wei Gan
10:45 3.BIB Bug #2709 (Work Completed-End life cycle): BIB – User Maintenance – Create User - Initiator
Bug fixed and retest is done. Ting Wei Gan
10:43 3.BIB Bug #2710 (Work Completed-End life cycle): BIB – User Maintenance – Create User - Approver
Bug fixed and testing is done. Ting Wei Gan
10:37 3.BIB Bug #2644 (Work Completed-End life cycle): BIB : FTL - Corporate Admin (Password Functionality)
Issues are fixed and testing is done. Ting Wei Gan
10:20 3.BIB Bug #2838 (Internal Testing): BIB : User Maintenance - Edit User (Change Max Length for Tel No an...
hi Kak Liza,
Max length of telephone no and mobile no were changed as requested. Please kindly re-test it.
Than...
Wijaya Kartono
10:18 1.IBAM Bug #2820 (Internal Testing): IBAM>BIB: Company Enquiry - View, Create & Edit User Maintenance
Hi Kak Liza,
Max length of telephone no and mobile no were changed as requested. Please kindly re-test it.
Than...
Wijaya Kartono

June 13, 2013

17:40 3.BIB Bug #2840 (Work Completed-End life cycle): BIB : Message Box (Corporate Admin)
Hi Ikh,
Please fix the bugs below, kindly refer to the attached module test checklist for reference.
+Test Case...
Ting Wei Gan
15:49 3.BIB Bug #2838 (Work Completed-End life cycle): BIB : User Maintenance - Edit User (Change Max Length ...
Hi Kartono,
Kindly assist to fix the bugs:
BIB>Login as cust03/aaaa1111
*IB Service Administration>User Main...
Lizahwati Basirun
15:34 1.IBAM Bug #2820 (Development / Work In Progress): IBAM>BIB: Company Enquiry - View, Create & Edit User ...
Hi Kartono,
Kindly assist to change the *max length fields* for the telephone no and mobile no.
# Telephone No ...
Lizahwati Basirun
10:39 1.IBAM Bug #1993 (Internal Testing): IBAM>IBAM: Content>Product Type
Hi Elham,
As discussed, dual language was turned off for IBAM. Please kindly re-test it.
Thank you.
Wijaya Kartono

June 12, 2013

18:11 2.RIB Bug #2785 (Work Completed-End life cycle): RIB : Navigation - Takaful
Hi,
The bug was fixed and successfully re-tested.
Lizahwati Basirun
17:53 1.IBAM Bug #1993 (Development / Work In Progress): IBAM>IBAM: Content>Product Type

Hi Kartono,
some part fields are still disable .
Hosseiny Elham
12:18 1.IBAM Bug #2244 (Work Completed-End life cycle): [Phase2] IBAM: Authorization

*** This bus has been fixed and retested succesfully.
Hosseiny Elham
12:14 3.BIB Task #2654: BIB : Reset Password (Corporate Admin)
All bugs are fixed. Please refer to the attached second test list of this module. Ting Wei Gan
12:11 3.BIB Task #2443: [Phase 2] BIB : First time login - Corporate Admin
All bugs are fixed. Please refer to the attached test list of this module. Ting Wei Gan
12:04 1.IBAM Bug #2820 (Work Completed-End life cycle): IBAM>BIB: Company Enquiry - View, Create & Edit User M...

** This Bug has been fixed and retested succesfully.
Hosseiny Elham
11:44 2.RIB Bug #2785 (Internal Testing): RIB : Navigation - Takaful
root cause:
there is duplicate node name for Takaful navigation in the IB_NAVIGATION table,
resolution:
Remove u...
Alwi Husada
11:35 3.BIB Bug #2604 (Internal Testing): BIB : Fund Transfer - Favourite Maintenance Interbank (Initiator)~ ...
Kak Liza,
Remove code for reseting the value during back and added validation to check existing account number reg...
Alwi Husada
11:06 3.BIB Bug #2465 (Internal Testing): BIB : FTL - Viewer (Functionality)
Kak Liza,
In order to create Viewer user kindly set up in IBAM company details,
IBAM Path:
IBAM-BIB -> Company...
Alwi Husada
10:59 1.IBAM Task #2707: IBAM>MAINTENANCE>Message Box>Notification (BIB Site)
FYI: The message box feature on the IBAM and BIB has been updated and able to work properly. We had pushed changes, d... Sibghotulloh Ikhmatiar
10:52 3.BIB Bug #2755 (Internal Testing): BIB : Favourite Interbank GIRO Transfer (Initiator)
*Root of Issue:*
We were facing deployment issue last time due to fingerprint issue at the mercurial and causing jen...
Sibghotulloh Ikhmatiar
10:33 3.BIB Bug #2784 (Internal Testing): BIB : Authorization - New Interbank Transfer (Approver)
*Root of Issue:*
There was an error thrown in the back-end (service) layer and made the front-end layer was unable t...
Sibghotulloh Ikhmatiar
Avatar?id=1966&size=24 10:17 3.BIB Bug #2684 (Work Completed-End life cycle): BIB : Reset Password - Single User (Functionality)
Noted and re-test done.
Thank you.
Ngoh Chee Onn
 