Activity

From April 28, 2016 to May 27, 2016

May 27, 2016

18:26 Bug #6185 (User Acceptance Test): Dashboard - JPPPA
Tested & passed.
Please find attached test result.
Siti Norahayu Mohd Desa
14:53 Bug #6185 (Internal Testing): Dashboard - JPPPA
Fixed, please refer email for data cross check Aditya Prathama

May 26, 2016

17:14 Enhancement #5562 (User Acceptance Test): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
25/5/2016 - Reported issue fixed as below. Send to user for retest.
1) all fast fact report for year 2015, displayed...
Norhaidah Md Dasuki
16:40 Enhancement #6202 (User Acceptance Test): [UAT3-9 - UAT_218] - Promotion >> Registration - Import...
26/5/2016 - Reported issue has been fixed. Send to User to retest. Norhaidah Md Dasuki
15:40 Enhancement #6202 (Internal Testing): [UAT3-9 - UAT_218] - Promotion >> Registration - Import Com...
Fixed please retest Aditya Prathama
12:03 Feature #6281 (Work Completed-End life cycle): Budget >> ACTIVITY BUDGET INFORMATION >> Modify Co...
Tested And Passed.
Siti Norahayu Mohd Desa
12:01 Bug #6207 (Work Completed-End life cycle): Planning >> Activities List - Total Sales Generated
Testing using MIHAs 2016.
Sales generated calculated with an exact amount. (Actual Sales + Potential Sales)
Siti Norahayu Mohd Desa
11:53 Feature #6281 (Internal Testing): Budget >> ACTIVITY BUDGET INFORMATION >> Modify Columns
Hi ayu
fixed at the ACTIVITY BUDGET INFORMATION column.Please check with this . Was deployed.
Tan Jeng Wei
11:24 Feature #6280 (Work Completed-End life cycle): Planning JPPPA >> List of Activities
Tested & Passed. Siti Norahayu Mohd Desa
11:21 Feature #6281 (Development / Work In Progress): Budget >> ACTIVITY BUDGET INFORMATION >> Modify C...
Hi Jeng Wei,
Please fix at the ACTIVITY BUDGET INFORMATION column also.
Siti Norahayu Mohd Desa
11:05 Bug #6207 (Internal Testing): Planning >> Activities List - Total Sales Generated
Hi Ayu,
Data was tally since adit was changing the view table on ytd. Please check with this. Thanks a lot.
Tan Jeng Wei

May 25, 2016

17:47 Enhancement #5628 (Internal Testing): [M3-9/019] - Promotion >> Registration Form Internal & Exte...
Hi ayu
was added requested remove any irrelevant message once the required field is filled when click next/submit ...
Tan Jeng Wei
16:41 Enhancement #5742 (Development / Work In Progress): [UAT3-9 - UAT_017 & UAT_018] - Dashboard > JP...
Still on going fixes.
Pending on Actual sales issues.
Siti Norahayu Mohd Desa
16:26 Bug #6191 (User Acceptance Test): Dashboard - Budget
Reported Issue tested successfully
Please find test result as per attached.
Siti Norahayu Mohd Desa
14:32 Enhancement #5628 (Development / Work In Progress): [M3-9/019] - Promotion >> Registration Form I...
As discussed, kindly remove any irrelevant message once the required field is filled. Norhaidah Md Dasuki
14:10 Enhancement #5562 (Internal Testing): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
Hi Ayu,
1. Fast Fact - No. of Programme By Status
- Was change "Programme Status - (2015) " to "No. of Programme ...
Tan Jeng Wei
14:00 Feature #6280: Planning JPPPA >> List of Activities
Hi Ayu
Was added monetary format for Planning JPPPA columns.
Actual Sales
Generated Sales
Media Value
Potentia...
Tan Jeng Wei
13:28 Bug #6191 (Internal Testing): Dashboard - Budget
Updated query, please test Aditya Prathama
13:08 Enhancement #5562 (Development / Work In Progress): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
Hi Jeng Wei,
Kindly fix below issue also.
1. Fast Fact - No. of Programme By Status
- change "Programme Statu...
Norhaidah Md Dasuki
12:56 Enhancement #5724 (User Acceptance Test): [UAT3-9 - UAT_017] - Dashboard > JPPPA
Norhaidah Md Dasuki
12:55 Enhancement #5870 (User Acceptance Test): [UAT3-9 - UAT_151] - Dashboard
Norhaidah Md Dasuki
12:53 Enhancement #5870: [UAT3-9 - UAT_151] - Dashboard
24/5/16 - Fixed to include legend to the necessary graph and bar chart. Send to user for retest. Norhaidah Md Dasuki
12:52 Enhancement #5724: [UAT3-9 - UAT_017] - Dashboard > JPPPA
24/5/16 - Based on previous discussion with En. Rizal, due to limitation of Amchart, we provide solution to show the... Norhaidah Md Dasuki
12:36 Change #5829 (Dropped-End of life cycle): [UAT3-9 - UAT_115] - Administration > Currency Rate
11/5/16 [Rizal] - MATRADE informed to drop this item Norhaidah Md Dasuki
12:35 Enhancement #5742 (Internal Testing): [UAT3-9 - UAT_017 & UAT_018] - Dashboard > JPPPA
Please confirm on the fixes. Norhaidah Md Dasuki
12:34 Enhancement #5724 (Internal Testing): [UAT3-9 - UAT_017] - Dashboard > JPPPA
Please confirm on the fixes. Norhaidah Md Dasuki
12:33 Change #5663 (Dropped-End of life cycle): [M3-9/048] - Post Event >> List Of Event (UAT3-9/250)

11/5/16 [Rizal] - MATRADE informed to drop this item
Norhaidah Md Dasuki
12:32 Change #5690 (Dropped-End of life cycle): [M3-9/076] - Administration>> Template Management (UAT3...
11/5/16 [Rizal] - MATRADE also informed to drop this item 1,4. Item 6 already discussed on 5 Feb 16 and it is not CR ... Norhaidah Md Dasuki
12:31 Change #5708 (Dropped-End of life cycle): [TPMS_Review] - Promotion >> Business Meeting >> Master...
11/5/16 [Rizal] - MATRADE informed to drop this item Norhaidah Md Dasuki
12:30 Change #5709 (Dropped-End of life cycle): [TPMS_Review] - Promotion >> Business Meeting (UAT3-9/244)
11/5/16 [Rizal] - MATRADE informed to drop this item Norhaidah Md Dasuki
11:59 Feature #6280 (Internal Testing): Planning JPPPA >> List of Activities
Tan Jeng Wei
11:47 Feature #6281 (Internal Testing): Budget >> ACTIVITY BUDGET INFORMATION >> Modify Columns
Hi Ayu
ACTIVITY BUDGET INFORMATION
#Total Budget Utilized(RM) to Total Utilised Budget(RM) --Fixed
#Balance App...
Tan Jeng Wei
11:30 Enhancement #5562 (Internal Testing): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
Hi ayu,
*requested the include MATRADE event to the report as below
Fast Fact:
NO. OF PROGRAMME BY MINISTR...
Tan Jeng Wei
10:48 Enhancement #5628: [M3-9/019] - Promotion >> Registration Form Internal & External (UAT3-9/247)
Hi ayu
Adding the validation at
promotion --> Event publicationList ---> Registeration
event --> click view ...
Tan Jeng Wei

May 24, 2016

17:30 Enhancement #5562 (Development / Work In Progress): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
12/5/2016 - number of event is stilll not tally between those mention report (`- all fast fact report for year 2015, ... Norhaidah Md Dasuki
16:59 Enhancement #6202 (Development / Work In Progress): [UAT3-9 - UAT_218] - Promotion >> Registratio...
promotion - to include salutation in import from excel script
12/5/2016 - Salutation only saved at "representative...
Norhaidah Md Dasuki
16:48 Enhancement #5665 (Closed - End of life cycle): [M3-9/050] - Post Event >> Programmes (UAT3-9/251)
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
16:47 Enhancement #5654 (Closed - End of life cycle): [M3-9/039] - Publication >> Edit Write Up (UAT3-9...
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
16:43 Enhancement #5838 (Closed - End of life cycle): [UAT3-9 - UAT_160]- Post Event > Programmes > Fee...
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
16:34 Enhancement #5871 (Closed - End of life cycle): [UAT3-9 - UAT_174] - Post Event >> JPPPA Report
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
16:29 Enhancement #5849 (Closed - End of life cycle): [UAT3-9 - UAT_159] - Post Event > Event Report > ...
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
16:27 Enhancement #5848 (Closed - End of life cycle): [UAT3-9 - UAT_157] - Post Event > Programmes > Fe...
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
16:26 Enhancement #5831 (Closed - End of life cycle): [UAT3-9 - UAT_093] - Promotion > Business Meeting
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:49 Bug #6201 (User Acceptance Test): Dashboard - Programme
Tested & passed.
Pending print maps with legend.
Please refer test result as per attached
Siti Norahayu Mohd Desa
15:43 Change #5952 (Closed - End of life cycle): [UAT1&2 - UAT_120] - Administrator >> User Management
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:42 Change #5950 (Closed - End of life cycle): [UAT1&2 - UAT_108] - Planning JPPPA
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:42 Enhancement #5450 (Closed - End of life cycle): [UAT1&2 - UAT_106] - Report Time Stamp
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:41 Change #5949 (Closed - End of life cycle): [UAT1&2 - UAT_101] - Planning >> Activities List - Add...
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:40 Change #5948 (Closed - End of life cycle): [UAT1&2 - UAT_100] - Planning >> Activities List
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:38 Change #5867 (Closed - End of life cycle): [UAT1&2 - UAT_097] - Planning >> Planning Report >> Ov...
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:37 Change #5865 (Closed - End of life cycle): [UAT1&2 - UAT_092] - Planning >> Activities List
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:36 Enhancement #5449 (Closed - End of life cycle): [UAT1&2 - UAT_088] - Search Filter >> Date Range
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:35 Enhancement #5448 (Closed - End of life cycle): [UAT1&2 - UAT_050] - Administration >> Audit Trail
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:35 Change #5951 (Pending Prod Deployment): [UAT1&2 - UAT_109] - Report Planning JPPPA >> List of Pro...
12/5/16 [Helmi] - Successfully tested and Closed
Pending Prod Deployment.
Norhaidah Md Dasuki
15:32 Bug #6185: Dashboard - JPPPA
HI Adit,
Please assist.
Siti Norahayu Mohd Desa
15:30 Enhancement #5447 (Closed - End of life cycle): [UAT1&2 - UAT_027] - Planning >> KPI Setting >> V...
13/5/2016 - Successfully deployed to Production
Migration Ver:029
Norhaidah Md Dasuki
15:30 Feature #6281 (Work Completed-End life cycle): Budget >> ACTIVITY BUDGET INFORMATION >> Modify Co...
To change wording from:
*ACTIVITY BUDGET INFORMATION*
# Total Budget Utilized(RM) to Total Utilised Budget(RM)
...
Siti Norahayu Mohd Desa
15:19 Feature #6280 (Work Completed-End life cycle): Planning JPPPA >> List of Activities
To add monetary format for Planning JPPPA column below:-
eg: 150,000
* Actual Sales
* Generated Sales
* Med...
Siti Norahayu Mohd Desa

May 19, 2016

18:40 Enhancement #6249 (User Acceptance Test): [UAT3-9 - UAT_253] - Administration > Template Management
This issue already exist in the system. Tested and send for User Test Norhaidah Md Dasuki
18:30 Enhancement #5628 (Internal Testing): [M3-9/019] - Promotion >> Registration Form Internal & Exte...
Tan Jeng Wei

May 18, 2016

10:07 Enhancement #6249 (Internal Testing): [UAT3-9 - UAT_253] - Administration > Template Management
Tan Jeng Wei

May 17, 2016

18:15 Enhancement #5628: [M3-9/019] - Promotion >> Registration Form Internal & External (UAT3-9/247)
Hi Jeng Wei,
Kindly assist.
Siti Norahayu Mohd Desa
18:08 Enhancement #6249 (Closed - End of life cycle): [UAT3-9 - UAT_253] - Administration > Template Ma...
Issue have been change from CR to Enhancement. Refer email [UAT Conditional Sign Off] : Phase 2 - Module 3-9 Issue Lo... Siti Norahayu Mohd Desa
16:59 Enhancement #5452 (User Acceptance Test): [UAT1&2 - UAT_115] - Report >> Generate Word Report
17/05/2016 -
Send for User Acceptance test
Siti Norahayu Mohd Desa
15:20 Enhancement #5870 (Internal Testing): [UAT3-9 - UAT_151] - Dashboard
according discussion , implemented map legend will not appear on export or download function, this legend only appear... Aditya Prathama
10:50 Bug #6201 (Internal Testing): Dashboard - Programme
current maps data already display event was organised more than one country.
no need changes required
Aditya Prathama

May 16, 2016

09:59 Bug #6207: Planning >> Activities List - Total Sales Generated
Hi Jeng Wei,
Please help on this issue. The original issue already fixed. But when compared with Dashboard Generated...
Najmi Pasarudin
09:53 Enhancement #5452 (Internal Testing): [UAT1&2 - UAT_115] - Report >> Generate Word Report
*SUMMARY OF WORK PROGRAMME*
-- Please add on SUMMARY BY BUDGET TYPE at generate ms word also.-
*Dropped due to micr...
Najmi Pasarudin
09:51 Bug #6228 (Development / Work In Progress): Publication >> Email marketing
Najmi Pasarudin

May 12, 2016

13:48 Enhancement #5562: [UAT3-9 - UAT_246] Post Event >> JPPPA Report
Hi Haidah,
Was fixed the column merge cell. please check with this . Thanks
Tan Jeng Wei
11:13 Enhancement #5562 (Internal Testing): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
Tan Jeng Wei

May 11, 2016

15:51 Change #5951 (User Acceptance Test): [UAT1&2 - UAT_109] - Report Planning JPPPA >> List of Promot...
Issue reported fixed and tested. Send for SIT/UAT Norhaidah Md Dasuki
15:48 Enhancement #6047 (User Acceptance Test): [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work...
Issue reported fixed and tested. Send for SIT/UAT Norhaidah Md Dasuki
15:42 Enhancement #5866 (User Acceptance Test): [UAT1&2 - UAT_098] - Planning >> Planning Report >> Ove...
Retest on issue reported - PASSED. send for UAT Norhaidah Md Dasuki
14:52 Enhancement #6202 (User Acceptance Test): [UAT3-9 - UAT_218] - Promotion >> Registration - Import...
Norhaidah Md Dasuki
14:51 Enhancement #5562 (Development / Work In Progress): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
7. Reports - All Generated Sales By Country
In excel report - to recheck cell merge setting, when auto arrange cell ...
Norhaidah Md Dasuki
14:44 Enhancement #6202 (Development / Work In Progress): [UAT3-9 - UAT_218] - Promotion >> Registratio...
Norhaidah Md Dasuki

May 05, 2016

17:57 Enhancement #5451 (Internal Testing): [UAT1&2 - UAT_114] - All Module >> Table Header Sorting
Hi ayu,
1)PLANNING
a)Activity List
Fixed the selection sort by DESC --> Please check with this.
b)Planning JPPP...
Tan Jeng Wei
16:56 Bug #6228 (Work Completed-End life cycle): Publication >> Email marketing
Email Subject: Finding in module Email Marketing in UAT environment
1. Status sending not change after invitation ...
Siti Norahayu Mohd Desa
13:49 Enhancement #5562 (User Acceptance Test): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
4. Fast Fact - No. of Programme By Status
External user (3,50,52,10,51) COMPLETED,CONFIRMED,CANCELLED,POSTPONED,T...
Siti Norahayu Mohd Desa
12:11 Change #5951 (Internal Testing): [UAT1&2 - UAT_109] - Report Planning JPPPA >> List of Promotion ...
Tan Jeng Wei

May 04, 2016

15:31 Enhancement #6047: [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Programme
Hi ayu
Fixed use same font size/type.
Fixed excel, was re-adjusted border to the report.
Please retest after dep...
Tan Jeng Wei
15:29 Change #5951 (Development / Work In Progress): [UAT1&2 - UAT_109] - Report Planning JPPPA >> List...
HI Jeng Wei,
+Word Format+
Please assist to re-aligned the border line.
Siti Norahayu Mohd Desa
12:24 Bug #6223 (Work Completed-End life cycle): Dashboard - ROI
Tested & Passed. Siti Norahayu Mohd Desa
12:09 Bug #6223: Dashboard - ROI
Hi ayu,
ROI – BY REGION
To hide the color code in Download as CSV & XLSX.
To add extra one row for time-stamp....
Tan Jeng Wei
12:08 Enhancement #5866: [UAT1&2 - UAT_098] - Planning >> Planning Report >> Overall Summary >> Details...
Hi ayu
Fixed font size/type for Programme Type listing to 9 requested by user
Fixed excel, adjust columns and row...
Tan Jeng Wei
11:50 Enhancement #5866 (Internal Testing): [UAT1&2 - UAT_098] - Planning >> Planning Report >> Overall...
Tan Jeng Wei
11:06 Enhancement #6047 (Internal Testing): [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Pro...
Tan Jeng Wei
10:48 Bug #6223 (Internal Testing): Dashboard - ROI
Tan Jeng Wei
10:29 Change #5951 (Internal Testing): [UAT1&2 - UAT_109] - Report Planning JPPPA >> List of Promotion ...
Hi ayu
root/cause: Jasper report pdf setting
solution : changing jasper report pdf setting to stretch overflow...
Tan Jeng Wei

May 03, 2016

18:39 Enhancement #6175 (Work Completed-End life cycle): Planning >> Reports >> Budget Reports - RINGKA...
Tested & Passed. Added No section value in the said report. Siti Norahayu Mohd Desa
18:38 Change #5951 (Development / Work In Progress): [UAT1&2 - UAT_109] - Report Planning JPPPA >> List...
Siti Norahayu Mohd Desa
18:36 Enhancement #6202 (User Acceptance Test): [UAT3-9 - UAT_218] - Promotion >> Registration - Import...
Currently all report generated in TPMS does not required to display Salutation. For that there is not issue if we pro... Norhaidah Md Dasuki
18:15 Bug #6190 (Dropped-End of life cycle): Planning >> Activities List >> Export as
Hi Chee Onn,
I will dropped this issue. After investigation with najmi, this was an excel issue.
Siti Norahayu Mohd Desa
18:08 Bug #6223 (Development / Work In Progress): Dashboard - ROI
Hi Jeng Wei,
Issue reported below still persist. Kindly assist. tq
*ROI – BY REGION*
# To hide hex color c...
Siti Norahayu Mohd Desa
17:56 Enhancement #5453 (User Acceptance Test): [UAT1&2 - UAT_048 & 049] - Planning & Planning JPPPA >>...
Issue reported tested and passed.
Send to MATRADE for SIT/UAT and feedback.
Norhaidah Md Dasuki
17:53 Change #5949 (Pending Prod Deployment): [UAT1&2 - UAT_101] - Planning >> Activities List - Add Bu...
13/4/2016 [KD] - Tested and closed.
Pending for production deployment
Norhaidah Md Dasuki
17:44 Enhancement #6047 (Development / Work In Progress): [UAT1&2 - UAT_105] - Report Planning >> Summa...
13/4/2016 [KD] - Please use same font size/type.
Notes: For excel, please re-adjust/add border to the report.
Norhaidah Md Dasuki
17:32 Enhancement #5866 (Development / Work In Progress): [UAT1&2 - UAT_098] - Planning >> Planning Rep...
13/4/2016 [KD] - Please use same font size/type for Programme Type listing
Notes: For excel, please re-adjust the ...
Norhaidah Md Dasuki
15:05 Enhancement #5452 (Development / Work In Progress): [UAT1&2 - UAT_115] - Report >> Generate Word ...
*SUMMARY OF WORK PROGRAMME*
- Please add on SUMMARY BY BUDGET TYPE at generate ms word also.
*SUMMARY OF PROMOTI...
Siti Norahayu Mohd Desa
10:17 Enhancement #5451: [UAT1&2 - UAT_114] - All Module >> Table Header Sorting
najmi please help Aditya Prathama

April 29, 2016

18:15 Change #5951 (Internal Testing): [UAT1&2 - UAT_109] - Report Planning JPPPA >> List of Promotion ...
Hi ayu
Report Planning JPPPA >> List of Promotion Programme By All Ministries and Agencies
1)Fixed the Remarks co...
Tan Jeng Wei
18:11 Bug #6223: Dashboard - ROI
Hi Ayu
ROI – BY PROGRAMME TYPE
Fixed from | Program Type | ROI | Programme Full Name | to | Programme Full Name ...
Tan Jeng Wei
18:07 Enhancement #5562 (Internal Testing): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
Hi Ayu ,
4. Fast Fact - No. of Programme By Status
I was changing the external user (3,50,52,10,51) COMP...
Tan Jeng Wei
16:53 Enhancement #5562 (Development / Work In Progress): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
HI Jeng Wei,
Feedback from Helmi as below:-
*4. Fast Fact - No. of Programme By Status*
EXTERNAL User ---> ...
Siti Norahayu Mohd Desa
16:04 Bug #6223 (Internal Testing): Dashboard - ROI
Tan Jeng Wei
14:23 Bug #6185 (Development / Work In Progress): Dashboard - JPPPA
*Impact by Ministry – By Actual Sales*
Data in dashboard not tally with system.
In system shows actual sales = 15...
Siti Norahayu Mohd Desa

April 28, 2016

17:46 Bug #6201 (Development / Work In Progress): Dashboard - Programme
Replied by En. Rizal on 28 April 2016:
If the event was organised more than one country, then the map or chart sho...
Siti Norahayu Mohd Desa
16:49 Bug #6223 (Work Completed-End life cycle): Dashboard - ROI
*ROI – BY PROGRAMME TYPE*
# Re-arrange column to standardize with Overall dashboard for Download as CSV & XLSX.
C...
Siti Norahayu Mohd Desa
13:07 Bug #6191 (Development / Work In Progress): Dashboard - Budget
Hi Adit,
*APPROVED BUDGET VS UTILIZED BUDGET BY SECTION*
+Extract from DB+
LIFESTYLE SECTION 6550000 for app...
Siti Norahayu Mohd Desa
 