Activity

From October 15, 2011 to November 13, 2011

November 11, 2011

15:16 Bug #1263 (Work Completed-End life cycle): User Profile Maintenace
+*Reset Password*+
Actual Result : New Password & Confirm Password will go to previous page after press enter button...
Siti Norahayu Mohd Desa

November 04, 2011

17:46 Task #1249 (Development / Work In Progress): IBAM - Currency Code Image
Lizahwati Basirun

November 02, 2011

13:58 Task #1124: IBAM Functional Test - Admin Group Maintenance & Admin Maintenance
Already re-test. :)
test case 4.5
description :Suspend Admin
details : this function already delete in the IBAM
...
Misran Mimi Zulaiha
11:16 Bug #1243: IBAM - Login
Testing on Ibam Login with attempt 3 times wrongly for password
-There has error message after try login for 4th tim...
Tamanuri Nur Anisah
10:53 Task #1232: IBAM: Password validation
hi,
done testing, everything working in order
Result :-
Password must have minimum 1 alphabet and 1 digit.
Acc...
Abdul Rahman Mohd Ainol Adli
10:31 Task #987: Report module for IBAM
Hafiz, Kindly re-test. TQ Norhaidah Md Dasuki
10:30 Task #1124: IBAM Functional Test - Admin Group Maintenance & Admin Maintenance
Mimi, Kindly retest in SIT. Norhaidah Md Dasuki
10:27 Task #1126 (Work Completed-End life cycle): IBAM Functional Test - IBAM Navigation
Norhaidah Md Dasuki
10:26 Task #1212 (Work Completed-End life cycle): IBAM: Setup Bill Reference Sample Image
Norhaidah Md Dasuki
10:26 Task #1232: IBAM: Password validation
Hi Ainol,
Please test and confirm. TQ
Norhaidah Md Dasuki
10:25 Bug #1242 (Work Completed-End life cycle): User Profile Maintenance
Push to SIT. Norhaidah Md Dasuki
10:23 Bug #1243: IBAM - Login
Hi Anis,
Kindly test and verify. TQ
Norhaidah Md Dasuki

November 01, 2011

13:01 Task #1212: IBAM: Setup Bill Reference Sample Image
Done. Siti Norahayu Mohd Desa
12:58 Bug #1242: User Profile Maintenance
Tested and push to mercurial. Already apply fir sit Siti Norahayu Mohd Desa
11:43 Task #1256 (Work Completed-End life cycle): IBAM - RIB Navigation Searching Function
Related to SIT:Redmine http://10.6.6.20:8080/redmine/issues/110
Currently, there is no searching function in RIB N...
Norhaidah Md Dasuki

October 31, 2011

23:11 Task #987: Report module for IBAM
Please have someone test this Tan Lee Yong
23:10 Task #1232 (Internal Testing): IBAM: Password validation
Please verify and close it if done. Tan Lee Yong
23:09 Task #1212 (Internal Testing): IBAM: Setup Bill Reference Sample Image
Please verify and close this if done Tan Lee Yong
23:08 Bug #1242: User Profile Maintenance
Please confirm this fix Tan Lee Yong
23:06 Bug #1243 (Internal Testing): IBAM - Login
Please verify Tan Lee Yong
23:04 Task #1249: IBAM - Currency Code Image
To upload country images to db. Add a new db field for this. Tan Lee Yong
22:56 Task #1253: IBAM - Audit Log Details
Add before and after value Tan Lee Yong

October 28, 2011

18:20 Task #1253 (Work Completed-End life cycle): IBAM - Audit Log Details
Related to SIT:Redmine - http://10.6.6.20:8080/redmine/issues/105
Issue: Issue No. 2: Detail activity (modificatio...
Norhaidah Md Dasuki
13:44 Task #1249 (Work Completed-End life cycle): IBAM - Currency Code Image
Related to SIT:Redmine - http://10.6.6.20:8080/redmine/issues/62
Test# 12C.3.1 - Create Currency Code Content – ...
Norhaidah Md Dasuki
13:37 Task #1248 (Work Completed-End life cycle): IBAM Payee
Related to SIT:Redmine - http://10.6.6.20:8080/redmine/issues/64
Where/how to place the image? Should have ‘BRO...
Norhaidah Md Dasuki
11:56 Task #1247 (Work Completed-End life cycle): Change Own Password.
Related to SIT:Redmine - http://10.6.6.20:8080/redmine/issues/38

Admin setup parameter for :- password profile, I...
Norhaidah Md Dasuki
11:48 Task #1246 (Work Completed-End life cycle): Admin Maintenance - ID Creation
Related to SIT:Redmine - http://10.6.6.20:8080/redmine/issues/6
To re-use the <Username> which has been deleted. C...
Norhaidah Md Dasuki
11:25 Task #1245 (Work Completed-End life cycle): Admin Group - Access Right
Related to SIT:Redmine (Enhancement)- http://10.6.6.20:8080/redmine/issues/9
Currently: SuperAdmin create one (1) ...
Norhaidah Md Dasuki

October 25, 2011

17:49 Bug #1242 (Internal Testing): User Profile Maintenance
Change Suspend to Lock for front end of User Maintenance Nazri Imran
11:10 Bug #1242: User Profile Maintenance
Completed Test Case# 4.4.5 - Reset Password Admin – Enter Different Password To Confirm Password Nazri Imran
09:58 Bug #1242: User Profile Maintenance
Test Case# 4.4.5 - Reset Password Admin – Enter Different Password To Confirm Password
Result: <Password and confi...
Siti Norahayu Mohd Desa
09:26 Bug #1242: User Profile Maintenance
Completed test case 4.4.2 Nazri Imran

October 24, 2011

15:30 Task #1212: IBAM: Setup Bill Reference Sample Image
Sent email Zainal to request for more sample bill images. Tan Lee Yong
11:28 Bug #1242: User Profile Maintenance
Test Case# 4.4.2 - Reset Password Admin – Enter Empty Value To New Password and/or Confirm Password
Test Script: 3...
Siti Norahayu Mohd Desa
11:15 Bug #1243 (Work Completed-End life cycle): IBAM - Login
Preferable 3rd times key-in wrong password that message appear :
You have reached the maximum number of password att...
Siti Norahayu Mohd Desa
09:42 Bug #1242 (Development / Work In Progress): User Profile Maintenance
Completed all bugs in this list except 4.5 issue.
Currently there are no user state 'Suspend' for the upass. Suspend...
Nazri Imran
09:13 Task #1212 (Development / Work In Progress): IBAM: Setup Bill Reference Sample Image
Below are the list that didnt have URL.
1.Syarikat Air Johor
2.Syarikat Air Pulau Pinang
3.MP Kuantan
4.MP Ampang...
Siti Norahayu Mohd Desa

October 23, 2011

18:10 Bug #1242 (Work Completed-End life cycle): User Profile Maintenance
Kindly check on these issues :
4.1.5 : Enter Numeric To User Name
4.1.9 : Enter Less That 5 Character / Digit To...
Siti Norahayu Mohd Desa
11:18 Task #1126 (System Integration Test): IBAM Functional Test - IBAM Navigation
Tested by Ayu : Passed exclude the Authorization Siti Norahayu Mohd Desa

October 21, 2011

15:42 Task #1239 (Development / Work In Progress): IBAM - subject maintenance - 10 row of data per page
category is done Hafizudin MD
15:41 Task #1236 (Development / Work In Progress): IBAM - Mailbox - 10 message per page
change status Hafizudin MD
15:40 Task #1239 (Work Completed-End life cycle): IBAM - subject maintenance - 10 row of data per page
1) get only 10 data from database per page.. (category , subject , user) Hafizudin MD
15:38 Bug #1238 (Work Completed-End life cycle): IBAM - Payee (SIT Issue)
Hi Gabby,
Kindly assist to check on this issue. (http://10.6.6.20:8080/redmine/issues/63)
Test Ref# 12d - Dsipl...
Norhaidah Md Dasuki
15:36 Task #1236: IBAM - Mailbox - 10 message per page
foreign
1) archive & sent box is finish
2) inbox & notification is need to change mapping & sql. for mapping, ne...
Hafizudin MD
15:25 Task #1236 (Work Completed-End life cycle): IBAM - Mailbox - 10 message per page
1) get only 10 message per page (inbox , sent box , archive , notification).. Hafizudin MD

October 20, 2011

09:42 Task #1212: IBAM: Setup Bill Reference Sample Image
The images are all there, at least what I was given from Lee Yong. However, I think the Payee Content needs to be up... Wong Bernard

October 19, 2011

21:14 Task #1222 (Internal Testing): Add Interbank fields to cater RTGS, IBG and IBFT
Update IB_BANCNET_LIST data (100%)
Be informed there are some of the bank* has same name but different swift code,...
Firdaus Muhammad Riza Aulya
13:31 Task #1212: IBAM: Setup Bill Reference Sample Image
Hi Bernard,
Is it ready for testing? Because we found that some of the payee do not have view sample link like ASTR...
Siti Norahayu Mohd Desa
10:46 Task #1124: IBAM Functional Test - Admin Group Maintenance & Admin Maintenance
Module / Screen: Admin Maintenance
bug 1 : test case 4.15
description : create admin-enter numeric to user id
de...
Misran Mimi Zulaiha

October 18, 2011

20:18 Task #1232 (Work Completed-End life cycle): IBAM: Password validation
Password must have minimum 1 alphabet and 1 digit.
Accept all others except these characters [\"<>'%;&+]
Tan Lee Yong
16:43 Task #1042 (Development / Work In Progress): IBAM - Compose & Send Notificattion
Staging:
Issues highlighted still not been fixed.
1. "expiry date" words in Notification to All User is not in one ...
Norhaidah Md Dasuki
16:10 Task #1042: IBAM - Compose & Send Notificattion
1- Composed message in IBAM not in text wrapped.
2- In compose message,filter by criteria- select recipient. when we...
Ibrahim Mohd Khairul Raffiqin
14:20 Task #1042: IBAM - Compose & Send Notificattion
Khairul,
Kindly review and do re-test.
Norhaidah Md Dasuki
14:16 Task #1124: IBAM Functional Test - Admin Group Maintenance & Admin Maintenance
Mimi,
Kindly test based on the test script. TQ
Norhaidah Md Dasuki
13:28 Task #1124 (Internal Testing): IBAM Functional Test - Admin Group Maintenance & Admin Maintenance
fix - change result message Hafizudin MD
12:19 Task #1137 (Work Completed-End life cycle): IBAM Functional Test - Secure Mailbox – Archiving F...
for archive module - we don't have check box Hafizudin MD
12:14 Task #1042 (Internal Testing): IBAM - Compose & Send Notificattion
please testing this issue Hafizudin MD
12:11 Task #987: Report module for IBAM
waiting hadi to finish this module Hafizudin MD
12:10 Task #924 (Work Completed-End life cycle): IBAM Security Questions
tested by hafiz
status passed
Hafizudin MD
12:06 Task #1116 (Work Completed-End life cycle): Admin-Maker Checker
this has been test by me Hafizudin MD
12:03 Task #1135 (Work Completed-End life cycle): IBAM Functional Test - Secure Mailbox – Send Notifi...
close issue Hafizudin MD
12:02 Bug #1150: IBAM: Group & Subject issues
please test Hafizudin MD

October 17, 2011

23:13 Task #1222: Add Interbank fields to cater RTGS, IBG and IBFT
Fixed null input (error when user register new bank with null field of rentas, ibg, and ibft)
fixed layout (GUI) (sh...
Firdaus Muhammad Riza Aulya
17:48 Task #1126 (Internal Testing): IBAM Functional Test - IBAM Navigation
Hi Ayu,
Please test this issue
Tan Lee Yong
15:32 Task #1126 (Pending Review): IBAM Functional Test - IBAM Navigation
Completed the IBAM Navigation offline/online enable Nazri Imran
11:34 Task #1135 (User Acceptance Test): IBAM Functional Test - Secure Mailbox – Send Notification
all issue has been fix Hafizudin MD

October 16, 2011

17:05 Task #1157 (Work Completed-End life cycle): IBAM: Check Digit Data Object
Tan Lee Yong
17:04 Task #1157 (Pending Review): IBAM: Check Digit Data Object
Tan Lee Yong
17:04 Task #1157 (Development / Work In Progress): IBAM: Check Digit Data Object
done. pending on front end testing Tan Lee Yong
17:01 Task #1133 (Work Completed-End life cycle): IBAM Functional Test - IBAM Content - Notice
Tan Lee Yong
17:01 Task #1128 (Work Completed-End life cycle): IBAM Functional Test - IBAM Content - Interbank List
Tan Lee Yong
17:00 Bug #1088 (Work Completed-End life cycle): IBAM RIB Navigation
Tan Lee Yong
17:00 Bug #1027 (Work Completed-End life cycle): IBAM - RIB Transaction Enquiry
Tan Lee Yong
16:59 Bug #1019 (Work Completed-End life cycle): IBAM Admin Enquiry
Tan Lee Yong
16:59 Task #925 (Work Completed-End life cycle): IBAM Mailbox Listing
Tan Lee Yong
16:58 Bug #1142 (Work Completed-End life cycle): Content Data not Save
Tan Lee Yong
16:57 Task #1009 (Work Completed-End life cycle): IBAM: Compile Test Script
Tan Lee Yong
16:57 Task #1009 (Pending Review): IBAM: Compile Test Script
Tan Lee Yong
16:56 Task #1045 (Work Completed-End life cycle): IBAM Notification Read Message
Tan Lee Yong
16:55 Bug #1024 (Work Completed-End life cycle): IBAM - Admin Navigation
Tan Lee Yong
16:55 Bug #1025 (Work Completed-End life cycle): IBAM - IB User Group
Tan Lee Yong
16:53 Bug #1026 (Work Completed-End life cycle): IBAM - RIB User Enquiry
Tan Lee Yong
16:53 Bug #1018 (Work Completed-End life cycle): IBAM Admin Group
Fixed by Nazri & Danniell Tan Lee Yong
16:52 Bug #1028 (Work Completed-End life cycle): IBAM - Audit Log
Tan Lee Yong
16:51 Task #1007 (Work Completed-End life cycle): IBAM Reply Message
Tan Lee Yong
16:50 Task #1089 (Work Completed-End life cycle): IBAM - Audit Log for Secure Mailbox
Tan Lee Yong
16:50 Task #1090 (Work Completed-End life cycle): IBAM Change Own Password
Tan Lee Yong
16:49 Task #1090 (Pending Review): IBAM Change Own Password
Tan Lee Yong
16:45 Task #1104 (Work Completed-End life cycle): RIB- Maker Checker
Tan Lee Yong
16:44 Task #936 (Work Completed-End life cycle): IBAM Mailbox Print feature
Tan Lee Yong
16:43 Task #1169 (Work Completed-End life cycle): IBAM: Password validation and clear cache issue
Tan Lee Yong
16:43 Task #1222: Add Interbank fields to cater RTGS, IBG and IBFT
Please also do the front end GUI. Tan Lee Yong
16:41 Task #1134 (Work Completed-End life cycle): IBAM Functional Test - RIB User Enquiry + Mobile Number
Tan Lee Yong
16:40 Task #1138 (Work Completed-End life cycle): IBAM Functional Test - Secure Mailbox – Subject Mai...
Closed. New task will be opened at Agrobank site Tan Lee Yong
16:40 Task #1140 (Work Completed-End life cycle): RIB Functional Test - Retrieve Username Test
Closed. New task will be opened at Agrobank site Tan Lee Yong
16:39 Task #1151 (Work Completed-End life cycle): IBAM: Logo & Wallpaper enhancement
Tan Lee Yong
16:38 Task #1155 (Work Completed-End life cycle): IBAM: Check Digit Core
Completed. Pending on application site testing. Tan Lee Yong
16:38 Task #1155 (Pending Review): IBAM: Check Digit Core
Tan Lee Yong
16:37 Task #1155 (Development / Work In Progress): IBAM: Check Digit Core
Tan Lee Yong
16:37 Task #1160 (Work Completed-End life cycle): IBAM: Summarize all Payee Check Digit Formula
Tan Lee Yong
16:36 Task #1160 (Pending Review): IBAM: Summarize all Payee Check Digit Formula
Tan Lee Yong
16:34 Task #1156 (Internal Testing): IBAM: Check Digit GUI
Tan Lee Yong
16:33 Task #1129 (Work Completed-End life cycle): IBAM Functional Test - IBAM Content - Bank Branch List
Consider done Tan Lee Yong
16:31 Bug #1017 (Work Completed-End life cycle): IBAM Content
Fixed by Hafiz & Hadi Tan Lee Yong
16:29 Task #1130 (Work Completed-End life cycle): IBAM Functional Test - IBAM Content - Currency Code
Fixed by Hadi & Hafiz Tan Lee Yong
16:27 Task #1212 (Internal Testing): IBAM: Setup Bill Reference Sample Image
Hi Ayu,
Please get this test done by 17/10/2011.
Tan Lee Yong
16:24 Task #934 (Work Completed-End life cycle): IBAM Archive Feature
done Tan Lee Yong
16:23 Task #927 (Work Completed-End life cycle): IBAM Inbox Read Message
Done Tan Lee Yong
16:21 Task #928 (Work Completed-End life cycle): IBAM Sent Box Read Message
done Tan Lee Yong
16:20 Task #937 (Work Completed-End life cycle): IBAM Subject Maintenance
Tan Lee Yong
16:20 Task #937 (Pending Review): IBAM Subject Maintenance
Fix by Hafiz Tan Lee Yong
16:18 Task #1072 (Work Completed-End life cycle): IBAM Pagination
done Tan Lee Yong
16:17 Task #1136 (Work Completed-End life cycle): IBAM Functional Test - Secure Mailbox – Inbox & Rep...
Resolved by Hafiz Tan Lee Yong
16:14 Task #1135: IBAM Functional Test - Secure Mailbox – Send Notification
Hafiz, please look into this Tan Lee Yong
16:13 Task #1137 (Development / Work In Progress): IBAM Functional Test - Secure Mailbox – Archiving ...
Hafiz, please check Tan Lee Yong
16:12 Task #1124 (Development / Work In Progress): IBAM Functional Test - Admin Group Maintenance & Adm...
Hafiz please take a look. Tan Lee Yong
16:10 Task #921 (Closed - End of life cycle): IBAM Add identity image, phrase, ip and 2nd password
Tan Lee Yong
16:09 Task #926 (Pending Review): IBAM: Upgrade user profile for call support
Tan Lee Yong
16:08 Bug #1100 (Work Completed-End life cycle): IBAM - login
Assumed completed. No update. Tan Lee Yong
16:06 Task #1126 (Development / Work In Progress): IBAM Functional Test - IBAM Navigation
Transfer to Nazri, the problem still assist. Tan Lee Yong
16:04 Task #989 (Dropped-End of life cycle): IB Reports - Clean Up
Changed to use Jasper Report Tan Lee Yong
16:04 Task #989 (Pending Review): IB Reports - Clean Up
Tan Lee Yong
16:03 Task #1125 (Work Completed-End life cycle): IBAM Functional Test - RIB Report
Assumed completed. No update. Tan Lee Yong
16:02 Task #1131 (Work Completed-End life cycle): IBAM Functional Test - IBAM Content - Payee
Assumed completed. No update. Tan Lee Yong
16:01 Task #1090: IBAM Change Own Password
Assumed completed. No update. Tan Lee Yong
16:01 Task #1127 (Work Completed-End life cycle): IBAM Functional Test - RIB Navigation
Assumed completed. No update. Tan Lee Yong
15:52 Task #984 (Work Completed-End life cycle): IBAM: Table Design
Assumed completed. No update. Tan Lee Yong
15:51 Task #984 (Pending Review): IBAM: Table Design
Tan Lee Yong
 