Activity
From March 23, 2016 to April 21, 2016
April 21, 2016
- 12:11 Enhancement #5562: [UAT3-9 - UAT_246] Post Event >> JPPPA Report
- Hi ayu,
4. Fast Fact - No. of Programme By Status
# Try to ask user which user they use for login the tpms system...
April 20, 2016
- 18:09 Change #5951 (Development / Work In Progress): [UAT1&2 - UAT_109] - Report Planning JPPPA >> List...
- *Test Result:*
Report Planning JPPPA >> List of Promotion Programme By All Ministries and Agencies
1) Generate ... - 17:06 Bug #6207 (Work Completed-End life cycle): Planning >> Activities List - Total Sales Generated
- To check on Data query for "Total Sales Generated" column.
Used below event as reference to ensure data is correct... - 16:37 Change #6054 (Development / Work In Progress): [UAT1&2 - UAT_122] - Planning >> Activities List
- *Test on Label:*
+A) Planning>Activities List - Export as (xls and pdf)+
1. Change "Total Generated Sales" to "To... - 15:06 Enhancement #5452 (Development / Work In Progress): [UAT1&2 - UAT_115] - Report >> Generate Word ...
- Tested & Passed for module 1&2.
Unable to highlight Header and Grand Total Background. Ms Word not support.
New... - 12:06 Enhancement #5742 (Pending Customer Feedback): [UAT3-9 - UAT_017 & UAT_018] - Dashboard > JPPPA
- For JPPPA Dashboard, we encountered a problem where the actual sales from Matrade does not display.
Pending from Ma... - 11:50 Enhancement #5724 (Pending Customer Feedback): [UAT3-9 - UAT_017] - Dashboard > JPPPA
- For JPPPA Dashboard, we encountered a problem where the actual sales from Matrade does not display.
Pending from Ma... - 11:42 Enhancement #5870 (Development / Work In Progress): [UAT3-9 - UAT_151] - Dashboard
- HI Kak Haida,
This issue related to Bug #6191. This will be test once the fixes was completed.
Hi Adit,
I ha... - 11:32 Bug #6173 (Development / Work In Progress): Dashboard - Overall
- Issue reported tested and passed.
Hi Adit,
Based on email replied by En. Rizal "UAT Conditional Sign Off - ... - 11:25 Bug #6183: Dashboard - Impact - Sales
- > *IMPACT - TARGET SALES VS SALES GENERATED - BY PROGRAMME TYPE IN 2016*
>
> +Download data (CSV, XLXS)+
> # Tim... - 10:54 Bug #6183 (Development / Work In Progress): Dashboard - Impact - Sales
- Salam Adit,
The xlsx file format must be same like CSV format.
- 10:39 Bug #6185 (Development / Work In Progress): Dashboard - JPPPA
- 10:27 Bug #6185: Dashboard - JPPPA
- *Number of Programme by Sector*
Sort Sector alphabetically.
*Number of Programme by Ministry*
Sort Sector alp...
April 19, 2016
- 12:24 Bug #6092 (Work Completed-End life cycle): Planning >> Activities List
- 12:23 Enhancement #5451 (Development / Work In Progress): [UAT1&2 - UAT_114] - All Module >> Table Hea...
- 11:56 Bug #6191 (Development / Work In Progress): Dashboard - Budget
- Hi Adit,
The time-stamp for maps still not available
April 18, 2016
- 18:38 Bug #6191 (Internal Testing): Dashboard - Budget
- Bug fixed please retest
- 18:36 Bug #6173 (Internal Testing): Dashboard - Overall
- Bug fixed please retest
- 18:36 Bug #6183 (Internal Testing): Dashboard - Impact - Sales
- Bug fixed please retest
- 17:31 Enhancement #5562 (Development / Work In Progress): [UAT3-9 - UAT_246] Post Event >> JPPPA Report
- Hi Jeng Wei,
Kindly fix on issue below. Thank you
12/4/2016 [Helmi]:-
*4. Fast Fact - No. of Programme By Stat... - 17:17 Enhancement #5871 (Pending Prod Deployment): [UAT3-9 - UAT_174] - Post Event >> JPPPA Report
- 8/4/2016 - already test. To close
Pending for production deployment - 17:12 Enhancement #5848 (Pending Prod Deployment): [UAT3-9 - UAT_157] - Post Event > Programmes > Feedb...
- 12/4/2016 [KD] - Closed
Pending for production deployment - 17:09 Enhancement #6202 (Closed - End of life cycle): [UAT3-9 - UAT_218] - Promotion >> Registration - ...
- To include salutation in import from excel script.
6/4/2016 - This issue has been log as Production issue due to u... - 16:29 Bug #6201 (Work Completed-End life cycle): Dashboard - Programme
- *Number of Approved Event by Programme Type*
- Color assigned for each programme type must be standard with Overall ... - 15:14 Bug #6191 (Development / Work In Progress): Dashboard - Budget
- Hi Adit,
Time-stamp for all download images not display
HI Kak Haida,
Please be informed below issue ne...
April 15, 2016
- 19:32 Bug #6183 (Development / Work In Progress): Dashboard - Impact - Sales
- Hi Adit,
*IMPACT - TARGET SALES VS SALES GENERATED - BY PROGRAMME TYPE IN 2016*
+Download data (CSV, XLXS)+
... - 16:16 Bug #6173 (Development / Work In Progress): Dashboard - Overall
- - The time-stamp should be at the bottom of the chart or page.
Please apply at :
* Programme Type by Status & Sec... - 11:36 Bug #6173 (Internal Testing): Dashboard - Overall
- bug fixed please retest and check
- 11:35 Bug #6183 (Internal Testing): Dashboard - Impact - Sales
- bug fixed please retest
- 11:35 Bug #6191 (Internal Testing): Dashboard - Budget
- Please retest list of the fixes
Description
-1. ‘Download as image’ (PNG, JPG, SVG, and PDF). Please hide SVG. Pl... - 11:18 Enhancement #5452 (Internal Testing): [UAT1&2 - UAT_115] - Report >> Generate Word Report
- +Planning Report> Summary of Work Programme+
# Column title and Grand Total Label should be displayed.
+Budget Re...
April 14, 2016
- 18:57 Bug #6183 (Development / Work In Progress): Dashboard - Impact - Sales
- Hi Adit,
For TOP GROSSING COMPANIES FOR TRADE FAIR IN 2016 please change Event name to Company Name. - 18:54 Bug #6191 (Work Completed-End life cycle): Dashboard - Budget
- 1. ‘Download as image’ (PNG, JPG, SVG, and PDF). Please hide SVG. Please apply to budget utilized as well.
2. Make... - 18:08 Bug #6173 (Development / Work In Progress): Dashboard - Overall
- 17:46 Bug #6173: Dashboard - Overall
- > h1. *OVERALL*
>
> *Approved Budget – Overall by Budget Type*
> -OTHERS – Label for Others not display IN Pie c...
April 13, 2016
- 19:17 Bug #6183 (Internal Testing): Dashboard - Impact - Sales
- 19:17 Bug #6183: Dashboard - Impact - Sales
- bug fixed please retest
- 19:16 Bug #6185 (Internal Testing): Dashboard - JPPPA
- bug fixed please retest
- 16:31 Bug #6190 (Dropped-End of life cycle): Planning >> Activities List >> Export as
- Total Sales Generated value at export as display missing number.
Actual Result:
At Activities List display xxx,x... - 15:59 Enhancement #5451 (Pending Review): [UAT1&2 - UAT_114] - All Module >> Table Header Sorting
- Hi Adit,
+*PLANNING*+
*Activity List*
- for select 2 selection sort by DESC is NOT working
*Planning JPPPA*
...
April 12, 2016
- 18:23 Change #6054 (Internal Testing): [UAT1&2 - UAT_122] - Planning >> Activities List
- Label has been updated. Please verify.
- 18:19 Change #5951 (Internal Testing): [UAT1&2 - UAT_109] - Report Planning JPPPA >> List of Promotion ...
- Latest template has been updated. Please verify column remark in JPPPA report List of Promotion Programme By All Mini...
- 16:54 Change #6054 (Development / Work In Progress): [UAT1&2 - UAT_122] - Planning >> Activities List
- Najmi, Kindly assist to fix below issue:-
*Planning>Activities List - Export as (xls and pdf)*
>1. Change "Total ... - 15:55 Change #5952 (Pending Prod Deployment): [UAT1&2 - UAT_120] - Administrator >> User Management
- 8/4/2016 [KD] - Successfully tested and Closed
- 15:53 Enhancement #5451 (Internal Testing): [UAT1&2 - UAT_114] - All Module >> Table Header Sorting
- Leo, Kindly assist to recheck on the issue reported.
(8/4/2016 - [KD] - Function sorting not working.) - 15:24 Change #5951 (Development / Work In Progress): [UAT1&2 - UAT_109] - Report Planning JPPPA >> List...
- 8/4/2016 [KD] - Column/field Remarks not found
Najmi, kindly assist to recheck. Its already successfully test on ... - 15:14 Change #5950 (Pending Prod Deployment): [UAT1&2 - UAT_108] - Planning JPPPA
- 8/4/2016 [KD] - Successfully tested and Closed
Pending production deployment - 15:13 Enhancement #5450 (Pending Prod Deployment): [UAT1&2 - UAT_106] - Report Time Stamp
11/4/2016 [KD] - Successfully tested and Closed
Pending Production deployment.- 15:08 Change #5948 (Pending Prod Deployment): [UAT1&2 - UAT_100] - Planning >> Activities List
- [KD] - All done except To change JPPPA to new name
Pending Prod Deployment - 14:47 Change #5867 (Pending Prod Deployment): [UAT1&2 - UAT_097] - Planning >> Planning Report >> Overa...
- 11/4/2016 [Fadzilah] - Successfully tested and Closed
Pending Pro Deployment - 14:45 Change #5865 (Pending Prod Deployment): [UAT1&2 - UAT_092] - Planning >> Activities List
- 11/4/2016 [Fadzilah] - Successfully tested and Closed
Pending Pro Deployment - 14:43 Enhancement #5449 (Pending Prod Deployment): [UAT1&2 - UAT_088] - Search Filter >> Date Range
- 11/4/2016 [Fadzilah] - Successfully tested and Closed
Pending Pro Deployment - 14:41 Enhancement #5448 (Pending Prod Deployment): [UAT1&2 - UAT_050] - Administration >> Audit Trail
- 11/4/2016 [Fadzilah] - Successfully tested and Closed
Pending Pro Deployment - 14:39 Enhancement #5447 (Pending Prod Deployment): [UAT1&2 - UAT_027] - Planning >> KPI Setting >> View...
- 11/4/2016 [Fadzilah] - Successfully tested and Closed
Pending Pro Deployment - 13:45 Bug #6185 (Work Completed-End life cycle): Dashboard - JPPPA
- 1. Number of Programme by Ministry
- Data for particular ministry not tally with system
2. Impact by Ministry – ...
April 11, 2016
- 19:05 Enhancement #5449 (Internal Testing): [UAT1&2 - UAT_088] - Search Filter >> Date Range
- date bug fixed, please retest
- 19:04 Enhancement #5453 (Internal Testing): [UAT1&2 - UAT_048 & 049] - Planning & Planning JPPPA >> Act...
- request on checklist done, please retest
- 19:04 Bug #6173 (Internal Testing): Dashboard - Overall
- Bug on checklist fixed, please retest
- 17:37 Bug #6183 (Work Completed-End life cycle): Dashboard - Impact - Sales
- h1. Impact – Sales
*Target Sales vs Sales Generated – by Programme Type*
1. Bar chart for Target Sales vs Sales G... - 17:05 Enhancement #6175 (Internal Testing): Planning >> Reports >> Budget Reports - RINGKASAN PERBELANJ...
- Hi ayu ,
Add back the no section Values. The values for each programme Type is based on years just like the bud... - 13:01 Enhancement #5665 (Pending Prod Deployment): [M3-9/050] - Post Event >> Programmes (UAT3-9/251)
- 8/4/2016 - already test. To close
Pending production deployment - 12:58 Enhancement #5654 (Pending Prod Deployment): [M3-9/039] - Publication >> Edit Write Up (UAT3-9/248)
- 8/4/2016 - already test. To close
Pending production deployment - 12:52 Enhancement #5838 (Pending Prod Deployment): [UAT3-9 - UAT_160]- Post Event > Programmes > Feedba...
- 8/4/2016 - Default currency to USD for INSP
Pending for Production deployment. - 12:51 Enhancement #5849 (Pending Prod Deployment): [UAT3-9 - UAT_159] - Post Event > Event Report > Loc...
- 8/4/2016 [Azliza] - already test. To close
Pending for Production deployment. - 12:23 Enhancement #5831 (Pending Prod Deployment): [UAT3-9 - UAT_093] - Promotion > Business Meeting
- 8/4/2016 [Azliza] - already test.
Pending for Prod. Deployment.
April 08, 2016
- 16:34 Enhancement #6175 (Work Completed-End life cycle): Planning >> Reports >> Budget Reports - RINGKA...
- Report not cater "NO SECTION" value.
Please cater "NO SECTION" value for all budget type. - 16:05 Enhancement #5866 (User Acceptance Test): [UAT1&2 - UAT_098] - Planning >> Planning Report >> Ove...
- 8/4/2016 - Send for SIT/UAT
- 16:03 Enhancement #6047 (User Acceptance Test): [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work...
- 8/4/2016 - Send for SIT/UAT
- 15:58 Enhancement #5449 (Development / Work In Progress): [UAT1&2 - UAT_088] - Search Filter >> Date Range
- Hi Adit,
Execution > Report > Date range - starts from 2006
Post Event > JPPPA Programmes - starts from 2013
Pos... - 13:07 Enhancement #6047 (Pending Review): [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Progr...
- Hi Akak,
Please find test result as per attached. - 12:54 Enhancement #5866 (Pending Review): [UAT1&2 - UAT_098] - Planning >> Planning Report >> Overall S...
- Hi akak,
Please find test result as per attached. - 12:19 Enhancement #5449: [UAT1&2 - UAT_088] - Search Filter >> Date Range
- HI Leo,
Kindly assist to prepare the test result. TQ - 12:13 Enhancement #5453 (Development / Work In Progress): [UAT1&2 - UAT_048 & 049] - Planning & Plannin...
- 5/4/16 - Show to En. Rizal on the fixes and need to do some modification on the name of event display at the calendar...
April 07, 2016
- 17:57 Bug #6173 (Work Completed-End life cycle): Dashboard - Overall
- h1. *OVERALL*
*Approved Budget – Overall by Budget Type*
OTHERS – Label for Others not display IN Pie chart. Ple... - 15:12 Enhancement #6047 (Internal Testing): [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Pro...
- Hi Ayu ,
Please retest after deployed to Enhancement Branch. Thanks a lot.
April 06, 2016
- 18:16 Enhancement #5837: [UAT3-9 - UAT_158] - Post Event > Programmes > Feedback > List By Company > Edit
- 25/3/16 [Helmi] - Tested add multiple, delete one and delete multiple option for multiple sales feedback. Case closed
- 18:10 Enhancement #5665 (User Acceptance Test): [M3-9/050] - Post Event >> Programmes (UAT3-9/251)
- 6/4/2016 - Send for SIT/UAT
(refer Bug #6169 - which related to JPA Feedback form)
April 05, 2016
- 17:55 Enhancement #5562: [UAT3-9 - UAT_246] Post Event >> JPPPA Report
- 5/4/2016 - Send for SIT/UAT via email dated Wed, Feb 15, 2016. Resend for retest.
- 17:34 Enhancement #5934 (Work Completed-End life cycle): Local Trade Fair > top 5/10 product and servic...
- 17:33 Enhancement #5831: [UAT3-9 - UAT_093] - Promotion > Business Meeting
- 5/4/2016 - Send for SIT/UAT via email dated Wed, Feb 15, 2016. Resend for retest.
- 17:32 Enhancement #5838: [UAT3-9 - UAT_160]- Post Event > Programmes > Feedback > List by Company
- 5/4/2016 - Send for SIT/UAT via email dated Wed, Feb 15, 2016. Resend for retest.
- 14:59 Enhancement #5849 (User Acceptance Test): [UAT3-9 - UAT_159] - Post Event > Event Report > Local ...
- 5/4/16 - Completed and send for SIT/UAT. Use Event: MIHAS 2014 Simulation as test cases.
- 14:38 Enhancement #5870 (Internal Testing): [UAT3-9 - UAT_151] - Dashboard
- Ayu, kindly assist to test.
- 14:37 Enhancement #5871: [UAT3-9 - UAT_174] - Post Event >> JPPPA Report
- 5/4/2016 - Send for SIT/UAT via email dated Wed, Feb 15, 2016. Resend for retest.
April 04, 2016
- 18:15 Enhancement #6047: [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Programme
- investigate the font size of jasper report because cannot display tally.
April 01, 2016
- 18:13 Enhancement #5453: [UAT1&2 - UAT_048 & 049] - Planning & Planning JPPPA >> Activities List - Cale...
- *please test at Enhancement Environment
- 18:12 Enhancement #5453 (Internal Testing): [UAT1&2 - UAT_048 & 049] - Planning & Planning JPPPA >> Act...
- List changes implemented on the system
* When click or roll-over at the event name, it should pop-up the event detai... - 18:06 Enhancement #5449 (Internal Testing): [UAT1&2 - UAT_088] - Search Filter >> Date Range
- For this changes, already apply since last enhancement branch testing. current version already has this changes
- 16:01 Enhancement #5654: [M3-9/039] - Publication >> Edit Write Up (UAT3-9/248)
- notes: this enhancement has already exist in Prod. branch
5/4/2016 - Send for SIT/UAT via email dated Wed, Feb 15,...
March 31, 2016
- 10:57 Enhancement #5628 (Development / Work In Progress): [M3-9/019] - Promotion >> Registration Form I...
- Adit, kindly verify on the feedback from Chee Onn. If possible to please proceed. TQ
- 10:51 Enhancement #5742 (Internal Testing): [UAT3-9 - UAT_017 & UAT_018] - Dashboard > JPPPA
- Ayu, kindly assist to test
- 10:49 Enhancement #5724 (Internal Testing): [UAT3-9 - UAT_017] - Dashboard > JPPPA
- Ayu, Kindly assist to test.
March 30, 2016
- 18:24 Enhancement #6047 (Pending Customer Feedback): [UAT1&2 - UAT_105] - Report Planning >> Summary Of...
- Jasper Report limitation so Initiative budget cannot display in dynamic method in end of report.
New r_specialProgr... - 17:47 Enhancement #5866 (Internal Testing): [UAT1&2 - UAT_098] - Planning >> Planning Report >> Overall...
- Hi Ayu,
I test ok with Enhancement Branch. Please ask for futher detail regarding this. Thanks a lot - 17:47 Enhancement #5934 (Pending Review): Local Trade Fair > top 5/10 product and service by hall
- test result attached
- 16:40 Enhancement #5934: Local Trade Fair > top 5/10 product and service by hall
- HI Leo,
Kindly assist. - 16:35 Enhancement #5866 (Development / Work In Progress): [UAT1&2 - UAT_098] - Planning >> Planning Rep...
- Hi Jeng Wei,
Programme Type & Budget Type value display "null". Please assist. - 16:17 Change #5867 (User Acceptance Test): [UAT1&2 - UAT_097] - Planning >> Planning Report >> Overall ...
- Issue have been tested by Aishah. For data issue please refer Redmine #6047
- 16:10 Enhancement #5452: [UAT1&2 - UAT_115] - Report >> Generate Word Report
- Hi Najmi,
Kindly assist to fix on the below issues:-
+Planning Report> Summary of Work Programme+
1. Column... - 16:05 Enhancement #6047 (Development / Work In Progress): [UAT1&2 - UAT_105] - Report Planning >> Summa...
- 3. a)To add tittle Summary By Budget Type– Test on 25032016 fixed but do not bold the tittle
c) Initiative b... - 15:59 Enhancement #5449 (Development / Work In Progress): [UAT1&2 - UAT_088] - Search Filter >> Date Range
- New Request :
TPMS will display detail search based on fixed starting year 2002 for Planning and Planning JPPPA. ...
March 29, 2016
- 17:50 Enhancement #5453 (Development / Work In Progress): [UAT1&2 - UAT_048 & 049] - Planning & Plannin...
- From: rizal@matrade.gov.my
Mar 18 (11 days ago)
# When click or roll-over at the event name, it should pop-up th...
March 28, 2016
- 13:46 Enhancement #5724: [UAT3-9 - UAT_017] - Dashboard > JPPPA
- for the map still cant download with legend, found bug have discuss with amchart staff havent solve the issue.
Enh... - 13:46 Enhancement #5870: [UAT3-9 - UAT_151] - Dashboard
- for the map still cant download with legend, found bug have discuss with amchart staff havent solve the issue.
Enh... - 13:45 Enhancement #5742: [UAT3-9 - UAT_017 & UAT_018] - Dashboard > JPPPA
- for the map still cant download with legend, found bug have discuss with amchart staff havent solve the issue.
Enh...
March 25, 2016
- 18:17 Enhancement #5934 (Internal Testing): Local Trade Fair > top 5/10 product and service by hall
- Hi Ayu,
Fixes already done by jengwei on yesterday and deployed to UAT environment. Please try again.
Thank you. - 11:14 Change #5867: [UAT1&2 - UAT_097] - Planning >> Planning Report >> Overall Summary >> Summary of W...
- added information from Kak Aisah
- 11:14 Enhancement #5452: [UAT1&2 - UAT_115] - Report >> Generate Word Report
- added information from Kak Aisah
- 11:14 Enhancement #6047: [UAT1&2 - UAT_105] - Report Planning >> Summary Of Work Programme
- added information from Kak Aisah
March 23, 2016
- 17:02 Enhancement #5848: [UAT3-9 - UAT_157] - Post Event > Programmes > Feedback > List by Company
- Issue have been changed from CR to Enhancement on 19/2/2016
- 13:10 Enhancement #5849 (Pending Review): [UAT3-9 - UAT_159] - Post Event > Event Report > Local Trade ...
- test result attached
- 12:11 Enhancement #5452 (Development / Work In Progress): [UAT1&2 - UAT_115] - Report >> Generate Word ...
- Hi Najmi,
i found issue for 2 report
1. Budget Report > JPKA-Activity yang telah dijalankan
- did not down...