Activity

From December 07, 2010 to January 05, 2011

January 05, 2011

18:32 Bug #688 (Development / Work In Progress): bug - FundsTransfer - Own Funds Transfer
Hafizudin MD
18:29 Bug #695 (Development / Work In Progress): bug - Bills Payment - Make a Payment to a Favourite Payee
Tested by hafiz
status failed
bug report
server site
1) Step 2/4 click go back hyperlink - get this error "...
Hafizudin MD
18:23 MPI Retail Banking System Task #677 (Development / Work In Progress): Check Warehousing
Done and double checking the FS and requirement doc to confirm it is correct Sarinah Darsy
18:23 MPI Retail Banking System Task #676 (Development / Work In Progress): Check Cutting
Done and double checking the FS and requirement doc to confirm it is correct Sarinah Darsy
18:14 MPI Retail Banking System Task #672: Personal Loan Application
1)add property to ESBRequestPersonalLoan Application, put all setters and getters
2)insert some necessary javascript...
Wijayanti Nitya
18:10 M2U Support System Revision 34:138b60cec750: (no commit message)
Cheang Danniell
18:07 MPI Retail Banking System Task #682: MPI Phase1b: Time Deposit Inquiry
Done.
Need to create navigation for TD
Ang Wei Cheng
17:58 Bug #688 (Work Completed-End life cycle): bug - FundsTransfer - Own Funds Transfer
i found no bug.. can add these thing..to make this module same as other.
1) Step 2/3 need "Or" between confirm but...
Hafizudin MD
17:17 Bug #690 (Work Completed-End life cycle): bug - Funds Transfer - Favourite 3rd Party Account Tran...
tested by hafiz
status passed
Hafizudin MD
17:10 Task #678: MPI Phase1a: SIT
1. Fixed numerous FE bugs based on Hafiz report
2. Changed cifCode rule to accept lower case
3. Fixed compilation e...
Wong Bernard
17:03 Bug #695 (Internal Testing): bug - Bills Payment - Make a Payment to a Favourite Payee
Done.
The caused was that the default TAC value used for Favourite transfer was 0000. Should be 000000.
Wong Bernard
16:53 Bug #688 (Internal Testing): bug - FundsTransfer - Own Funds Transfer
Done Wong Bernard
15:36 Bug #690 (Internal Testing): bug - Funds Transfer - Favourite 3rd Party Account Transfer
Done.
"Error while performing your request" error caused by To Accounts in the drop down menu having account numbe...
Wong Bernard
14:03 Bug #690 (Development / Work In Progress): bug - Funds Transfer - Favourite 3rd Party Account Tra...
tested by hafiz
status failed
*
bug report*
1) get this page - Error while performing your request
*De...
Hafizudin MD
13:45 Bug #687 (Work Completed-End life cycle): bug - Account Inquiry
tested by hafiz
status passed
Hafizudin MD
13:31 Bug #689: bug - Funds Transfer - New 3rd Party Account Transfer

tested by hafiz
status failed
bug report
other error
1) Step 2/3 need "Or" between confirm button & go...
Hafizudin MD
13:09 Bug #692 (Work Completed-End life cycle): bug - Funds Transfer - Favourite Interbank Transfer
tested by hafiz
status : passed
Hafizudin MD
12:02 Bug #691: bug - Funds Transfer - New Interbank Transfer
delay testing
client site
1) Enter empty no TAC NO - got this message (TAC must consist of 6 characters.) - corre...
Hafizudin MD
12:00 Bug #694: bug - Bills Payment - Make a one–off Payment
tested by hafiz
status failed
*new bug report*
client site
1) Enter empty no TAC NO - got this message (TAC...
Hafizudin MD
11:32 Task #678: MPI Phase1a: SIT
Already fixed and commit last week. =) Ang Wei Cheng
11:28 Bug #693: bug - Transfer - Cash Card Top Up

delay testing - vincent to fix it
client site
1) Enter empty no TAC NO - got this message (TAC must consist of 6 ...
Hafizudin MD
10:57 Bug #688 (Development / Work In Progress): bug - FundsTransfer - Own Funds Transfer
bug report
from FS - "from account" should be Populated if the customer select ‘Transfer’ from Account Details...
Hafizudin MD
10:42 Task #678: MPI Phase1a: SIT
checked at IB Test script from dennis reported that:
SIT error at Bill Payment - Manage
Description:
Test scen...
Sarinah Darsy
10:06 Bug #697 (Development / Work In Progress): bug - Bills Payment - Manage Future Payment
tested by hafiz
Ststus failed
new bug report
1) need "or" between (confirm & Go Back) and (Print & Back to pay...
Hafizudin MD

January 04, 2011

18:51 Bug #695: bug - Bills Payment - Make a Payment to a Favourite Payee
Hi Bernard, I have checked and ESBRequestFavBillPaymentBean doesn't require TAC. You can run the ESBBillPaymentServic... Tan Lee Yong
18:06 MPI Retail Banking System Task #672: Personal Loan Application
1)add confirm page
2)displaying all input at confirm page
3)add constant for personal loan services
4)repair bugs ...
Wijayanti Nitya
18:00 MPI Retail Banking System Task #675 (Development / Work In Progress): Check Book Reorder
Done and double checking the FS and requirement doc to confirm it is correct Sarinah Darsy
17:09 Bug #692 (Internal Testing): bug - Funds Transfer - Favourite Interbank Transfer
Wong Bernard
17:07 Bug #693 (Internal Testing): bug - Transfer - Cash Card Top Up
Done Wong Bernard
16:39 Bug #696 (Development / Work In Progress): bug - Bills Payment - Manage My Favourite Payees
tested by hafiz
status failed
*bug report*
*client site*
1) Enter empty no TAC NO - got this message (TAC m...
Hafizudin MD
16:33 Bug #690 (Internal Testing): bug - Funds Transfer - Favourite 3rd Party Account Transfer
Done Wong Bernard
16:28 Bug #688 (Internal Testing): bug - FundsTransfer - Own Funds Transfer
Currently it shows drop down boxes for both From Account and To Account. Wong Bernard
16:15 Bug #687 (Internal Testing): bug - Account Inquiry
Please check if it correct Wong Bernard
16:05 Bug #683: bug - Login
Cannot reproduce 1)
What user login do you use to test 2)?
Wong Bernard
16:02 Bug #695 (Development / Work In Progress): bug - Bills Payment - Make a Payment to a Favourite Payee
Done.
There is an error when trying to process the transaction. It returns an error code indicating that the TAC ...
Wong Bernard
15:28 Bug #694 (Internal Testing): bug - Bills Payment - Make a one–off Payment
Done Wong Bernard
15:00 MPI Retail Banking System Task #681 (Development / Work In Progress): MPI Phase 1b: Time Deposit Placement
vincent did not develop anything for TCD. He said that maybe darsy did. I asked darsy and she did not write anything ... Ang Wei Cheng
14:56 MPI Integration Task #707 (Work Completed-End life cycle): MPI Phase 1b: Create ESB Request beans, Response beans...
add mock up for
-check cutting inquiry
-check warehousing
-check reorder
Ang Wei Cheng
14:10 Bug #689 (Internal Testing): bug - Funds Transfer - New 3rd Party Account Transfer
Done Wong Bernard
14:04 Bug #691 (Internal Testing): bug - Funds Transfer - New Interbank Transfer
Done.
TAC number must be length 6, so if it is not filled in the validation will say that it length size must be 6...
Wong Bernard
13:29 Bug #692: bug - Funds Transfer - Favourite Interbank Transfer
Based on Functional Spec, there is no Account Type to be displayed for Step 2 and Step 3:
Amount
From Account
To...
Wong Bernard
12:22 MPI Retail Banking System Task #673 (Development / Work In Progress): Check Status
Done but need to check FS and requirement doc back to double confirm it is correct Sarinah Darsy
12:21 MPI Retail Banking System Task #674 (Development / Work In Progress): Stop Check
Done but need to check the FS and the requirement doc back for double confirm it is correct. Sarinah Darsy
12:15 Bug #693: bug - Transfer - Cash Card Top Up
tested by hafiz
status : failed
client site
*1) Enter empty no TAC NO - got this message (TAC must consist of 6 ...
Hafizudin MD
12:11 Bug #692 (Development / Work In Progress): bug - Funds Transfer - Favourite Interbank Transfer
Hafizudin MD
12:11 Bug #692: bug - Funds Transfer - Favourite Interbank Transfer
tested by hafiz
status : failed
1) Step 2/3 & Step 3/3 - need to display account type after account no "From ac...
Hafizudin MD
12:07 Bug #691: bug - Funds Transfer - New Interbank Transfer
update bug report
client site
1) Enter empty no TAC NO - got this message (TAC must consist of 6 characters.) - c...
Hafizudin MD
12:04 Bug #690 (Development / Work In Progress): bug - Funds Transfer - Favourite 3rd Party Account Tra...
tested by hafiz
status : failed
client site
1) error message - To account is not numeric. should changes to To 3...
Hafizudin MD
11:58 Bug #701: bug - TAC
tested by hafiz
status : passed
Hafizudin MD
11:55 Bug #689: bug - Funds Transfer - New 3rd Party Account Transfer
client site
1) error message - To account is not numeric. should changes to To 3rd Party Account Number is not numer...
Hafizudin MD
11:47 Bug #689: bug - Funds Transfer - New 3rd Party Account Transfer
update new bug
client site
1) error message - To account is not numeric. should changes to To 3rd Party Account ...
Hafizudin MD
11:34 Bug #688 (Development / Work In Progress): bug - FundsTransfer - Own Funds Transfer
tested by hafiz
status : failed
*
1) why To account is populate , not from account . after select account at accou...
Hafizudin MD
11:00 Bug #686 (Development / Work In Progress): bug - Account Maintenance
tested by hafiz
status : failed
*bug report*
unlink account ERROR
1) Step 1/2 need "Or" between confirm b...
Hafizudin MD

January 03, 2011

12:03 Bug #693 (Work Completed-End life cycle): bug - Transfer - Cash Card Top Up
Fixed. Please note that Functional Spec are still subject to change based on Dennis input and is thus not entirely re... Wong Bernard
11:57 Bug #692 (Work Completed-End life cycle): bug - Funds Transfer - Favourite Interbank Transfer
Fixed. Please note that Functional Spec are still subjected to changed based on Dennis input and is thus not entirely... Wong Bernard
11:51 Bug #690 (Work Completed-End life cycle): bug - Funds Transfer - Favourite 3rd Party Account Tran...
Fixed. Please note that Functional Spec are still subjected to changed based on Dennis input and is thus not entirel... Wong Bernard
11:50 Bug #697: bug - Bills Payment - Manage Future Payment
forgot to change the %Done Sarinah Darsy
11:49 Bug #696 (Internal Testing): bug - Bills Payment - Manage My Favourite Payees
The go back link fixed already.
But pending for the update link, caused still don't have response at the user side...
Sarinah Darsy
11:49 Bug #688 (Work Completed-End life cycle): bug - FundsTransfer - Own Funds Transfer
Fixed. Please note that Functional Spec are still subjected to changed based on Dennis input and is thus not entirel... Wong Bernard
11:48 Bug #697 (Internal Testing): bug - Bills Payment - Manage Future Payment
Already fixed.
You can proceed to test it.
Thanks.
Sarinah Darsy
11:37 Bug #686 (Internal Testing): bug - Account Maintenance
Hi Hafiz,
I already fix for this bugs,
you can proceed to test it.
But it still pending for the ESB integration,...
Sarinah Darsy
11:27 Bug #685: bug - Reset password
*update new bug report*
1) cannot go to step 2/3 - Reset Password Fail
*update pending testing*
1) client s...
Hafizudin MD
10:55 Bug #683: bug - Login
*remove bug report*
-1)UserName (alphanumeric . Cannot have any special characters except for “.””_”. ) . ...
Hafizudin MD
10:30 Bug #679: bug - First Time Login
update new bug report
client side
1) Access Code-Enter "a111111" (1st character – alpha, followed by 6 digit. N...
Hafizudin MD
10:24 Bug #686 (Development / Work In Progress): bug - Account Maintenance
Hi Lee yong,
I already removed the TAC and make the button go back as link.
But should the ESb reaponse, request an...
Sarinah Darsy
09:50 MPI Integration Task #707 (Development / Work In Progress): MPI Phase 1b: Create ESB Request beans, Response bean...
ESB services done(without mock up response)
-check cutting inquiry
-check warehousing
Ang Wei Cheng
08:57 Task #678: MPI Phase1a: SIT
1. Fixed back button triggering Struts client side
2. Changed back button to "button transparent" for Fund Transfer ...
Wong Bernard

January 02, 2011

01:53 Bug #683: bug - Login
update bug report
1)can login using wrong password. follow password requirement.
Hafizudin MD
01:22 Bug #701 (Internal Testing): bug - TAC
Hafizudin MD
00:58 Bug #700: bug - Funds Transfer - Manage my favourite transfers - Interbank Transfer
tested by hafiz
status failed
Delete
1) click go back - account & banking tab changed to Home tab
*pending ...
Hafizudin MD
00:38 Bug #699: bug - Funds Transfer - Manage my favourite transfers - 3rd party transfer
tested by hafiz
status failed
update bug
need someone to fix "What's TAC?" page. page is not display correctly...
Hafizudin MD
23:49 Bug #699 (Development / Work In Progress): bug - Funds Transfer - Manage my favourite transfers -...
tested by hafiz
status failed
need someone to fix "What's TAC?" page. page is not display correctly.. no spacing ...
Hafizudin MD

December 31, 2010

15:45 Bug #686: bug - Account Maintenance
Hi Darsy, bug has higher priority. Please fix this first. Tan Lee Yong
15:43 MPI Integration Task #707 (Work Completed-End life cycle): MPI Phase 1b: Create ESB Request beans, Response beans...
Tan Lee Yong
15:41 Task #639 (Closed - End of life cycle): ESB Service
Tan Lee Yong
15:40 Task #453 (Closed - End of life cycle): Install WebLogic to Site Offce Development Server and SVN...
assumed completed. Tan Lee Yong
15:38 Task #448 (Closed - End of life cycle): Maybank Philipines Info Site - Data Migration
Tan Lee Yong
15:38 Task #616 (Closed - End of life cycle): MPI: L&F Design
Completed Tan Lee Yong
15:36 M2U Support System Task #628 (Closed - End of life cycle): MPI: Create CRUD of IBSS Content
Should be completed. Tan Lee Yong
15:35 MPI Business Banking System Task #610 (Closed - End of life cycle): Refactor KFHBIB to MPI project
Completed Tan Lee Yong
15:34 Task #624 (Closed - End of life cycle): Log Table Design
Tan Lee Yong
15:34 Task #635 (Closed - End of life cycle): Message Services
Tan Lee Yong
15:33 MPI Retail Banking System Task #627 (Dropped-End of life cycle): IB Shared Services
No applicable anymore Tan Lee Yong
15:31 MPI Retail Banking System Task #706 (Work Completed-End life cycle): MPI Phase 1b: Loan Inquiry & Loan Details
To do the Loan Inquiry and see the loan account details. Tan Lee Yong
15:30 MPI Retail Banking System Task #705 (Work Completed-End life cycle): MPI Phase 1b: Time Deposit Details
To display the Time Deposit Details. Tan Lee Yong
15:26 MPI Retail Banking System Task #682: MPI Phase1b: Time Deposit Inquiry
Reassign to Wei Cheng. Vicent is reassign to Loan. Vincent, please check in what you have done and communicate with W... Tan Lee Yong
15:24 MPI Retail Banking System Task #612 (Closed - End of life cycle): Refactor KFHCIB to MPI project
Completed. Tan Lee Yong
15:23 Task #581 (Closed - End of life cycle): MPI Technical Doc: Table Glossary Document
Tan Lee Yong
15:22 MPI Retail Banking System Task #672: Personal Loan Application
I have created a new bean at com.ib.esb.request.loan.ESBRequestPersonalLoanBean. Please add all the attributes in you... Tan Lee Yong
15:15 Task #494 (Closed - End of life cycle): Compile MPI Administration Module BRS
Tan Lee Yong
15:13 Task #495 (Closed - End of life cycle): Compile MPI Retail & SME Banking BRS
Tan Lee Yong
15:12 MPI Integration Task #615 (Closed - End of life cycle): MPI: Develop Message Conversion Layer
Tan Lee Yong

December 30, 2010

18:17 M2U Support System Revision 33:395494304722: Clean up and putting jsp descriptions into application resource
Cheang Danniell
18:11 Task #678: MPI Phase1a: SIT
3rd party account name inquiry - successful
Own account transfer - failed. still working with them on it.
Added c...
Ang Wei Cheng
18:03 MPI Retail Banking System Task #672: Personal Loan Application
1)complete all jsp pages until result page
2)complete required form-beans and view beans
3)insert service info note...
Wijayanti Nitya
17:16 M2U Support System Revision 32:074d742cba93: included latest application resource file for jsp
Cheang Danniell
17:11 M2U Support System Revision 31:b7ffc527b5de: Clean up and putting jsp descriptions into application resource (except...
Cheang Danniell
15:29 Bug #685: bug - Reset password
bug report
* Enter Alphanumeric (one character & one numeric) & special character to Password - got this error...
Hafizudin MD
15:25 M2U Support System Revision 30:a45e5ec2b0a6: Added trnx enquiry into hibernate configuration
Amended bug on trnx enquiry due to wrong view bean used
Amended bug bacnent enquiry due to wrong field name used
Cheang Danniell
15:02 Bug #700 (Internal Testing): bug - Funds Transfer - Manage my favourite transfers - Interbank Tra...
pending testing
add Interbank favourite Transfer - waiting until bernard fix Favourite List (Add to Favourite) hyp...
Hafizudin MD
14:01 Bug #691: bug - Funds Transfer - New Interbank Transfer
bug report
a) new interbank transfer - got blank page
1) clean you project on eclipse
2) run server
3) Enter ...
Hafizudin MD
11:34 Bug #679: bug - First Time Login
# Username - Enter Alphanumeric + full stop "." - got this error (Username cannot include special characters except u... Hafizudin MD
11:28 Bug #685 (Development / Work In Progress): bug - Reset password
tested by hafiz
status : failed
bug report
* Enter Alphanumeric (one character & one numeric) & special characte...
Hafizudin MD
09:47 Bug #685 (Internal Testing): bug - Reset password
Hafizudin MD

December 29, 2010

02:34 Bug #679: bug - First Time Login
# CIF No(IB Access No ) - 1st character – alpha, followed by 6 digit. No special character
# username - Cannot hav...
Hafizudin MD
02:25 Bug #679 (Development / Work In Progress): bug - First Time Login
tested by hafiz
status : failed
# CIF No(IB Access No ) - 1st character – alpha, followed by 6 digit. No specia...
Hafizudin MD
01:05 M2U Support System Revision 29:a30fb1bd41d2: Clean up for java classes
Cheang Danniell
00:21 MPI Retail Banking System Task #682 (Development / Work In Progress): MPI Phase1b: Time Deposit Inquiry
Vincent Devethas
18:07 MPI Retail Banking System Task #672: Personal Loan Application
1)finish jsp display for page:
-terms and condition
-loan details
-borrower information
-result page
2)c...
Wijayanti Nitya
16:14 Task #678: MPI Phase1a: SIT
Fixed the unreadable character problem in the response message. Strip out the last character which is a character wit... Ang Wei Cheng
13:13 Bug #679 (Internal Testing): bug - First Time Login
Hafizudin MD

December 28, 2010

03:40 Bug #701 (Work Completed-End life cycle): bug - TAC
FYI, Invalid TAC, TAC expired and TAC blocked will be shown as error message in Confirm Page. Any other error will be... Vincent Devethas
03:36 Bug #699 (Work Completed-End life cycle): bug - Funds Transfer - Manage my favourite transfers - ...
items :
add
1) Please retest
2) I change the Request TAC hiperlink to the right whereas the Step indicator to the...
Vincent Devethas
02:44 Bug #700 (Work Completed-End life cycle): bug - Funds Transfer - Manage my favourite transfers - ...
item :
1) Add favourite interbank is at the result page of open interbank transfer.
2) Please retest.
3) No Edit ...
Vincent Devethas
01:59 Bug #685 (Development / Work In Progress): bug - Reset password
item :
1) will get back to you on this.
2) current mock up data didn't cater for maximum reset password checking. ...
Vincent Devethas
01:16 Bug #679 (Work Completed-End life cycle): bug - First Time Login
Vincent Devethas
23:46 Task #678: MPI Phase1a: SIT
Day 4 Report:-
1. Pin Verification (Logon 01) - SUCCESS
2. First Time Login (Logon 02) - PENDING
3. Customer Infor...
Wong Bernard
18:16 M2U Support System Revision 28:62719f74eb1b: Added content enquiry module which is pending for validation
Cheang Danniell
17:47 MPI Retail Banking System Task #672 (Development / Work In Progress): Personal Loan Application
1)create packages for jsp,action,services
2)create config files (struts, form-bean, view-bean, tiles-defs,validation...
Wijayanti Nitya
16:59 Bug #683 (Development / Work In Progress): bug - Login
bug report
UserName (alphanumeric . Cannot have any special characters except for “.””_”. ) . got this err...
Hafizudin MD
13:31 Bug #683 (Internal Testing): bug - Login
Tan Lee Yong
13:29 Task #629 (Internal Testing): Account Inquiry Coding
Tan Lee Yong
12:42 Bug #687 (Work Completed-End life cycle): bug - Account Inquiry
Wong Bernard
11:14 Bug #683 (Work Completed-End life cycle): bug - Login
Wong Bernard
11:11 Task #629 (Work Completed-End life cycle): Account Inquiry Coding
Done Wong Bernard

December 27, 2010

23:47 M2U Support System Revision 27:cca90ca46130: Added organization search and org user search
Added partial content search function Cheang Danniell
18:19 MPI Retail Banking System Task #672: Personal Loan Application
Hi Nitya,
please download the document attached for your new task. You also need to clone the projects at [[https:...
Sarinah Darsy
17:56 Task #678: MPI Phase1a: SIT
Tested a few request message with the test data provided by maybank:-
First Time Login (Logon 02) - Get the respon...
Ang Wei Cheng
15:58 Bug #701 (Work Completed-End life cycle): bug - TAC
bug report
1) Error not display at confirm page - now at result page(reason)
Hafizudin MD
15:55 Bug #700 (Work Completed-End life cycle): bug - Funds Transfer - Manage my favourite transfers - ...
bug report
add
1) no add button
delete
1) got error page when click delete button
update
1) no account hy...
Hafizudin MD
15:50 MPI Retail Banking System Task #680 (Internal Testing): MPI Phase 1a: Client Side Validation
Done adding the struts javascript validation.
Please retest it.
Thanks.
Sarinah Darsy
15:47 Bug #699 (Work Completed-End life cycle): bug - Funds Transfer - Manage my favourite transfers - ...
bug report
add
1) all field is not clear when click add button
2) Step 1/3 put Request TAC above
3) Follow sequ...
Hafizudin MD
14:31 Bug #697 (Work Completed-End life cycle): bug - Bills Payment - Manage Future Payment
bug report
1) Go back is hyperlink
Hafizudin MD
14:28 Bug #696 (Work Completed-End life cycle): bug - Bills Payment - Manage My Favourite Payees
bug report
Add Favourite Payee
1) Go back is hyperlink - not button
Delete Favourite Payee
1) Go back is hype...
Hafizudin MD
14:23 Bug #695 (Work Completed-End life cycle): bug - Bills Payment - Make a Payment to a Favourite Payee
bug report
1) Subscriber’s Name(alphanumeric) - put Special Character (-,;) - got this error message (From accou...
Hafizudin MD
14:10 Bug #694 (Work Completed-End life cycle): bug - Bills Payment - Make a one–off Payment
bug report
1) Biller Institution is not in step 1/4 but 1/3
3) Subscriber’s Name - Alphanumeric + special c...
Hafizudin MD
13:49 Bug #693 (Work Completed-End life cycle): bug - Transfer - Cash Card Top Up
bug report
1) Amount field size is 15 character
2) Cash Card Number should be 15 character
3) Cash Card Number l...
Hafizudin MD
12:33 Bug #692 (Work Completed-End life cycle): bug - Funds Transfer - Favourite Interbank Transfer
bug report
1) Amount should be 15 character
2) Go back is hyperlink. not button
3) Make another transfer is hype...
Hafizudin MD
12:27 Bug #691 (Work Completed-End life cycle): bug - Funds Transfer - New Interbank Transfer
bug report
1) need request TAC at step 1/3
2)Follow sequent step 1/3 (don't have step 1/4)
* 1) Click on ""Reque...
Hafizudin MD
12:15 Bug #690 (Work Completed-End life cycle): bug - Funds Transfer - Favourite 3rd Party Account Tran...
bug report
1) need to remove clear button
2) please follow this sequent for step 1/3 (please refer to doc)
* 1) ...
Hafizudin MD
12:04 Bug #689 (Work Completed-End life cycle): bug - Funds Transfer - New 3rd Party Account Transfer
1) need to remove clear button
2) need ""Request TAC"" at step 1/3
3) please follow this sequent for step 1/3 (p...
Hafizudin MD
11:35 Bug #688 (Work Completed-End life cycle): bug - FundsTransfer - Own Funds Transfer
1) need to remove clear button
2) Follow sequent. Apply to step 1/3 & 2/3. (please compare doc and system)
# 1) E...
Hafizudin MD
11:19 Bug #687 (Work Completed-End life cycle): bug - Account Inquiry
bug report
1) Account Details - not display Product Name(Saving Account, etc,....)
Hafizudin MD
11:16 Bug #685: bug - Reset password
............ Hafizudin MD
11:15 Bug #686 (Work Completed-End life cycle): bug - Account Maintenance
bug report
1) link account - remove all TAC function step 1/3 & 2/3
2) Unlink account - remove all TAC function s...
Hafizudin MD
11:10 Bug #685 (Work Completed-End life cycle): bug - Reset password
bug report
1) can change locked user. User can login after been unlock
2) can reset password anytime . reset pass...
Hafizudin MD
10:35 Bug #679: bug - First Time Login
add new bug
1) UserName is not text input
2) Get this error after click next (Enter password & re-enter password...
Hafizudin MD
10:31 Bug #683 (Work Completed-End life cycle): bug - Login
bug report
1) UserName (alphanumeric . Cannot have any special characters except for “.””_”. ) . it can a...
Hafizudin MD
10:07 MPI Retail Banking System Task #682 (Work Completed-End life cycle): MPI Phase1b: Time Deposit Inquiry
To implement the Time Deposit Inquiry based on BR and FS Tan Lee Yong
10:05 MPI Retail Banking System Task #681 (Work Completed-End life cycle): MPI Phase 1b: Time Deposit Placement
To implement the Time Deposit Placement BR and FS. Tan Lee Yong
09:51 MPI Retail Banking System Task #680: MPI Phase 1a: Client Side Validation
Completed Modules:
1) Own Account Transfer
2) Cash Top Up
3) Account Maintenance
4) Bill Payment
5) Manage Futur...
Tan Lee Yong
09:46 MPI Retail Banking System Task #680 (Closed - End of life cycle): MPI Phase 1a: Client Side Validation
Apply Java Scripts for client side validation for all modules Tan Lee Yong

December 26, 2010

23:11 Bug #679 (Work Completed-End life cycle): bug - First Time Login
bug
1) Remove Clear button at step 4/5(see doc)
2) Cannot have any special characters except for “.”” _”...
Hafizudin MD

December 24, 2010

00:52 Task #678: MPI Phase1a: SIT
Day 2 Report:-
1. Pin Verification (Logon 01) - SUCCESS
2. First Time Login (Logon 02) - PENDING
3. Customer...
Wong Bernard
17:32 Task #678 (Development / Work In Progress): MPI Phase1a: SIT
Day 1 Report:-
Bernard’s SIT progress report for 23/12/2010:
1. First Time Login (Logon 02): FAILED
2. Login (...
Tan Lee Yong
17:31 Task #678 (Work Completed-End life cycle): MPI Phase1a: SIT
Conduct system integration test with CICS. Tan Lee Yong

December 23, 2010

13:39 M2U Support System Revision 26:c26c22f58637: Amended navigation to avoid create and delete
Amended navigation to have limited data for editing and display Cheang Danniell
13:17 MPI Retail Banking System Task #677 (Work Completed-End life cycle): Check Warehousing
To build Check Service module - Check Warehousing Tan Lee Yong
13:16 MPI Retail Banking System Task #676 (Work Completed-End life cycle): Check Cutting
To build Check Service module - Check Cutting Tan Lee Yong
13:15 MPI Retail Banking System Task #675 (Work Completed-End life cycle): Check Book Reorder
To build Check Service module - Check Book Reorder Tan Lee Yong
13:14 MPI Retail Banking System Task #674 (Work Completed-End life cycle): Stop Check
To build Check Service Module - Stop Check Tan Lee Yong
13:13 MPI Retail Banking System Task #673 (Work Completed-End life cycle): Check Status
To build Check Service Module - Check Status module Tan Lee Yong
12:59 M2U Support System Revision 25:552cdefd5ca0: Amended group to show navigation tree design during creation and editing
Cheang Danniell
12:56 MPI Retail Banking System Task #672 (Work Completed-End life cycle): Personal Loan Application
To build personal load application form Tan Lee Yong
12:55 MPI Retail Banking System Task #671 (Work Completed-End life cycle): Auto Loan Application Form
To build the auto loan application forms Tan Lee Yong

December 22, 2010

16:36 M2U Support System Revision 24:da6ed555ae4a: Merge with a431d5e56ac260f74759052bceea3658f371e982
Cheang Danniell
16:33 M2U Support System Revision 23:8b8501c5e74a: Fixed bug to show wrong operation start and end time
Removed conflicting jars Cheang Danniell
10:52 M2U Support System Revision 22:a431d5e56ac2: add maybank web.xml setting
Ang Wei Cheng

December 20, 2010

21:29 M2U Support System Revision 21:2912ddffa5aa: create a tree hierarchy design
Nazri Imran
17:42 M2U Support System Revision 20:07bf20c43a6a: (no commit message)
Cheang Danniell

December 19, 2010

21:16 M2U Support System Revision 19:ba27bae5647e: Added user enquiry search for last login date and creation date
Added trnx enquiry module Cheang Danniell

December 18, 2010

00:41 M2U Support System Revision 18:d9efc6825599: Added search user capability to admin users and rib and bib users
Combined user enquiry for both rib and bib Cheang Danniell

December 16, 2010

02:26 M2U Support System Revision 17:c66430075376: Amended bugs for navigation
Cheang Danniell
23:31 M2U Support System Revision 16:0bffb867d8a6: Fixed bug on most module except organization module and navigation
Cheang Danniell
15:59 M2U Support System Revision 15:c7b4ffaaae39: Added navigation creation and edit
Revamped navigation layout
Shared breadcrumb within navigation and content
Cheang Danniell

December 14, 2010

01:54 M2U Support System Revision 14:957ada927eaf: Added check credentials for content
Added error logout page
Fixed pagination bugs on org user enquiry
Amended portal login to lighter weight authenticati...
Cheang Danniell
22:25 M2U Support System Revision 13:828b1ba71d94: Added Weblogic.xml for deployment into WL app server forcing to use the...
Amended navigation based on current modifcations
Added validation for navigation
Added check credentials for access o...
Cheang Danniell

December 12, 2010

00:12 M2U Support System Revision 12:30f1a15bdb14: Added application resource for service list jsp and validation
Cheang Danniell
23:56 M2U Support System Revision 11:a351f8b83fe9: Merge with c917a87878820030e7ad313d0507e21ecd2c7d02
Cheang Danniell
23:49 M2U Support System Revision 10:b9075fbd9739: Added child table for product type and service list
Cheang Danniell

December 10, 2010

18:09 M2U Support System Revision 9:c917a8787882: change design for product type content
Nazri Imran
16:59 M2U Support System Revision 8:57bc31017485: change the landing image to maybank logo, and modify design for content
Nazri Imran
11:16 M2U Support System Revision 7:e1bb554bbf53: Merge with e193fb91015331f538a9f9e05da70a4803bbd84b
Cheang Danniell
11:15 M2U Support System Revision 6:f802b3ec7a7f: Fixed bug on delete content due to wrong field being used as ID
Cheang Danniell
09:21 M2U Support System Revision 5:e193fb910153: images that should be on last commit
Nazri Imran

December 09, 2010

22:09 M2U Support System Revision 4:e6e3b5f31f7c: Merge with 548774501af9d572c16ff64c2cb44a35431ffa01
Cheang Danniell
22:07 M2U Support System Revision 3:6c14cda02198: Added delete content except for product type
Added audit logging for each edit, create and delete
Added validation except for product type
Cheang Danniell
17:42 Task #639 (Work Completed-End life cycle): ESB Service
more or less done. need to be finetuned. Ang Wei Cheng
17:36 M2U Support System Revision 2:548774501af9: change the design of current mss
Nazri Imran
11:05 M2U Support System Revision 1:ba1728f3df01: Minor code review on content
Removed unwanted dependencies Cheang Danniell

December 07, 2010

12:23 M2U Support System Revision 0:2444cddeca89: Added new IBSS project based on latest requirement
Cheang Danniell
 

Also available in: Atom