18:04 5. Training Compilation Issue Task #10631 (Internal Testing): BSNeBIZ web - RSA Encryption
Najmi Pasarudin
18:04 5. Training Compilation Issue Task #10583 (Internal Testing): CDB_Device Pairing TAC
Najmi Pasarudin
16:02 5. Training Compilation Issue Task #10631 (Pending SIT Deployment): BSNeBIZ web - RSA Encryption
Najmi Pasarudin
16:02 5. Training Compilation Issue Task #10583 (Pending SIT Deployment): CDB_Device Pairing TAC
Najmi Pasarudin
16:02 5. Training Compilation Issue Bug #10638 (Pending SIT Deployment): UAT_IBAM_Admin User Manager_Access
Najmi Pasarudin
14:47 5. Training Compilation Issue Bug #10639 (Internal Testing): UAT_IBAM_Admin User Manager_Change Name
Najmi Pasarudin

February 12, 2020

18:26 5. Training Compilation Issue Bug #10639 (Work Completed-End life cycle): UAT_IBAM_Admin User Manager_Change Name
Path : IBAM > Admin User Manager > Create (Org Setup > User Maintenance)
To change name :
Suspend to Block
...
Anonymous
18:10 5. Training Compilation Issue Bug #10638 (Work Completed-End life cycle): UAT_IBAM_Admin User Manager_Access
Path : IBAM > Admin User Manager > Create (Org Setup)
Hi Najmi,
Why there is edit function under Organization S...
Anonymous
11:19 Internal Testing - IBAM Bug #9924 (Work Completed-End life cycle): IBAM Password Policy - Fields in Maker and Checker pag...
Tested and passed.
Sorry for the confusing.
Anonymous
11:16 Internal Testing - IBAM Bug #9924 (Internal Testing): IBAM Password Policy - Fields in Maker and Checker pages are not sy...
Please retest. Najmi Pasarudin
11:08 5. Training Compilation Issue Bug #10515 (Work Completed-End life cycle): IOS BSNeBIZ - GUI
Tested and passed for all issues.
Anonymous
11:06 Internal Testing - IBAM Bug #9924 (Development / Work In Progress): IBAM Password Policy - Fields in Maker and Checker pa...
Hi Najmi,
Tested and failed.
Issue still persist, kindly check.
Thanks
Anonymous
10:28 5. Training Compilation Issue Bug #10622 (Work Completed-End life cycle): IBAM > Admin User Manager
Tested and passed for :
-change suspend to block
-remove "edit password admin module user"
Anonymous

February 11, 2020

18:20 Agrobank Projects Migration #10633 (Prepare Patch for UAT): Migration Plan for ID116 UIUX
OK. Please deploy to preprod Stephanie Sufrapto
18:18 (Deleted) Migration #10623 (Dropped-End of life cycle): Migration plan for ID115
Stephanie Sufrapto
18:14 5. Training Compilation Issue Bug #10622 (Internal Testing): IBAM > Admin User Manager
Najmi Pasarudin
18:14 Internal Testing - IBAM Bug #9924 (Internal Testing): IBAM Password Policy - Fields in Maker and Checker pages are not sy...
Najmi Pasarudin
18:13 5. Training Compilation Issue Task #10583 (Internal Testing): CDB_Device Pairing TAC
Najmi Pasarudin
18:13 5. Training Compilation Issue Task #10631 (Internal Testing): BSNeBIZ web - RSA Encryption
Najmi Pasarudin
16:46 5. Training Compilation Issue Bug #10385 (Work Completed-End life cycle): IBAM - Domain user lock / unlock
tested and passed
Anonymous
16:25 Internal Testing - IBAM Bug #9530 (Pending Review): Message Box - System display pending approval (archive)
Issue:
Pending Message Box is in Authorization BBE. Has problem when admin has access to Message Box but no access t...
Najmi Pasarudin
16:21 5. Training Compilation Issue Task #10631 (Pending SIT Deployment): BSNeBIZ web - RSA Encryption
Najmi Pasarudin
15:54 5. Training Compilation Issue Bug #10624: IBAM_Pre-Prod-Access Matrix
Hi Najmi,
Kindly check on below issue
Path : Admin user manager > user access (select all access to view the ...
Anonymous
15:46 5. Training Compilation Issue Bug #10505 (Work Completed-End life cycle): Android - GUI
Tested and passed.
Thanks Darren and Bram.
Anonymous
11:56 Agrobank Projects Migration #10633: Migration Plan for ID116 UIUX
update version control for IBAM and BIB Siti Balqis Othman
11:46 5. Training Compilation Issue Bug #10634 (New - Begin Life Cycle): Android_Own Account Transfer_Authorization
Path : Authorization (Approver) > Own Account Transaction
Issue :
- Missing Transaction Details
- System not...
Anonymous
11:42 5. Training Compilation Issue Bug #10507 (Work Completed-End life cycle): Mobile (Android) - Jompay
Thank you.
Tested and passed
Anonymous
11:41 5. Training Compilation Issue Bug #10529 (Development / Work In Progress): Android - Approver List
Hi Darren,
The issue still persist, kindly check and fix.
Thank you
Anonymous
11:33 5. Training Compilation Issue Bug #10579: Android_Authorization_Result Page listing
Hi Darren,
Please amend the field name at authorization screen
Transaction : 3rd Party Transaction
- Fees ch...
Anonymous
11:24 Agrobank Projects Migration #10633 (Prepare Patch for UAT): Migration Plan for ID116 UIUX
Hi steph,
Kindly help to review the migration plan for UIUX migration.
Siti Balqis Othman
09:12 5. Training Compilation Issue Task #10583 (Pending SIT Deployment): CDB_Device Pairing TAC
Najmi Pasarudin
09:12 5. Training Compilation Issue Task #10631 (Development / Work In Progress): BSNeBIZ web - RSA Encryption
Najmi Pasarudin
09:10 5. Training Compilation Issue Bug #10624: IBAM_Pre-Prod-Access Matrix
Hi Athira,
Please get the latest admin access matrix from Farid and updated according to IBAM.
Najmi Pasarudin

February 10, 2020

16:23 Internal Testing - CDB Bug #9849 (Work Completed-End life cycle): Wrong pointing at side navigation CDB
Tested and passed. Anonymous
15:22 5. Training Compilation Issue Task #10631 (Closed - End of life cycle): BSNeBIZ web - RSA Encryption
To add encryption to BSNeBiz web
Anonymous
12:41 1. CDB_Phase 2 & 3 Development Enhancement #10630 (Dropped-End of life cycle): IBAM_BSNeBiz_Mobile Manager
*To add Mobile Manager function to IBAM and BSNeBiz*
*IBAM*
Path : IBAM > CBE > Organization Setup > Company
...
Anonymous
12:33 5. Training Compilation Issue Task #10583 (Development / Work In Progress): CDB_Device Pairing TAC
Najmi Pasarudin
12:28 Internal Testing - IBAM Enhancement #9755 (Work Completed-End life cycle): IBAM-File Upload
Tested and passed. Anonymous
Avatar?id=1966&size=24 12:27 1. CDB_Phase 2 & 3 Development Task #9803 (Internal Testing): [P1_Extended] : To develop BOLT module which allow CDB User to do ...
Hi Athira,
Please find the latest fixed application install in email and try to test again for *below* issue.
I...
Ngoh Chee Onn
10:26 LHBank Change Request Task #10612 (Pending SIT Deployment): CR-EB190056 PromptPay Actual Account for BIB
sent to Sahapol for deployment and testing Ngoh Chee Ping

February 07, 2020

17:18 Internal Testing - CDB Enhancement #10213 (Work Completed-End life cycle): SIT_C027 - IBAM - Extend service time until 8...
Tested and passed. Anonymous
16:54 1. CDB_Phase 2 & 3 Development Task #9803 (Development / Work In Progress): [P1_Extended] : To develop BOLT module which allow C...
Hi Chee Onn, just testing the updated system, below is my finding :
*Bugs :*
Bulk Payment 800
-1. Fix le...
Anonymous
11:49 Internal Testing - IBAM Bug #10608 (Work Completed-End life cycle): IBAM - Side Navigation
Tested and passed Anonymous
11:49 Internal Testing - IBAM Bug #10609 (Work Completed-End life cycle): IBAM_Message Box_Not refresh User listing
Tested and passed for both issue. Anonymous
11:49 5. Training Compilation Issue Bug #10617 (Work Completed-End life cycle): IBAM_Error 500 screen
Tested and passed Anonymous
11:49 5. Training Compilation Issue Bug #10564 (Work Completed-End life cycle): CDB_Bulk Payment_Main note
Tested and passed for all modules.
Anonymous
11:49 Internal Testing - CDB Bug #10610 (Work Completed-End life cycle): CDB-Message Box-Clear "New" sign at trash folder
Tested and passed. Anonymous
11:07 5. Training Compilation Issue Bug #10624 (Development / Work In Progress): IBAM_Pre-Prod-Access Matrix
Najmi Pasarudin
08:58 Internal Testing - IBAM Bug #9924 (Pending SIT Deployment): IBAM Password Policy - Fields in Maker and Checker pages are ...
Najmi Pasarudin

February 06, 2020

17:47 5. Training Compilation Issue Bug #10619 (Work Completed-End life cycle): CDB_Jompay_Filter Special Character
Tested and passed Anonymous
17:13 Internal Testing - CDB Bug #9812 (Work Completed-End life cycle): Verifier-Wrong highlight tab
Tested and passed Anonymous
17:05 Internal Testing - CDB Bug #9430 (Work Completed-End life cycle): CDB-Payment_Mobile,Upass
Tested and passed Anonymous
17:04 Internal Testing - CDB Bug #9678 (Work Completed-End life cycle): Transfer & Payment-Wrong error message
Tested and passed Anonymous
17:02 Internal Testing - IBAM Bug #9924: IBAM Password Policy - Fields in Maker and Checker pages are not synchronized
Updated issue..
Path : Password Policy
1. Maker update field at Password Policy module
2. Checker reject the r...
Anonymous
Avatar?id=1966&size=24 15:39 1. CDB_Phase 2 & 3 Development Task #9803 (Internal Testing): [P1_Extended] : To develop BOLT module which allow CDB User to do ...
Hi Athira,
All the bug and task had been done, please find email for the new application installer.
Thank you
Ngoh Chee Onn
15:27 Internal Testing - CDB Bug #9788: IOS _Interface amended.
Tested and passed
Anonymous
15:26 5. Training Compilation Issue Bug #10622 (Pending SIT Deployment): IBAM > Admin User Manager
Najmi Pasarudin
15:03 Internal Testing - CDB Task #9897 (Work Completed-End life cycle): To add Security Statement | Client Charter | Privacy ...
Anonymous
14:45 5. Training Compilation Issue Bug #10624 (Closed - End of life cycle): IBAM_Pre-Prod-Access Matrix
Salam Najmi,
Reported from Farid (Security), there is some module missing in pre-prod environment.
Refer attac...
Anonymous
13:43 5. Training Compilation Issue Bug #10622 (Development / Work In Progress): IBAM > Admin User Manager
Delete from ADMIN_ACTION,ADMIN_NAVIGATION_ACTION and ADMIN_PERMISSION Najmi Pasarudin
11:42 (Deleted) Migration #10623: Migration plan for ID115
1. Add activity to update query
2. Add path for replacing core jar file at ibam
3. And path to replace the class fi...
Siti Balqis Othman
10:27 5. Training Compilation Issue Bug #10528: IOS - Approver List
Hi Adit,
Please prepare for UAT version.
Najmi Pasarudin
10:27 5. Training Compilation Issue Task #10578: IOS_Add Tnc to Jompay screen
Hi Adit,
Please prepare for UAT version.
Najmi Pasarudin
10:25 Internal Testing - CDB Bug #9891 (Work Completed-End life cycle): Mobile IIOS - System display wrong error message
Tested and passed for both issue.
Erro message updated for GMT issue
"Service is currently unavailable"
*Sh...
Anonymous
10:17 (Deleted) Migration #10623 (Dropped-End of life cycle): Migration plan for ID115
Hi steph,
Kindly help to review migration plan for ID115
Siti Balqis Othman
10:10 5. Training Compilation Issue Task #10577: Add Tnc to Jompay screen
Error message position has been fixed at SIT environment and waiting deployment for UAT. Anonymous
10:09 5. Training Compilation Issue Task #10577 (Work Completed-End life cycle): Add Tnc to Jompay screen
tested and passed for
New JomPAY
FAv Jompay
Anonymous
09:30 5. Training Compilation Issue Bug #10617 (Internal Testing): IBAM_Error 500 screen
Najmi Pasarudin
09:28 Internal Testing - IBAM Bug #10609 (Internal Testing): IBAM_Message Box_Not refresh User listing
Najmi Pasarudin
09:27 5. Training Compilation Issue Bug #10566 (Work Completed-End life cycle): IOS and Android - Failed to login on mobile (Approver)
Tested and passed. Anonymous
09:27 1. CDB_Phase 2 & 3 Development Task #10158: [P1_Extended] : RFP Sect 1.2.3 - To develop RENTAS (Real Time)
Noted Najmi Pasarudin
09:27 Internal Testing - CDB Bug #10610 (Internal Testing): CDB-Message Box-Clear "New" sign at trash folder
Najmi Pasarudin
09:26 Internal Testing - IBAM Bug #10608 (Internal Testing): IBAM - Side Navigation
Najmi Pasarudin
09:26 5. Training Compilation Issue Bug #10619 (Internal Testing): CDB_Jompay_Filter Special Character
Najmi Pasarudin

February 05, 2020

Avatar?id=1966&size=24 17:45 1. CDB_Phase 2 & 3 Development Task #10158: [P1_Extended] : RFP Sect 1.2.3 - To develop RENTAS (Real Time)
Hi Najmi,
Please refer to attached screenshot for the RENTAS project branch and help to deploy into SIT environmen...
Ngoh Chee Onn
17:37 1. CDB_Phase 2 & 3 Development Task #10158: [P1_Extended] : RFP Sect 1.2.3 - To develop RENTAS (Real Time)
Please find attached Rentas transaction for both initial and reversal. (WSDL and format layout)
Both has been deploy...
Norhaidah Md Dasuki
17:27 1. CDB_Phase 2 & 3 Development Task #10158: [P1_Extended] : RFP Sect 1.2.3 - To develop RENTAS (Real Time)
Chee Ping,
Please update on the progress of this module.
Final requirement as per link [[https://hub.penril.net/s...
Norhaidah Md Dasuki
16:47 5. Training Compilation Issue Bug #10620 (Work Completed-End life cycle): CDB_Generate PIN_Mobile Number
Tested and passed. Anonymous
16:28 5. Training Compilation Issue Bug #10619 (Pending SIT Deployment): CDB_Jompay_Filter Special Character
Najmi Pasarudin
16:28 Internal Testing - IBAM Bug #10608 (Pending SIT Deployment): IBAM - Side Navigation
Najmi Pasarudin
16:27 Internal Testing - CDB Bug #10610 (Pending SIT Deployment): CDB-Message Box-Clear "New" sign at trash folder
Najmi Pasarudin
16:27 Internal Testing - IBAM Bug #10609 (Pending SIT Deployment): IBAM_Message Box_Not refresh User listing
Najmi Pasarudin
16:27 5. Training Compilation Issue Task #10578 (Pending UAT Deployment): IOS_Add Tnc to Jompay screen
Najmi Pasarudin
16:26 1. CDB_Phase 2 & 3 Development Task #9803 (Development / Work In Progress): [P1_Extended] : To develop BOLT module which allow C...
I found another bugs and got some error message to add to the system.
*Bugs :*
*Bulk Payment 800*
1. Fix len...
Anonymous
16:26 5. Training Compilation Issue Task #10578 (Pending SIT Deployment): IOS_Add Tnc to Jompay screen
Najmi Pasarudin
16:26 5. Training Compilation Issue Bug #10617 (Pending SIT Deployment): IBAM_Error 500 screen
Najmi Pasarudin
16:24 5. Training Compilation Issue Bug #10566 (Internal Testing): IOS and Android - Failed to login on mobile (Approver)
Restful SIT and UAT updated. Please retest. Najmi Pasarudin
16:14 1. CDB_Phase 2 & 3 Development Task #9803: [P1_Extended] : To develop BOLT module which allow CDB User to do Batch Data Entry af...
Please refer below and use the latest installer to test.
-1. Bulk Payment - 700-
- Entered symbol to Old IC Numbe...
Anonymous
10:28 CR19002 - IBAM Enhancement CMS Bug #10598: User Transaction Log Issue
Hi erni, fixed search issue. Please re-test. Tq Siti Nursyahira Suhaimi
09:30 Internal Testing - IBAM Bug #10609 (Development / Work In Progress): IBAM_Message Box_Not refresh User listing
Najmi Pasarudin

February 04, 2020

17:53 Internal Testing - CDB Bug #10610 (Development / Work In Progress): CDB-Message Box-Clear "New" sign at trash folder
Najmi Pasarudin
16:30 5. Training Compilation Issue Task #10577 (Internal Testing): Add Tnc to Jompay screen
Najmi Pasarudin
16:28 5. Training Compilation Issue Task #10577 (Development / Work In Progress): Add Tnc to Jompay screen
Najmi Pasarudin
15:27 Internal Testing - IBAM Bug #10608 (Development / Work In Progress): IBAM - Side Navigation
Najmi Pasarudin
15:26 5. Training Compilation Issue Bug #10620 (Internal Testing): CDB_Generate PIN_Mobile Number
Najmi Pasarudin
15:20 5. Training Compilation Issue Bug #10385 (Internal Testing): IBAM - Domain user lock / unlock
After discussion, flow should be:
# If AD user is lock, IBAM also lock
# After AD user is unlock, need to unlock ...
Najmi Pasarudin
14:39 5. Training Compilation Issue Bug #10281 (Work Completed-End life cycle): CDB-Estatement_Spacing
Tested and passed.
Tested and passed - SIT side
Anonymous
14:19 5. Training Compilation Issue Bug #10622 (Work Completed-End life cycle): IBAM > Admin User Manager
Hi Najmi,
Please remove Admin User Manager > Reset Password function on IBAM.
Anonymous
14:10 1. CDB_Phase 2 & 3 Development Task #10203 (Work Completed-End life cycle): [P2_RFP] : CDB - Landing Page and Customer Info
Tested and passed on web and mobile (android and ios) Anonymous
14:08 5. Training Compilation Issue Bug #10576 (Work Completed-End life cycle): IOS - Time Counter at Transaction Signing
Tested and passes.
No validation error appears since last fix.
Anonymous
14:06 5. Training Compilation Issue Bug #10460 (Pending Review): Mobile IOS - Application Name
Anonymous

February 03, 2020

17:36 LHBank Change Request Task #10612 (Finished Development): CR-EB190056 PromptPay Actual Account for BIB
Ngoh Chee Ping
15:59 5. Training Compilation Issue Bug #10617 (Development / Work In Progress): IBAM_Error 500 screen
Najmi Pasarudin
14:46 5. Training Compilation Issue Bug #10620 (Development / Work In Progress): CDB_Generate PIN_Mobile Number
Najmi Pasarudin
14:46 5. Training Compilation Issue Bug #10619 (Development / Work In Progress): CDB_Jompay_Filter Special Character
Najmi Pasarudin
13:58 PRODUCTION Bug #10580 (Finished Development): [PROD_006] : Company's Attendance Date
Nur Hazirah Mohd Razali
12:16 5. Training Compilation Issue Bug #10620 (Work Completed-End life cycle): CDB_Generate PIN_Mobile Number
CDB > Generate Pin > SMS (Mobile)
To add validation at Mobile Number field
Currently : System accept whatever n...
Anonymous
11:07 CR19002 - IBAM Enhancement CMS Bug #10599: Welcome Pack Management Issue
Yaya,
Please add Welcome Pack Letter for company with Inquiry Module. You may refer attachment for details.
Erni Suhaireen Zulkifli
10:42 CR19002 - IBAM Enhancement CMS Bug #10599: Welcome Pack Management Issue
Hi erni, Fixed Acknowledgement & Welcome letter issue, please retest Siti Nursyahira Suhaimi
09:44 5. Training Compilation Issue Bug #10619 (Work Completed-End life cycle): CDB_Jompay_Filter Special Character
To filter special character to ICBS
Hi Najmi, Kindly update Company Name filter at JOMPAY
Currently : System th...
Anonymous

January 31, 2020

15:42 5. Training Compilation Issue Bug #10617 (Work Completed-End life cycle): IBAM_Error 500 screen
Path : IBAM > Error 500 screen
Hi Najmi,
Button "Proceed to login" at error 500 screen not fuctioning.
Anonymous
10:46 (Deleted) Migration #10606 (Work Completed-End life cycle): Migration ID114_Migration Plan (Pentest - Rever...
Already Migrate to production on 29 January 2019 Siti Balqis Othman
10:46 (Deleted) Migration #10606 (Prepare Migration Report): Migration ID114_Migration Plan (Pentest - Reverse Tr...
Siti Balqis Othman
10:45 (Deleted) Migration #10606 (Final Patch & Code Review ): Migration ID114_Migration Plan (Pentest - Reverse ...
Siti Balqis Othman
10:45 (Deleted) Migration #10606 (Code Review (UAT)): Migration ID114_Migration Plan (Pentest - Reverse Transfer)
Siti Balqis Othman
10:16 KFH Change Request Task #10604 (Internal Testing): [Change Request] FPX Limit for Non-Resident
Dear Akmal,
Kindly proceed to test for FPX limit
Thank you.
Yap Kah Yan

January 30, 2020

17:56 CR19002 - IBAM Enhancement CMS Bug #10599 (Development / Work In Progress): Welcome Pack Management Issue
Hi Yaya,
Please refer attachment below for changes needs to be done.
0005.1 Welcome Pack Letter.png
Erni Suhaireen Zulkifli
15:04 Pineapple HRM Bug #10483 (Development / Work In Progress): [Android] 4.0: ATTENDANCE
Hi Bram,
Insert Remarks & Update Remarks still can be inserted more than 64char. Please assist.
Siti Norahayu Mohd Desa
14:25 Pineapple HRM Bug #10482 (Work Completed-End life cycle): [Android] 3.0: HOME
Tested & Passed. TQ Siti Norahayu Mohd Desa
14:19 CR19002 - IBAM Enhancement CMS Bug #10598 (Development / Work In Progress): User Transaction Log Issue
Hi Yaya,
Current Result:
Search field does not filter value that does not contain in the table. System currently...
Erni Suhaireen Zulkifli
13:23 Pineapple HRM Bug #10495 (Work Completed-End life cycle): [Angular] 3.0 HOME
Issue have been tested & passed.
Issue closed.
Siti Norahayu Mohd Desa
13:19 Pineapple HRM Change #10524 (Work Completed-End life cycle): [Angular] : Invitation Email
Hi Nisa,
Reported issue have been tested. Everything was fine except GUI for iOS mail as per discuss.
Tq
Siti Norahayu Mohd Desa
12:07 CR19002 - IBAM Enhancement CMS Bug #10598: User Transaction Log Issue
Hi Erni, please test User Transaction Log again Siti Nursyahira Suhaimi
12:06 CR19002 - IBAM Enhancement CMS Bug #10599: Welcome Pack Management Issue
Hi erni, please test WPM again Siti Nursyahira Suhaimi
11:42 Pineapple HRM Bug #10495 (Internal Testing): [Angular] 3.0 HOME
Hi Kak Ayu,
The link has been updated
Khairun Nisa Tamrin
11:41 Pineapple HRM Change #10524 (Internal Testing): [Angular] : Invitation Email
Hi Kak Ayu,
please retest the following changes in staging
Khairun Nisa Tamrin
10:30 LHBank Change Request Task #10612 (Closed - End of life cycle): CR-EB190056 PromptPay Actual Account for BIB
Anonymous
10:23 (Deleted) Migration #10606 (Prepare Patch for UAT): Migration ID114_Migration Plan (Pentest - Reverse Trans...
Anonymous

January 29, 2020

18:24 Pineapple HRM Bug #10483 (Internal Testing): [Android] 4.0: ATTENDANCE
Bramantyo Pujo Wiyono
18:24 Pineapple HRM Bug #10482 (Internal Testing): [Android] 3.0: HOME
Bramantyo Pujo Wiyono
15:58 (Deleted) Task #10605 (Work Completed-End life cycle): Add Resend SMS Notification on BIB
Tested and Passed, good job ! Erni Suhaireen Zulkifli
15:14 (Deleted) Task #10605: Add Resend SMS Notification on BIB
Erni, Please test using this url : http://staging.agronet.com.my/bib.sit.enhance.cms/common/Login.do Siti Nursyahira Suhaimi
14:47 5. Training Compilation Issue Change #10611 (Dropped-End of life cycle): IBAM-Message Box
Path : IBAM > Message Box
IBAM User received message from CDB user
Rahmat Aris suggest to put user details (C...
Anonymous
13:50 Pineapple HRM Bug #10540: [iOS] 5.0 Profile Functionality
Nur Syamili Abdul Majid wrote:
> Siti Norahayu Mohd Desa wrote:
> > Nur Syamili Abdul Majid wrote:
> > > Siti Nor...
Siti Norahayu Mohd Desa
12:48 Internal Testing - CDB Bug #10610 (Work Completed-End life cycle): CDB-Message Box-Clear "New" sign at trash folder
To clear "New" sign at trash folder
Path : CDB > Message Box > Trash folder
Currently system display "New" si...
Anonymous
12:45 Internal Testing - IBAM Bug #10609 (Work Completed-End life cycle): IBAM_Message Box_Not refresh User listing
Path : IBAM > Message Box > BSN Subj Maintenance > Subject > Category > Add User
1. System not refresh the user li...
Anonymous
12:40 Pineapple HRM Bug #10476: [iOS] 5.0 Profile
Siti Norahayu Mohd Desa wrote:
> Nur Syamili Abdul Majid wrote:
> > Siti Norahayu Mohd Desa wrote:
> > > Nur Sya...
Nur Syamili Abdul Majid
12:39 Pineapple HRM Bug #10540: [iOS] 5.0 Profile Functionality
Siti Norahayu Mohd Desa wrote:
> Nur Syamili Abdul Majid wrote:
> > Siti Norahayu Mohd Desa wrote:
> > > 1. Test...
Nur Syamili Abdul Majid
12:28 Internal Testing - IBAM Bug #10608 (Work Completed-End life cycle): IBAM - Side Navigation
Path : IBAM
Active screen : Message Box
Navigation : Organization Setup
Hi Najmi, kindly fix the navigation po...
Anonymous
11:47 Internal Testing - IBAM Bug #9530 (Development / Work In Progress): Message Box - System display pending approval (archive)
Hi Najmi, kindly check on this issue.
Sorry for long overdue testing.
Anonymous
11:29 Internal Testing - IBAM Bug #9520 (Work Completed-End life cycle): Message Box - IBAM admin not receive message
Tested and passed Anonymous
11:27 (Deleted) Task #10605: Add Resend SMS Notification on BIB
Added Resend SMS on BIB Siti Nursyahira Suhaimi
11:25 Internal Testing - CDB Bug #9634 (Work Completed-End life cycle): SIT_CDB User cannot access message box
Tested and passed
Anonymous
11:20 Internal Testing - IBAM Bug #9517 (Work Completed-End life cycle): Message Box - Send by criteria_all user received
Tested and passed.
Anonymous

January 24, 2020

10:04 (Deleted) Migration #10606 (Work Completed-End life cycle): Migration ID114_Migration Plan (Pentest - Rever...
Hi amy, kindly help me to review the migration plan for Pentest - Reverse Transfer.
I already give the war file to ...
Siti Balqis Othman

January 23, 2020

16:36 (Deleted) Task #10605 (Work Completed-End life cycle): Add Resend SMS Notification on BIB
Task: Able to resend SMS function at Security Token Management.
Path: BIB>IB Service Administration>Edit Security ...
Erni Suhaireen Zulkifli
16:03 KFH Change Request Task #10604 (Work Completed-End life cycle): [Change Request] FPX Limit for Non-Resident
*+Requirement:+*
To block a non-resident customer to: -
1. Maintain FPX limit more than RM10,000
2. Perform FPX ...
Lizahwati Basirun
14:28 KFH Change Request Task #10603 (Dropped-End of life cycle): [Change Request] IBSCR19013 IBG Enhancement_Defaulting I...
*+Request:+*
• To default the IBG outgoing files (mnc & mrt) with post-fix value
• To include post-fix with default...
Lizahwati Basirun
12:07 (Deleted) Bug #10596 (Work Completed-End life cycle): System Display "System Unavailable" When Checker Appr...
Issue has retest with different company and successfully passed Erni Suhaireen Zulkifli

January 22, 2020

15:41 PRODUCTION Bug #10574 (Work Completed-End life cycle): [PROD_005] : Update Remarks & Blank Punch Out
Tested & Passed. Siti Norahayu Mohd Desa
14:48 PRODUCTION Bug #10574 (Internal Testing): [PROD_005] : Update Remarks & Blank Punch Out
Khairun Nisa Tamrin
14:48 PRODUCTION Bug #10574: [PROD_005] : Update Remarks & Blank Punch Out
Siti Norahayu Mohd Desa wrote:
> System save the update Punch in remarks in Punch Out column.
Fixes for above i...
Khairun Nisa Tamrin
12:46 CR19002 - IBAM Enhancement CMS Bug #10601 (Work Completed-End life cycle): Ibam Enhancement CMS-Report
Siti Nursyahira Suhaimi
12:07 KFH Change Request Task #10600: IBSCR19015: EPF Contribution information to be reflected at account statement (SCP#5...
Yap Kah Yan wrote:
> Refer to attached document:
>
> To change as per below:
> To send the following EPF Contrib...
Yap Kah Yan
12:06 KFH Change Request Task #10600: IBSCR19015: EPF Contribution information to be reflected at account statement (SCP#5...
IB:EPF<space>Pymt Code:<1 character><space>Ctb Mo:<mmyyyy><space>EPF No:<15characters><space>Emp Name:<15characters> Yap Kah Yan
12:04 KFH Change Request Task #10600 (Dropped-End of life cycle): IBSCR19015: EPF Contribution information to be reflected...
Refer to attached document:
To change as per below:
To send the following EPF Contribution information to Core (T...
Yap Kah Yan

January 21, 2020

18:04 KFH Change Request Task #10592: [Documentation] Technical Document for Stronger 2FA
reupload Aditya Prathama
17:35 KFH Change Request Task #10592 (Review BRS): [Documentation] Technical Document for Stronger 2FA
Technical Doc Done. Please review Aditya Prathama
17:31 5. Training Compilation Issue Bug #10456 (Work Completed-End life cycle): IOS MOBILE - Login - Finger Print
Tested and passed. Anonymous
17:30 5. Training Compilation Issue Bug #10582 (Work Completed-End life cycle): IOS_Authorization_Crashed
Tested and passed. Anonymous
17:24 5. Training Compilation Issue Bug #10528 (Pending UAT Deployment): IOS - Approver List
Tested and passed. Anonymous
17:23 5. Training Compilation Issue Task #10578 (Pending UAT Deployment): IOS_Add Tnc to Jompay screen
Tested and passed. Anonymous
17:22 CR19002 - IBAM Enhancement CMS Bug #10599 (Development / Work In Progress): Welcome Pack Management Issue
Refer attached file for details. Erni Suhaireen Zulkifli
15:30 CR19002 - IBAM Enhancement CMS Bug #10598 (Development / Work In Progress): User Transaction Log Issue
**Bug:
1. Change "User Name" to be "User Alias".
2. "User Alias" field must filter by "Initiate By" value.
3. "Use...
Erni Suhaireen Zulkifli
14:39 Internal Testing - CDB Bug #9891 (Internal Testing): Mobile IIOS - System display wrong error message
after the encryption implemented. this error wont show. this error is indicator for the time is not correct. if the t... Aditya Prathama
14:33 5. Training Compilation Issue Bug #10528 (Internal Testing): IOS - Approver List
please retest with latest version Aditya Prathama
14:33 5. Training Compilation Issue Bug #10528: IOS - Approver List
added the approver label to result page Aditya Prathama
14:31 5. Training Compilation Issue Task #10578 (Internal Testing): IOS_Add Tnc to Jompay screen
Aditya Prathama
14:30 5. Training Compilation Issue Bug #10582 (Internal Testing): IOS_Authorization_Crashed
please retest and if issue still presist please contact me back Aditya Prathama
14:30 5. Training Compilation Issue Bug #10582 (Development / Work In Progress): IOS_Authorization_Crashed
Aditya Prathama
14:29 5. Training Compilation Issue Bug #10582: IOS_Authorization_Crashed
cant replicate the issue after token issue fixed Aditya Prathama
14:28 5. Training Compilation Issue Task #10578: IOS_Add Tnc to Jompay screen
please retest with latest ios version Aditya Prathama
14:27 5. Training Compilation Issue Task #10578 (Development / Work In Progress): IOS_Add Tnc to Jompay screen
root cause left offer feature which need to added. solution add the tnc for jompay and validation form Aditya Prathama
Avatar?id=1966&size=24 13:32 1. CDB_Phase 2 & 3 Development Task #9803 (Internal Testing): [P1_Extended] : To develop BOLT module which allow CDB User to do ...
Hi Athira,
Please refer *below* and use the latest installer to test.
1. Bulk Payment - 700
- Entered symbol t...
Ngoh Chee Onn
12:08 PRODUCTION Bug #10597 (New - Begin Life Cycle): [PROD_007] : My Attendance Table for responsive view not neat
Hi Hazirah,
As per discussed & sample given, please alter the table to be nice & neat.
You can ask the responsi...
Siti Norahayu Mohd Desa
12:08 KFH Projects Task #10595: [RPP Phase 2] CMS NAD Maintenance - Authorization Module
Test scope for NAD matrix:
1.change number of required approval
expected result: number of approval must be reac...
Kar Chun Siew
10:38 PRODUCTION Bug #10574 (Development / Work In Progress): [PROD_005] : Update Remarks & Blank Punch Out
Tested on Update remark failed.
System save the update Punch in remarks in Punch Out column.
Please check. TQ
Siti Norahayu Mohd Desa
10:36 PRODUCTION Bug #10572 (Work Completed-End life cycle): [PROD_003] : Late by calculate wrongly
Tested & Passed. Siti Norahayu Mohd Desa
10:32 (Deleted) Bug #10596 (Internal Testing): System Display "System Unavailable" When Checker Approve on Change...
Bramantyo Pujo Wiyono
10:32 (Deleted) Bug #10596 (Investigation): System Display "System Unavailable" When Checker Approve on Changes a...
Cause:
Broken data on user 'aaziapp'
User didt exist on TB_AM_USER
Solution:
Try on different company to make su...
Bramantyo Pujo Wiyono
10:23 PRODUCTION Bug #10571 (Work Completed-End life cycle): [PROD_002] : Remark display at double
Hi Hazirah,
Tested & Passed. Issue closed. Remarks display as it is.
Siti Norahayu Mohd Desa
10:12 (Deleted) Bug #10596 (Work Completed-End life cycle): System Display "System Unavailable" When Checker Appr...
Bug: System display "System Unavailable" when Checker approve on changes at Company Details.
Role: IBAM Checker
...
Erni Suhaireen Zulkifli
09:50 KFH Projects Task #10595 (Work Completed-End life cycle): [RPP Phase 2] CMS NAD Maintenance - Authorization Mo...
To develop below requirement:
Add authorization module for CMS (Verifier & Approver)
-Include special handling fo...
Yap Kah Yan

January 20, 2020

18:49 1. CDB_Phase 2 & 3 Development Task #9803 (Development / Work In Progress): [P1_Extended] : To develop BOLT module which allow C...
Hi chee onn, testing has been done.
Below I listed the bugs that ive found :
*1. Bulk Payment - 700*
- Ente...
Anonymous
11:11 KFH Change Request Task #10592 (Work Completed-End life cycle): [Documentation] Technical Document for Stronger 2FA
Dear Adit,
Kindly assist to prepare the Technical Document for this CR.
* Flow Diagram
* Explanation of the me...
Lizahwati Basirun

January 17, 2020

12:23 (Deleted) Bug #10590 (Work Completed-End life cycle): System display "Email Address" value under the "Email...
Tested and Passed Erni Suhaireen Zulkifli
12:20 (Deleted) Bug #10588 (Rejected - End of life cycle): Remove "None" under "Single User/Multiple Approver Sel...
Noted.
Please also take note:
When change to "None" system will delete all user under stated company.
Erni Suhaireen Zulkifli
12:16 (Deleted) Bug #10589 (Work Completed-End life cycle): Changes "Single/Multiple User" does not delete user u...
tested and successfully passed Erni Suhaireen Zulkifli
11:49 (Deleted) Bug #10587 (Work Completed-End life cycle): Remove "JSP" comment at "Module Type"
Tested and passed Erni Suhaireen Zulkifli

January 16, 2020

18:10 CR19002 - IBAM Enhancement CMS Task #10480: Ibam Enhancement CMS
Quey for module type Siti Balqis Othman
17:42 (Deleted) Bug #10590 (Internal Testing): System display "Email Address" value under the "Email Address" field.
Bramantyo Pujo Wiyono
17:42 (Deleted) Bug #10590 (Development / Work In Progress): System display "Email Address" value under the "Emai...
Bramantyo Pujo Wiyono
17:42 (Deleted) Bug #10588: Remove "None" under "Single User/Multiple Approver Selection"
'none' cannot be remove, because it use in production. Siti Nursyahira Suhaimi
17:01 (Deleted) Bug #10590 (Work Completed-End life cycle): System display "Email Address" value under the "Email...
Bug: System display "Email Address" value under the "Email Address" field.
Refer attachment for details
Path: IBA...
Erni Suhaireen Zulkifli
16:49 (Deleted) Bug #10589 (Internal Testing): Changes "Single/Multiple User" does not delete user under User Mai...
Bramantyo Pujo Wiyono
16:49 (Deleted) Bug #10589 (Investigation): Changes "Single/Multiple User" does not delete user under User Mainte...
Cause
code got merged
Resolve
Put back the code
Bramantyo Pujo Wiyono
16:47 (Deleted) Bug #10587 (Internal Testing): Remove "JSP" comment at "Module Type"
Bramantyo Pujo Wiyono
16:46 (Deleted) Bug #10587 (Development / Work In Progress): Remove "JSP" comment at "Module Type"
Bramantyo Pujo Wiyono
16:13 PRODUCTION Bug #10574 (Internal Testing): [PROD_005] : Update Remarks & Blank Punch Out
Hi Kak Ayu, Please retest at staging environment. Nur Hazirah Mohd Razali
16:12 PRODUCTION Bug #10572 (Internal Testing): [PROD_003] : Late by calculate wrongly
Hi Kak Ayu, Please retest Nur Hazirah Mohd Razali
16:11 PRODUCTION Bug #10571 (Internal Testing): [PROD_002] : Remark display at double
Hi Kak Ayu, Please retest. Nur Hazirah Mohd Razali
15:58 (Deleted) Bug #10589 (Work Completed-End life cycle): Changes "Single/Multiple User" does not delete user u...
Bug: Changes "Single/Multiple User" does not delete user under User Maintenance tab.
Path: IBAM>BIB>Company Enquir...
Erni Suhaireen Zulkifli
12:27 (Deleted) Bug #10588 (Rejected - End of life cycle): Remove "None" under "Single User/Multiple Approver Sel...
Hi,
As per subject, please remove "None" under "Single User/Multiple Approver Selection".
You may refer attachmen...
Erni Suhaireen Zulkifli
12:23 (Deleted) Bug #10587 (Work Completed-End life cycle): Remove "JSP" comment at "Module Type"
As per subject, please remove "JSP" comment at "Module Type"
You may refer attachment for details.
Path: IBAM > B...
Erni Suhaireen Zulkifli

January 15, 2020

16:40 CR19002 - IBAM Enhancement CMS Task #10480: Ibam Enhancement CMS
Welcome Pack Management Query change Action Code Siti Nursyahira Suhaimi
 