16:02 Bug #12112 (Work Completed-End life cycle): VIT_212 - Admin User Maintenance > Unlock & Suspend &...
To change 'user detail' button to 'Back' button at every result page Siti Norahayu Mohd Desa
15:56 Change #12111 (Work Completed-End life cycle): [TRC5.1]: Maker Checker Maintenance > Enquiry Page
*1.8.1.1.2 Rules, Criteria and Calculations*
To add Last Modified By & Last Modified Date in advance search.
Siti Norahayu Mohd Desa
15:47 Change #12110 (User Acceptance Test): [TRC5.1]: Participant Maintenance > Edit Participant Subscr...
*1.10.3.3.2 Rules, Criteria and Calculations*
To change validation for below field
*From Date*
Change to Read O...
Siti Norahayu Mohd Desa
13:27 Change #12108 (Finished Development): [TRC5.1]: RPT003 - List of BI-FAST participant activity
Done, and deployed to VIT server 2.0.1-beta.1 Ngoh Chee Ping
13:12 Change #12108 (Work Completed-End life cycle): [TRC5.1]: RPT003 - List of BI-FAST participant act...
*Report ID :* RPT003
*Report Name :* List of BI-FAST participant activity
*File name. :* ParticipantActivity...
Siti Norahayu Mohd Desa
12:15 Change #12107 (Work Completed-End life cycle): [TRC5.1]: Participant Audit Trail > Download
To follow download format as per SRS 15. Siti Norahayu Mohd Desa
11:27 Change #12090 (User Acceptance Test): VIT_206 - Participant User Maintenance > Create & Edit Part...
Send for User Retest Siti Norahayu Mohd Desa
11:01 Change #12091 (User Acceptance Test): VIT_197 - Content Management > Create Category for Notice &...
Tested & Passed. Send for User Testing Siti Norahayu Mohd Desa
10:50 Bug #12089 (User Acceptance Test): VIT_205 - Participant Maintenance > Edit Paricipant
Tested & Passed. Send for user testing
Fixes deployed version 2.0.1-beta.0
Siti Norahayu Mohd Desa
10:48 Bug #12092 (User Acceptance Test): VIT_207 & VIT_208 - To change validation rules become (17,2) f...
Tested & Passed. Send for user testing. Siti Norahayu Mohd Desa

July 13, 2021

01:23 Bug #12092 (Internal Testing): VIT_207 & VIT_208 - To change validation rules become (17,2) for a...
deployed on VIT v2.0.1-beta.0 Bramantyo Pujo Wiyono
01:22 Change #12091 (Finished Development): VIT_197 - Content Management > Create Category for Notice &...
deployed on VIT Bramantyo Pujo Wiyono
01:22 Change #12090 (Finished Development): VIT_206 - Participant User Maintenance > Create & Edit Part...
deployed on VIT Bramantyo Pujo Wiyono
01:21 Bug #12089 (Internal Testing): VIT_205 - Participant Maintenance > Edit Paricipant
deployed on VIT Bramantyo Pujo Wiyono
15:18 Bug #12092 (User Acceptance Test): VIT_207 & VIT_208 - To change validation rules become (17,2) f...
HI Bram as per discuss,
Please change validation rules 17,2 as below:
- User able to key in Maximum number up to 1...
Siti Norahayu Mohd Desa
14:49 Bug #12086 (User Acceptance Test): VIT_203 - Custom Report Generator
Issue have be tested & Passed in version 2.0.0-beta.24
Send for user testing
Siti Norahayu Mohd Desa
14:46 Bug #12087 (User Acceptance Test): VIT_204 - Login Page
Tested & Passed in Version : 2.0.0-beta.24
Send for user testing
Siti Norahayu Mohd Desa
12:09 Bug #12031 (Work Completed-End life cycle): VIT_183 - Participant Liquidity Status
Issue have been closed on 25/6/21 by viki Siti Norahayu Mohd Desa
12:05 Bug #12075 (Work Completed-End life cycle): VIT_202 - Custom Report Generator
Issue closed on 9/7/21 Siti Norahayu Mohd Desa
12:01 Bug #12070 (User Acceptance Test): VIT_198 - Access Control - Single Session Login
Siti Norahayu Mohd Desa
12:01 Bug #12060 (User Acceptance Test): VIT_193 - Navigation Maintenance
Siti Norahayu Mohd Desa
11:52 Bug #12057 (User Acceptance Test): VIT_194 - Authorization Log > Authorization Details : To add M...
Siti Norahayu Mohd Desa
11:14 Bug #12069 (Work Completed-End life cycle): VIT_200 - Access Control - Host Maker
Issue tested and closed in VIT issue log. Thank you. Nurul Akmal

July 12, 2021

17:49 Change #12091 (Work Completed-End life cycle): VIT_197 - Content Management > Create Category for...
To add confirmation page to standardize with others flow.
Done button change to Next button.
Siti Norahayu Mohd Desa
17:20 Change #12090 (User Acceptance Test): VIT_206 - Participant User Maintenance > Create & Edit Part...
*To change validation for Name cannot include numeric and special characters except space, dot, apostrophe instead of... Siti Norahayu Mohd Desa
17:16 Bug #12089 (User Acceptance Test): VIT_205 - Participant Maintenance > Edit Paricipant
1. To add validation for telephone no & fax number to Includes country code and area code
2. To add validation for P...
Siti Norahayu Mohd Desa
Avatar?id=1966&size=24 14:20 Bug #12086 (Internal Testing): VIT_203 - Custom Report Generator
Hi Ayu,
Changes done and deployed into Penril Server, changes will deploy into Ptap server on release version 2.0....
Ngoh Chee Onn
Avatar?id=1966&size=24 14:20 Bug #12087 (Internal Testing): VIT_204 - Login Page
Hi Ayu,
Changes done and deployed into Penril Server, changes will deploy into Ptap server on release version 2.0....
Ngoh Chee Onn

July 09, 2021

16:53 Bug #12087 (User Acceptance Test): VIT_204 - Login Page
To remove "Password cannot be less than 8 characters"
Due to security reason, BI request this validation need to b...
Siti Norahayu Mohd Desa
16:42 Bug #12086 (User Acceptance Test): VIT_203 - Custom Report Generator
*Edit/Delete Existing Template*
1. The name of field for existing template is different with current SRS
+Actu...
Siti Norahayu Mohd Desa
16:19 Change #12058 (User Acceptance Test): VIT_195 - Message Box > Message Template - Create and Edit:
tested & Passed. Send for user testing. Siti Norahayu Mohd Desa
Avatar?id=1966&size=24 11:04 Change #12058 (Internal Testing): VIT_195 - Message Box > Message Template - Create and Edit:
Hi Ayu,
Fixed done by increase the database column length, please try again.
Thank you
Ngoh Chee Onn

July 08, 2021

15:29 Change #12058 (Development / Work In Progress): VIT_195 - Message Box > Message Template - Create...
Hi Chee Onn,
Message body still not support to 2000char for create & edit.
Siti Norahayu Mohd Desa
15:11 Bug #12075 (User Acceptance Test): VIT_202 - Custom Report Generator
Tested & Passed. Send for user testing Siti Norahayu Mohd Desa
14:16 Change #12059 (User Acceptance Test): VIT_196_(TRC5.1_21) : System Maintenance > To change all re...
Tested & Passed. Pending for user retest. Siti Norahayu Mohd Desa

July 07, 2021

Avatar?id=1966&size=24 19:14 Bug #12075 (Internal Testing): VIT_202 - Custom Report Generator
Hi Ayu,
Fixed done and deployed into Penril server, fixed will deploy into Ptap server at release beta 23
Thank...
Ngoh Chee Onn
Avatar?id=1966&size=24 19:12 Change #12058 (Internal Testing): VIT_195 - Message Box > Message Template - Create and Edit:
Hi Ayu,
This issues due to database column length not enough to stored and throw error page. Issue fixed by increa...
Ngoh Chee Onn
16:00 Bug #12031 (User Acceptance Test): VIT_183 - Participant Liquidity Status
Siti Norahayu Mohd Desa
15:58 Bug #12069 (Pending Customer Feedback): VIT_200 - Access Control - Host Maker
Nurul Akmal
15:58 Bug #12060 (Pending Customer Feedback): VIT_193 - Navigation Maintenance
Nurul Akmal
15:44 Change #12059 (Internal Testing): VIT_196_(TRC5.1_21) : System Maintenance > To change all result...
Fixed, will be deploy in beta.23 tomorrow. Ngoh Chee Ping
15:29 Bug #12075 (Development / Work In Progress): VIT_202 - Custom Report Generator
Hi Chee Onn,
Fixes have been test and ok. but if Column name is empty, system automatic kick out.
Siti Norahayu Mohd Desa
15:22 Bug #12031 (Work Completed-End life cycle): VIT_183 - Participant Liquidity Status
Tested & Passed. Send for User testing Siti Norahayu Mohd Desa
14:50 Change #12058 (Development / Work In Progress): VIT_195 - Message Box > Message Template - Create...
Hi Chee Onn,
After test on fill max length to Template Name , and click on Confirm button, page die and auto logo...
Siti Norahayu Mohd Desa
14:43 Change #12059 (Development / Work In Progress): VIT_196_(TRC5.1_21) : System Maintenance > To cha...
Hi Cp,
After click on Back button, page display blank for both Password parameter.
Siti Norahayu Mohd Desa
14:36 Bug #12057 (Work Completed-End life cycle): VIT_194 - Authorization Log > Authorization Details :...
Both Field have been added and tested successfully.
Send for user testing
Siti Norahayu Mohd Desa

July 06, 2021

Avatar?id=1966&size=24 18:03 Bug #12031 (Internal Testing): VIT_183 - Participant Liquidity Status
Hi Akmal,
Issue fixed and deployed into Penril server, fixed will deploy into ptap server in release beta 22.
T...
Ngoh Chee Onn
Avatar?id=1966&size=24 18:02 Bug #12075 (Internal Testing): VIT_202 - Custom Report Generator
Hi Ayu,
Validation at least one column is required added. Added display title even when data in table.
Both had ...
Ngoh Chee Onn
13:45 Bug #12057 (Internal Testing): VIT_194 - Authorization Log > Authorization Details : To add Maker...
Fixed and deployed to server in beta.21 . Please retest by create new changes, old records is not able to update it. Ngoh Chee Ping
13:43 Bug #12060 (Internal Testing): VIT_193 - Navigation Maintenance
Fixed issue 1,2,3 and deployed to server in beta.21.
But for issue 4, did not found any problem. Please take note ...
Ngoh Chee Ping
13:30 Bug #12075 (Work Completed-End life cycle): VIT_202 - Custom Report Generator
*Actual Result:*
1.Able to save new report without any column display.
2.Page blank after download
*Expected:*...
Nurul Akmal
13:21 Bug #12031 (Development / Work In Progress): VIT_183 - Participant Liquidity Status
VIT_201:
Re-open due to user hit error when click on Threshold details.
*Expected:*
To trim Participant ID and...
Nurul Akmal

July 05, 2021

Avatar?id=1966&size=24 17:09 Bug #12070 (Pending Customer Feedback): VIT_198 - Access Control - Single Session Login
Hi Akmal,
The single sign on function had been disable in Ptap server, due to high usage of the same user for test...
Ngoh Chee Onn
Avatar?id=1966&size=24 17:05 Bug #12069 (Internal Testing): VIT_200 - Access Control - Host Maker
Hi Akmal,
Changes had been done and deployed into Penril Server, changes will deploy to ptap server at release bet...
Ngoh Chee Onn
13:32 Bug #12070 (Closed - End of life cycle): VIT_198 - Access Control - Single Session Login
User can login to Portal Application in different browser from the same device at the same time.
*Expected Result:...
Nurul Akmal
13:14 Bug #12069 (Work Completed-End life cycle): VIT_200 - Access Control - Host Maker
System display Force change password screen for Host Maker
*Expected Result:*
Force change password screen only a...
Nurul Akmal

July 02, 2021

18:36 Change #12059: VIT_196_(TRC5.1_21) : System Maintenance > To change all result page button to BAC...
Fixed and deployed to server. Please retest. Ngoh Chee Ping
Avatar?id=1966&size=24 14:26 Change #12058 (Internal Testing): VIT_195 - Message Box > Message Template - Create and Edit:
Hi Ayu,
Changes done and deployed into Penril Server, changes will deploy to Ptap server in release beta 21.
Th...
Ngoh Chee Onn
Avatar?id=1966&size=24 14:25 Change #12058 (Development / Work In Progress): VIT_195 - Message Box > Message Template - Create...
Ngoh Chee Onn
12:22 Bug #12060 (Closed - End of life cycle): VIT_193 - Navigation Maintenance
*+Issue 1+*
Field Shortcut and Display icon:
Maker update Shorcut or Display icon, but not reflected after checker ...
Nurul Akmal
11:05 Change #12059 (User Acceptance Test): VIT_196_(TRC5.1_21) : System Maintenance > To change all re...
# To change of button 'Password details" into "back" in both section "Password Parameters"
# To change of button 'Ar...
Siti Norahayu Mohd Desa
10:36 Change #12058 (User Acceptance Test): VIT_195 - Message Box > Message Template - Create and Edit:
*To change Validation rules for Template Name & Message Body as per below:*
+Template Name :+
Alphanumeric with s...
Siti Norahayu Mohd Desa
10:29 Bug #12057 (Work Completed-End life cycle): VIT_194 - Authorization Log > Authorization Details :...
To add Maker IP Address & Checker IP Address in details screen as per srs Siti Norahayu Mohd Desa

June 30, 2021

18:24 Bug #12039 (Work Completed-End life cycle): Authorization > Approval > Participant Authorization
Issue tested and closed in VIT issue log on 30/06/2021. Nurul Akmal
18:24 Bug #12027 (Work Completed-End life cycle): VIT_175 - Proxy History
Issue tested and closed in VIT issue log on 30/06/2021. Nurul Akmal
18:23 Bug #12049 (Work Completed-End life cycle): VIT_191- Unlocked Admin User not changed status from ...
Issue tested and closed in VIT issue log on 30/06/2021. Nurul Akmal
17:06 Bug #12049 (Internal Testing): VIT_191- Unlocked Admin User not changed status from Locked to Normal
fixed and deployed to server, please retest. Ngoh Chee Ping
Avatar?id=1966&size=24 16:37 Bug #12027 (Internal Testing): VIT_175 - Proxy History
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server at release beta 20.
Than...
Ngoh Chee Onn
16:19 Bug #12033 (Work Completed-End life cycle): VIT_186 - Admin User Maintenance
Issue tested and closed in VIT issue log on 30/06/2021. Nurul Akmal
16:02 Bug #12049 (Work Completed-End life cycle): VIT_191- Unlocked Admin User not changed status from ...
*Step to reproduce:*
1. Login as Host Maker then access menu Admin User Maintenance
2. Find admin user with stat...
Nurul Akmal
10:51 Bug #12028 (Work Completed-End life cycle): VIT_179 - Authorization - Authorization Log
Issue tested and closed in VIT issue log on 25/06/2021. Nurul Akmal
10:32 Bug #12034 (Work Completed-End life cycle): VIT_187 - Password for Host User
Issue tested and closed in VIT issue log on 30/06/2021. Nurul Akmal
10:32 Bug #12041 (Work Completed-End life cycle): VIT_188 - Admin User Maintenance > Admin User Enquiry
Issue tested and closed in VIT issue log on 30/06/2021. Nurul Akmal
10:26 Bug #12042 (Work Completed-End life cycle): Admin User Enquiry > User Status
Issue tested and closed in VIT issue log on 30/06/2021. Nurul Akmal

June 29, 2021

18:12 Bug #12027 (Development / Work In Progress): VIT_175 - Proxy History
Discussed with user, they request to standardize Secondary ID wording as in system uses wording Secondary Value and S... Nurul Akmal
13:43 Bug #12042 (Internal Testing): Admin User Enquiry > User Status
Fixed and deployed to beta.18. Please retest Ngoh Chee Ping
13:42 Bug #12041 (Internal Testing): VIT_188 - Admin User Maintenance > Admin User Enquiry
Fixed and deployed to beta.18. Please retest Ngoh Chee Ping
13:42 Bug #12033 (Internal Testing): VIT_186 - Admin User Maintenance
Fixed and deployed to beta.18. Please retest Ngoh Chee Ping

June 28, 2021

Avatar?id=1966&size=24 19:16 Bug #12039 (Internal Testing): Authorization > Approval > Participant Authorization
Hi Akmal,
Fixed had been deployed into Penril server, fixed will deployed to Ptap server in release beta 18.
Th...
Ngoh Chee Onn
17:27 Bug #12042 (Work Completed-End life cycle): Admin User Enquiry > User Status
System not displayed Admin user with status "Deleted" when input field "User Status" = "Deleted" in Advanced Search s... Nurul Akmal
16:53 Bug #12041 (Work Completed-End life cycle): VIT_188 - Admin User Maintenance > Admin User Enquiry
Field "User Status" in Advanced Search screen contain possible values not match with requirement in SRS document.
...
Nurul Akmal
16:21 Bug #12027 (Work Completed-End life cycle): VIT_175 - Proxy History
Tested successfully and closed in VIT log on 25/06/2021.
Thank you
Nurul Akmal
16:20 Bug #12029 (Work Completed-End life cycle): VIT_180 - Transaction history
Tested successfully and closed in VIT log on 25/06/2021.
Thank you
Nurul Akmal
16:20 Bug #12032 (Work Completed-End life cycle): VIT_185 - Participant User Maintenance
Tested successfully and closed in VIT log on 25/06/2021.
Thank you
Nurul Akmal
16:19 Bug #12031 (Work Completed-End life cycle): VIT_183 - Participant Liquidity Status
Tested successfully and closed in VIT log on 25/06/2021.
Thank you
Nurul Akmal
16:19 Bug #12030 (Work Completed-End life cycle): VIT_182 - System Maintenance - Add Tax Charges
Tested successfully and closed in VIT log on 25/06/2021.
Thank you
Nurul Akmal
16:18 Bug #11898 (Work Completed-End life cycle): VIT_063 - FD024- View Audit Trail
Tested successfully and closed in VIT log on 25/06/2021.
Thank you
Nurul Akmal
16:18 Bug #12025 (Work Completed-End life cycle): VIT_174 - Email Notification
Tested successfully and closed in VIT log on 25/06/2021.
Thank you
Nurul Akmal
16:17 Bug #12026 (Work Completed-End life cycle): VIT_175 - Create Participant User
Tested successfully and closed in VIT log on 25/06/2021.
Thank you
Nurul Akmal
14:07 Bug #12039 (Work Completed-End life cycle): Authorization > Approval > Participant Authorization
# Login as Host Maker initiate activity under Participant module (e.g: Edit Participant User).
# Login as Host Check...
Nurul Akmal
Avatar?id=1966&size=24 10:59 Bug #12034 (Internal Testing): VIT_187 - Password for Host User
Hi Akmal,
As per today 28/6 tested no issue to locked the user with incorrect 3 time password, please try again.
...
Ngoh Chee Onn

June 25, 2021

20:58 Bug #12027: VIT_175 - Proxy History
already fix and redploy on VIT Bramantyo Pujo Wiyono
Avatar?id=1966&size=24 20:21 Bug #12029 (Internal Testing): VIT_180 - Transaction history
Hi Akmal,
Changes done and deployed into Penril server, changes will deploy to Ptap server in release beta 17
T...
Ngoh Chee Onn
19:32 Bug #12027 (Development / Work In Progress): VIT_175 - Proxy History
Issue still persist. wildcard not working. Nurul Akmal
19:26 Bug #12029 (Development / Work In Progress): VIT_180 - Transaction history
Not working for searching Participant From / Participant To
Input Participant From or Participant To then search -...
Nurul Akmal
19:24 Bug #12028 (Development / Work In Progress): VIT_179 - Authorization - Authorization Log
At Authorizer Log enquiry screen, failed search by Activity. Nurul Akmal
Avatar?id=1966&size=24 17:42 Bug #12032 (Internal Testing): VIT_185 - Participant User Maintenance
Hi Akmal,
Fixed done and will deploy to Ptap server in release beta 16
Thank you
Ngoh Chee Onn
17:24 Bug #12034 (Work Completed-End life cycle): VIT_187 - Password for Host User
Failed Login Attempt already set = 3.. But host user more than 3 wrong password stiil not locked Nurul Akmal
17:12 Bug #12033 (Work Completed-End life cycle): VIT_186 - Admin User Maintenance
Download Report in Excel and PDF at Admin User Maintenance module, Table is not parallel.
_see screenshot_
Nurul Akmal
17:09 Bug #12028: VIT_179 - Authorization - Authorization Log
on release beta.16 Bramantyo Pujo Wiyono
17:02 Bug #12032 (Work Completed-End life cycle): VIT_185 - Participant User Maintenance
Email for unlock participant.
*Actual:*
Your CI Portal account has been reset.
Please login using information be...
Nurul Akmal
Avatar?id=1966&size=24 17:01 Bug #12031 (Internal Testing): VIT_183 - Participant Liquidity Status
Hi Akmal,
Fixed done and deployed into Penril server, fixed will deploy to Ptap server in release beta 16 or 15.1....
Ngoh Chee Onn
Avatar?id=1966&size=24 17:01 Bug #12029 (Internal Testing): VIT_180 - Transaction history
Hi Akmal,
Changes done and deployed into Penril server, changes will deploy to Ptap server in release beta 16 or 1...
Ngoh Chee Onn
Avatar?id=1966&size=24 17:00 Bug #12030 (Internal Testing): VIT_182 - System Maintenance - Add Tax Charges
Hi Akmal,
Fixed done and deployed into Penril server, fixed will deploy to Ptap server in release beta 16 or 15.1....
Ngoh Chee Onn
16:56 Bug #12027: VIT_175 - Proxy History
on release beta.16 Bramantyo Pujo Wiyono
16:56 Bug #11898: VIT_063 - FD024- View Audit Trail
on release beta.16 Bramantyo Pujo Wiyono
16:27 Bug #12031 (Work Completed-End life cycle): VIT_183 - Participant Liquidity Status
*Issue 1:*
Download not working - Excel and PDF
*Issue 2:*
Click Threshold, error: Error while performing your ...
Nurul Akmal
14:55 Bug #11980 (Work Completed-End life cycle): VIT_120 - Participant User Maintenance
Issue closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
14:54 Bug #12017 (Work Completed-End life cycle): VIT_167 - Liquidity Management
Issue tested and closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
14:51 Bug #12007 (Work Completed-End life cycle): VIT_157 - User Profile Update
Issue closed in VIT issue log on 24/06/2021. Nurul Akmal
14:46 Bug #11983 (Work Completed-End life cycle): VIT_124 - Admin Report Membership - List of BI-FAST P...
Issue tested and closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
14:45 Bug #11966 (Work Completed-End life cycle): VIT_100 - Proxy Enquiry
Issue tested and closed in VIT issue log on 25/06/2021.
Thank you.
Nurul Akmal
14:30 Bug #12030 (Work Completed-End life cycle): VIT_182 - System Maintenance - Add Tax Charges
Create a new setup for Tax Charge. After approved, then the last record replaced with the new one created.
*Exp...
Nurul Akmal
14:13 Bug #12029 (Work Completed-End life cycle): VIT_180 - Transaction history
To change field type from Dropdown to Dropdown suggestion for below fields:
* Participant From
* Participant To
Nurul Akmal
14:09 Bug #12028 (Work Completed-End life cycle): VIT_179 - Authorization - Authorization Log
To change *Category Name* to *Activity* at
* Authorization Log Enquiry
* Detail Authorization Log
Nurul Akmal
12:00 Bug #12027 (Work Completed-End life cycle): VIT_175 - Proxy History
Wildcard not working for searching Alias id and secondary value Nurul Akmal
Avatar?id=1966&size=24 11:32 Bug #12025 (Internal Testing): VIT_174 - Email Notification
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server in release beta 15.
Than...
Ngoh Chee Onn
Avatar?id=1966&size=24 11:32 Bug #12026 (Internal Testing): VIT_175 - Create Participant User
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server in release beta 15.
Than...
Ngoh Chee Onn
10:42 Bug #12026 (Work Completed-End life cycle): VIT_175 - Create Participant User
Create PUM --> Click Next --> Click Back
After click Back --> User Access changed to unticked
Nurul Akmal

June 24, 2021

18:53 Bug #11898: VIT_063 - FD024- View Audit Trail
Hi Bram,
Reported issue have been successful retest and passed.
but for Edit Message Template Activity, there's n...
Siti Norahayu Mohd Desa
17:41 Bug #11899 (Work Completed-End life cycle): VIT_064 - FD024- View Audit Trail
Agree to follow srs and issue closed in VIT issue log.
Thank you.
Nurul Akmal
17:38 Bug #12004 (Work Completed-End life cycle): VIT_155 - Subscription Maintenance
Issue tested and closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
17:37 Bug #11998 (Work Completed-End life cycle): VIT_145 - Participant Audit Trail
Issue tested and closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
17:36 Bug #12010 (Work Completed-End life cycle): VIT_156 - Transaction History
Issue tested and closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
17:35 Bug #11967 (Work Completed-End life cycle): VIT_106 - Content Management
Issue tested and closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
17:34 Bug #12014 (Work Completed-End life cycle): VIT_170 - Reset Password
Issue tested and closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
17:34 Bug #12011 (Work Completed-End life cycle): VIT_161 - Proxy Enquiry
Issue tested and closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
17:31 Bug #11993 (Work Completed-End life cycle): VIT_138 - PROXY ADDRESS STATUS REPORT
Issue tested and closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
17:23 Bug #11990 (Work Completed-End life cycle): VIT_129 - Content Management
Tested & passed.
Thank you.
Nurul Akmal
17:17 Bug #12015 (Work Completed-End life cycle): VIT_158 - Participant Liquidity Status
Nurul Akmal
17:17 Bug #12015: VIT_158 - Participant Liquidity Status
Issue tested and closed in VIT issue log on 24/06/2021.
Thank you.
Nurul Akmal
16:51 Bug #12025 (Work Completed-End life cycle): VIT_174 - Email Notification
BI logo in email notification via gmail and web mail OK but when open it via outlook the size of the logo so big. Nurul Akmal
11:45 Bug #11998: VIT_145 - Participant Audit Trail
on release beta.14 Bramantyo Pujo Wiyono
Avatar?id=1966&size=24 11:42 Bug #12016 (Work Completed-End life cycle): VIT_165 - Liquidity Management Enquiry
Hi Akmal,
As information from Lee Yong, this case will be KIV, due to Hub was not ready on this stage.
Thank you
Ngoh Chee Onn
11:18 Bug #11898: VIT_063 - FD024- View Audit Trail
on release beta.14 Bramantyo Pujo Wiyono
11:18 Bug #11990 (Internal Testing): VIT_129 - Content Management
on release beta.14 Bramantyo Pujo Wiyono
Avatar?id=1966&size=24 09:41 Bug #12017 (Internal Testing): VIT_167 - Liquidity Management
Hi Akmal,
Fixed done for issue 2 and deployed into Penril Server, fixed will deploy to Ptap server at release beta...
Ngoh Chee Onn

June 23, 2021

18:57 Bug #11993 (Internal Testing): VIT_138 - PROXY ADDRESS STATUS REPORT
Already confirm with Ayu, blank page during search, suspected tested during the memory full. Pending user to retest. Nurul Akmal
18:41 Bug #11983 (Internal Testing): VIT_124 - Admin Report Membership - List of BI-FAST Participant Ac...
Updated to Server, please retest. Ngoh Chee Ping
18:40 Bug #11998 (Development / Work In Progress): VIT_145 - Participant Audit Trail
User re-open due to:
The colon issue have been fixed but there is an extra blank page.
Case : Member Activity re...
Nurul Akmal
18:31 Bug #12017 (Development / Work In Progress): VIT_167 - Liquidity Management
As discussed, to fix on issue 2 regarding Debiting and Crediting Participant field not reset.... Nurul Akmal
18:17 Bug #11993: VIT_138 - PROXY ADDRESS STATUS REPORT
Please provide the step to reproduce, tested with search criteria or no search criteria also no problem Ngoh Chee Ping
15:49 Bug #11990 (Development / Work In Progress): VIT_129 - Content Management
Found another issue,
After click on add bank button, at Select Bank screen, not tick to any Bank checkbox, then cli...
Nurul Akmal
Avatar?id=1966&size=24 15:15 Bug #12015 (Internal Testing): VIT_158 - Participant Liquidity Status
Hi Akmal,
Changes had been done and deployed into Penril server, changes will deploy into Ptap server in release b...
Ngoh Chee Onn
14:23 Bug #12004: VIT_155 - Subscription Maintenance
on release beta.14 Bramantyo Pujo Wiyono
13:40 Bug #11898 (Development / Work In Progress): VIT_063 - FD024- View Audit Trail
... Nurul Akmal
Avatar?id=1966&size=24 12:54 Bug #12014 (Internal Testing): VIT_170 - Reset Password
Hi Akmal,
Fixed done and deployed to Penril Server, fixed will deploy to Ptap server at release beta 13
Thank you
Ngoh Chee Onn
12:21 Task #11895 (Work Completed-End life cycle): VIT_061 - FD099 - Authorizer Log - Transaction Fee M...
Issue successfully tested and closed on 17/06/2021. Nurul Akmal
12:01 Bug #11990 (Internal Testing): VIT_129 - Content Management
on release beta.13
note: for the issue system logged out when customize and then added bank, if the issue still oc...
Bramantyo Pujo Wiyono
Avatar?id=1966&size=24 09:30 Bug #12007 (Internal Testing): VIT_157 - User Profile Update
Hi Akmal,
Own profile update have difference behavior with the user maintenance, which own profile update does not...
Ngoh Chee Onn

June 22, 2021

Avatar?id=1966&size=24 19:19 Bug #11966 (Internal Testing): VIT_100 - Proxy Enquiry
Hi Akmal,
Fixed done and deployed to Penril Server, fixed will deploy to Ptap server at release beta 13
Thank you
Ngoh Chee Onn
Avatar?id=1966&size=24 19:19 Bug #12011 (Internal Testing): VIT_161 - Proxy Enquiry
Hi Akmal,
Fixed done and deployed to Penril Server, fixed will deploy to Ptap server at release beta 13
Thank you
Ngoh Chee Onn
Avatar?id=1966&size=24 19:19 Bug #12017 (Internal Testing): VIT_167 - Liquidity Management
Hi Akmal,
Fixed done and deployed to Penril Server, fixed will deploy to Ptap server at release beta 13
Thank you
Ngoh Chee Onn
19:06 Bug #11982 (Work Completed-End life cycle): VIT_121 - Participant Audit Trail
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
19:05 Bug #11935 (Work Completed-End life cycle): VIT_087 - Download Participant Audit Trail (Detail)
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:59 Bug #11905 (Work Completed-End life cycle): VIT_065 - FD064- Download Current Liquidity Position
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:58 Bug #11965 (Work Completed-End life cycle): VIT_101 - Proxy Enquiry
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:58 Bug #11968 (Work Completed-End life cycle): VIT_113 - FD114-Proxy Enquiry
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:57 Bug #11975 (Work Completed-End life cycle): VIT_116 - Participant Report Transaction Fee
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:56 Bug #11980 (Pending Customer Feedback): VIT_120 - Participant User Maintenance
User to confirm on what wording Resend Email or Resend Email - Confirm / Resend Email - Result Nurul Akmal
18:55 Bug #11976 (Work Completed-End life cycle): VIT_115 - Participant User Maintenance - User access
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:54 Bug #11985 (Work Completed-End life cycle): VIT_126 - Message Box
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:52 Bug #11992 (Work Completed-End life cycle): VIT_137 - System Maintenance - Edit data Offloading
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:51 Bug #11981 (Work Completed-End life cycle): VIT_122 - Email notification
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:51 Bug #11997 (Work Completed-End life cycle): VIT_140 - Message Box
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:50 Bug #11993 (Development / Work In Progress): VIT_138 - PROXY ADDRESS STATUS REPORT
Tested by Ayu on 22 Jun 21:
After click on Search button, page blank both PDF and Excel.
Nurul Akmal
18:48 Bug #11983 (Development / Work In Progress): VIT_124 - Admin Report Membership - List of BI-FAST ...
Tested by Ayu on 22 Jun 21:
Print setup still not display repeated header and pagination
Nurul Akmal
18:46 Bug #11984 (Work Completed-End life cycle): VIT_125 - RPT015 : Fee Calculation Detail Report - Da...
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:45 Bug #11991 (Work Completed-End life cycle): VIT_131 - wrong pagination at report
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:43 Bug #12007 (Development / Work In Progress): VIT_157 - User Profile Update
Tested by Ayu on 22 Jun 12 :
Re-open this issue due to, error message prompt after click on Yes button. Please stand...
Nurul Akmal
18:34 Bug #12013 (Work Completed-End life cycle): VIT_166 - Authorization > Pending
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:34 Bug #12018 (Work Completed-End life cycle): VIT_172 - Create Participant User
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:33 Bug #11996 (Work Completed-End life cycle): VIT_144 - Participant Admin Maker - Create Participan...
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:32 Bug #11898 (Work Completed-End life cycle): VIT_063 - FD024- View Audit Trail
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:31 Enhancement #11974 (Work Completed-End life cycle): VIT_114 - Proxy Enquiry
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:31 Bug #11998 (Work Completed-End life cycle): VIT_145 - Participant Audit Trail
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
18:30 Bug #11999 (Work Completed-End life cycle): VIT_146 - Audit Trail - Audit Trail Download Report ...
Issue successfully tested and closed in VIT issue log on 22/06/2021.
Thank you.
Nurul Akmal
Avatar?id=1966&size=24 14:32 Bug #12016 (Development / Work In Progress): VIT_165 - Liquidity Management Enquiry
Hi All,
The error message "others" is response from HUB API and this error message was written in HUB API integrat...
Ngoh Chee Onn
14:10 Bug #12011: VIT_161 - Proxy Enquiry

Query to table using the below value as mapping
Alias Type:
01 = Mobile phone no
02 = Email Address
Seconda...
Tan Lee Yong
13:23 Bug #11999 (Internal Testing): VIT_146 - Audit Trail - Audit Trail Download Report - PDF and Excel
on release beta.12 Bramantyo Pujo Wiyono
13:21 Bug #11878 (Work Completed-End life cycle): VIT_032 - FD090 - Authorization List
Tested & Passed. TQ Bram Siti Norahayu Mohd Desa
12:53 Task #11972 (Work Completed-End life cycle): VIT_102 - Participant Audit Trail - Download Partic...
Issue have been closed so, Remain naming as BI-FAST PARTICIPANT ACTIVITY. Siti Norahayu Mohd Desa
12:12 Bug #11998 (Internal Testing): VIT_145 - Participant Audit Trail
on release beta.12 Bramantyo Pujo Wiyono
12:06 Enhancement #11974 (Internal Testing): VIT_114 - Proxy Enquiry
Nurul Akmal
11:49 Bug #11898 (Internal Testing): VIT_063 - FD024- View Audit Trail
on release beta.12 Bramantyo Pujo Wiyono
Avatar?id=1966&size=24 11:45 Bug #11996 (Internal Testing): VIT_144 - Participant Admin Maker - Create Participant User
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server at release beta 12
Thank...
Ngoh Chee Onn
Avatar?id=1966&size=24 11:45 Bug #12018 (Internal Testing): VIT_172 - Create Participant User
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server at release beta 12
Thank...
Ngoh Chee Onn
Avatar?id=1966&size=24 11:44 Bug #12013 (Internal Testing): VIT_166 - Authorization > Pending
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server at release beta 12
Thank...
Ngoh Chee Onn
Avatar?id=1966&size=24 11:44 Bug #12010 (Internal Testing): VIT_156 - Transaction History
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server at release beta 12
Thank...
Ngoh Chee Onn
Avatar?id=1966&size=24 11:41 Bug #12007 (Internal Testing): VIT_157 - User Profile Update
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server at release beta 12
Thank...
Ngoh Chee Onn
10:49 Enhancement #11974 (Finished Development): VIT_114 - Proxy Enquiry
on release beta.12
i update on system Alias ID on proxy enquiry is mandatory and min length is 4
Bramantyo Pujo Wiyono
10:36 Bug #11996 (Development / Work In Progress): VIT_144 - Participant Admin Maker - Create Participa...
*Current error message:*
Participant User Full Name cannot include numeric and special character except space @ ./'...
Nurul Akmal
09:37 Bug #11989 (Work Completed-End life cycle): VIT_128 -Transaction History Inquiry
Tested successfully & closed in VIT issue log. Nurul Akmal
09:33 Bug #11991 (Internal Testing): VIT_131 - wrong pagination at report
Try again. The report template did not update to server on yesterday deployment. Ngoh Chee Ping

June 21, 2021

19:29 Bug #11986 (Work Completed-End life cycle): VIT_119 - Custom Report Generator
Issue has been tested and closed in VIT issue log on 21/06/2021. Nurul Akmal
19:27 Bug #12018 (Work Completed-End life cycle): VIT_172 - Create Participant User
Administrator create PUC. when click confirm display Error
*Expected:*
Administrator successfully created Partic...
Nurul Akmal
19:16 Bug #12017 (Work Completed-End life cycle): VIT_167 - Liquidity Management
*Issue 1:*
Authorization > Pending - details : created date
Authorization > Approval - details : created date
Sh...
Nurul Akmal
18:59 Bug #12016 (Work Completed-End life cycle): VIT_165 - Liquidity Management Enquiry
Liquidity Top - Authorization for Approval
Need to consider to display an informative error message when system ra...
Nurul Akmal
18:55 Bug #12015 (Work Completed-End life cycle): VIT_158 - Participant Liquidity Status
To change Participant field type Dropdown to Text Box with Dropdown Suggestion
Nurul Akmal
18:40 Bug #11991 (Development / Work In Progress): VIT_131 - wrong pagination at report
Tested by Ayu 21/06/2021:
Reported issues still persist.
Nurul Akmal
18:08 Bug #12014 (Work Completed-End life cycle): VIT_170 - Reset Password
BI logo must be at the below in the notification email for reset password participant users
Nurul Akmal
17:59 Bug #12013 (Work Completed-End life cycle): VIT_166 - Authorization > Pending
Authorization - Pending for Participant user maintenance should be DD/MM/YYYY format
1. Create Participant User
2....
Nurul Akmal
15:47 Bug #12011 (Work Completed-End life cycle): VIT_161 - Proxy Enquiry
+*Issue 1:*+
Advance Search not working at
*Proxy Enquiry:*
By Alias ID > Alias Type : not working search by Ema...
Nurul Akmal
15:26 Bug #12010 (Work Completed-End life cycle): VIT_156 - Transaction History
To change total credit to :
Total Credit Amount
Total Credit Volume
Nurul Akmal
14:05 Bug #12007 (Work Completed-End life cycle): VIT_157 - User Profile Update

To standardize Mobile No field validation in
* Host Profile Update
* Admin User Maintenance - Create
* Admin Us...
Nurul Akmal
Avatar?id=1966&size=24 12:46 Bug #11982 (Internal Testing): VIT_121 - Participant Audit Trail
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy into Ptap server in release beta 11.
Th...
Ngoh Chee Onn
Avatar?id=1966&size=24 11:14 Bug #11986 (Internal Testing): VIT_119 - Custom Report Generator
Hi Akmal,
Fixed done and deployed into Penril Server, Fixed will deploy to Ptap server at release beta 11.
Than...
Ngoh Chee Onn
11:04 Bug #11917 (Work Completed-End life cycle): VIT_082 - FD083 - Change Own Password
Tested successfully and closed in VIT issue log. Nurul Akmal
10:59 Bug #11982 (Development / Work In Progress): VIT_121 - Participant Audit Trail
Tested on 18 Jun 21 by Ayu:
There is a bugs for Activity ""Authorize Reset Password Participant User"" in drop down ...
Nurul Akmal

June 18, 2021

22:22 Enhancement #11896 (Work Completed-End life cycle): VIT_062 - FD099 - Authorization > Approval
Siti Norahayu Mohd Desa
22:21 Bug #11973 (Work Completed-End life cycle): VIT_103 - Participant Audit Trail - Download Particip...
HI Akmal,
This issue can be closed. Based on Angga, just follow SRS 23.
Siti Norahayu Mohd Desa
22:18 Task #11972: VIT_102 - Participant Audit Trail - Download Participant Audit Trail
OK esok kita tnya Angga for clarification. Siti Norahayu Mohd Desa
19:01 Bug #11984 (Internal Testing): VIT_125 - RPT015 : Fee Calculation Detail Report - Daily , Weekly ...
Fixed, you may verify the report at 13/06/2021. Ngoh Chee Ping
18:50 Bug #11991 (Internal Testing): VIT_131 - wrong pagination at report
Fixed, will be deploy on beta.11 Ngoh Chee Ping
18:47 Bug #11983 (Internal Testing): VIT_124 - Admin Report Membership - List of BI-FAST Participant Ac...
Fixed, will be deploy on beta.11 Ngoh Chee Ping
18:46 Bug #11993 (Internal Testing): VIT_138 - PROXY ADDRESS STATUS REPORT
Fixed, will be deploy on beta.11 Ngoh Chee Ping
18:32 Bug #11897 (Work Completed-End life cycle): VIT_060 - FD109-Transaction History Enquiry
Issue tested successfully and closed in VIT issue log. Nurul Akmal
18:20 Bug #12004 (Work Completed-End life cycle): VIT_155 - Subscription Maintenance
For create fee maintenance (on us), "amount" field can have negative value. There should be additional validation rul... Nurul Akmal
Avatar?id=1966&size=24 17:31 Bug #11997 (Internal Testing): VIT_140 - Message Box
Hi Akmal,
3 reported issues fixed and deployed into Penril Server, fixed will deploy to Ptap server on release bet...
Ngoh Chee Onn
Avatar?id=1966&size=24 17:30 Bug #11996 (Internal Testing): VIT_144 - Participant Admin Maker - Create Participant User
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server on release beta.11
Thank...
Ngoh Chee Onn
16:49 Bug #11990 (Development / Work In Progress): VIT_129 - Content Management
Tested by Ayu 18/06/2021.
* System clear date after select customize audience and system throw date is empty again a...
Nurul Akmal
14:25 Bug #11999 (Work Completed-End life cycle): VIT_146 - Audit Trail - Audit Trail Download Report ...
typo FRO should be FROM
Test Case : Message Box
Nurul Akmal
14:06 Bug #11998 (Work Completed-End life cycle): VIT_145 - Participant Audit Trail
MEMBER ACTIVITY REPORT
To remove the colon (:), since there is a colon on the next page
Nurul Akmal
13:10 Bug #11997 (Work Completed-End life cycle): VIT_140 - Message Box
+*Issue 1:*+
Search field not reset.
*Steps to reproduce:*
# Go to Notification.
# Input any word at Filter Sub...
Nurul Akmal
12:41 Bug #11996 (Work Completed-End life cycle): VIT_144 - Participant Admin Maker - Create Participan...
Validation Rule For Participant Full Name must follow General Rule - SRS Portal Nurul Akmal
12:32 Bug #11898 (Development / Work In Progress): VIT_063 - FD024- View Audit Trail
Hi Bram,
New findings, Audit Trail for module message box didn't display IP address.
* Send message
* Restore m...
Nurul Akmal
12:02 Bug #11981 (Internal Testing): VIT_122 - Email notification
on release beta.10 Bramantyo Pujo Wiyono
11:56 Bug #11935 (Internal Testing): VIT_087 - Download Participant Audit Trail (Detail)
on release beta.10 Bramantyo Pujo Wiyono
11:55 Bug #11992: VIT_137 - System Maintenance - Edit data Offloading
on release beta.10 Bramantyo Pujo Wiyono
10:54 Bug #11993 (Work Completed-End life cycle): VIT_138 - PROXY ADDRESS STATUS REPORT

Click Proxy Enquiry --> Click Search, then system display all data. but when we download the report all data doesnt...
Nurul Akmal
10:44 Bug #11989 (Internal Testing): VIT_128 -Transaction History Inquiry
on release beta.10 Bramantyo Pujo Wiyono
10:43 Bug #11992 (Work Completed-End life cycle): VIT_137 - System Maintenance - Edit data Offloading
Data OffLoading Date should be DD/MM/YYYY format Nurul Akmal
10:36 Bug #11990: VIT_129 - Content Management
on release beta.10 Bramantyo Pujo Wiyono
09:41 Bug #11936 (Work Completed-End life cycle): VIT_091 - Participant User Maintenance
Successfully tested and issue closed in VIT issue log. Nurul Akmal
09:39 Bug #11892 (Work Completed-End life cycle): VIT_057 - FD109 - Transaction History Enquiry
Successfully tested and issue closed in VIT issue log. Nurul Akmal

June 17, 2021

Avatar?id=1966&size=24 19:01 Bug #11982 (Internal Testing): VIT_121 - Participant Audit Trail
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will be deploy into Ptap server in release beta 10.
...
Ngoh Chee Onn
19:00 Bug #11991 (Work Completed-End life cycle): VIT_131 - wrong pagination at report
wrong pagination, page more than 1 but currently state page 1 from 1 at below report:
* PROXY ADDRESS DETAIL REPO...
Nurul Akmal
18:45 Bug #11967 (Internal Testing): VIT_106 - Content Management
on release beta.10 Bramantyo Pujo Wiyono
18:29 Bug #11990 (Work Completed-End life cycle): VIT_129 - Content Management
1. create content (NOTICES & DOCUMENT) and selected Target Audience = Customize and then added bank.
2. Click Save...
Nurul Akmal
18:12 Bug #11989 (Work Completed-End life cycle): VIT_128 -Transaction History Inquiry
Initiation Date From and Initiation Date To should be DD/MM/YYYY format
Nurul Akmal
17:44 Bug #11984 (Development / Work In Progress): VIT_125 - RPT015 : Fee Calculation Detail Report - D...
For weekly report failed. The field still receiver doesnt change to Source Nurul Akmal
17:13 Bug #11982 (Development / Work In Progress): VIT_121 - Participant Audit Trail
Tested, but requested to add below activity inside drop down list.
* Authorize Dispute Transaction
* First Time...
Nurul Akmal
Avatar?id=1966&size=24 16:57 Bug #11985 (Internal Testing): VIT_126 - Message Box
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server by release beta.10
Than...
Ngoh Chee Onn
Avatar?id=1966&size=24 16:56 Bug #11976 (Internal Testing): VIT_115 - Participant User Maintenance - User access
Hi Akmal,
Fixed done and deployed into Penril Server, fixed will deploy to Ptap server by release beta.10
Than...
Ngoh Chee Onn
15:49 Bug #11984 (Internal Testing): VIT_125 - RPT015 : Fee Calculation Detail Report - Daily , Weekly ...
Already fixed this on 16/06/2021, for daily you can get today report, for weekly just regenerate on date 13/06/2021. ... Ngoh Chee Ping
14:50 Bug #11986 (Work Completed-End life cycle): VIT_119 - Custom Report Generator
TG2110_03_Report_Customize
1. Blank screen after click download.
2. Logout after refresh the page
Nurul Akmal
14:32 Bug #11985 (Work Completed-End life cycle): VIT_126 - Message Box
Typo on Message word. To reword Massage to Message.
Typo on Message word. To reword Massage to Message at
Authori...
Nurul Akmal
14:09 Bug #11984 (Work Completed-End life cycle): VIT_125 - RPT015 : Fee Calculation Detail Report - Da...
To change Receiver to Source Nurul Akmal
14:06 Bug #11983 (Work Completed-End life cycle): VIT_124 - Admin Report Membership - List of BI-FAST P...
When print List of BI-FAST Participant Activity report in excel format, we must adjust the page first before print. T... Nurul Akmal
Avatar?id=1966&size=24 13:56 Bug #11982 (Internal Testing): VIT_121 - Participant Audit Trail
Hi Akmal,
Fixed done and deployed into Penril Server, fixed had been deploy into Ptap server in release beta.9
...
Ngoh Chee Onn
13:50 Bug #11932 (Work Completed-End life cycle): VIT_086 - FD085 - View Participant Audit Trail (Detail)
Issue tested successfully and closed in VIT issue log. Nurul Akmal
13:31 Task #11972 (Pending Review): VIT_102 - Participant Audit Trail - Download Participant Audit Trail
Buk Ayu,
mohon verifikasi.
Thank you.
Nurul Akmal
13:30 Bug #11973 (Pending Review): VIT_103 - Participant Audit Trail - Download Participant Audit Trail
Buk Ayu,
mohon verifikasi.
Thank you.
Nurul Akmal
13:20 Bug #11935: VIT_087 - Download Participant Audit Trail (Detail)
Found Activity display null for below activities:
1. Unlock
2. Authorize Reset Participant User
3. Suspend
4. ...
Nurul Akmal
13:00 Bug #11967 (Development / Work In Progress): VIT_106 - Content Management
For Create and Edit Content - Document, currently system hit error
*Expiry Date is an invalid date/time format.
Ef...
Nurul Akmal
11:14 Bug #11982 (Work Completed-End life cycle): VIT_121 - Participant Audit Trail
Search audit trail log for dispute transaction. Input filter criteria for field "Activity" by select "Dispute Transac... Nurul Akmal

June 16, 2021

Avatar?id=1966&size=24 19:38 Bug #11980 (Internal Testing): VIT_120 - Participant User Maintenance
Hi Akmal,
Fixed done and deployed into Penril Server. Fixed will deploy to Ptap server on tomorrow release should ...
Ngoh Chee Onn
16:25 Bug #11981 (Work Completed-End life cycle): VIT_122 - Email notification
Cosmetic.
BI logo must be at the below in the notification email for create participant users
Nurul Akmal
16:21 Bug #11980 (Work Completed-End life cycle): VIT_120 - Participant User Maintenance
Cosmetic
Resend Email.
To rename title of details,confirm and result screen.
*Current :*
Participant user Mai...
Nurul Akmal
Avatar?id=1966&size=24 16:10 Bug #11973: VIT_103 - Participant Audit Trail - Download Participant Audit Trail
Hi Akmal,
This request is not valid, before state and after state should not appear in participant audit trail lis...
Ngoh Chee Onn
Avatar?id=1966&size=24 15:28 Task #11972: VIT_102 - Participant Audit Trail - Download Participant Audit Trail
Hi Akmal,
The correct name should be "BI-FAST PARTICIPANT ACTIVITY", please follow to the SRS 23 document.
Than...
Ngoh Chee Onn
15:25 Bug #11975 (Internal Testing): VIT_116 - Participant Report Transaction Fee
This had been fix and updated to server. Please get today report to verify Ngoh Chee Ping
13:51 Bug #11935: VIT_087 - Download Participant Audit Trail (Detail)
on release beta.9
note:
- to retest to see detail on after before still showing json format with "{}".
- to retest...
Bramantyo Pujo Wiyono
13:47 Bug #11905: VIT_065 - FD064- Download Current Liquidity Position
our all download behavior will be like this, click download then automaticly download the file report Bramantyo Pujo Wiyono
13:22 Bug #11892 (Internal Testing): VIT_057 - FD109 - Transaction History Enquiry
yesterday deployment had some issue, please try retest on release beta.8 Bramantyo Pujo Wiyono
13:07 Bug #11937 (Work Completed-End life cycle): VIT_092 - Participant User Maintenance
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
13:04 Bug #11904 (Work Completed-End life cycle): VIT_048 - FD023 - Search Audit Trail - SLA Management
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
13:03 Bug #11885 (Work Completed-End life cycle): VIT_044 - FD007 - Edit Admin User
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
12:56 Bug #11911 (Work Completed-End life cycle): VIT_068 - FD070 - Create Participant User
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
12:55 Bug #11912 (Work Completed-End life cycle): VIT_073 - Participant user Maintenance
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
12:54 Bug #11938 (Work Completed-End life cycle): VIT_099 - Dispute Enquiry
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
12:51 Bug #11939 (Work Completed-End life cycle): VIT_076 - Create Participant User
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
12:51 Task #11964 (Work Completed-End life cycle): VIT_077 - System Maintenance - Password Parameters
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
12:49 Bug #11919 (Work Completed-End life cycle): VIT_085 - FD083 - Change Own Password
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
12:48 Bug #11918 (Work Completed-End life cycle): VIT_083 - FD083 - Change Own Password
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
12:47 Bug #11916 (Work Completed-End life cycle): VIT_081 - FD083 - Change Own Password
Issue tested successfully and closed in issue log on 16/06/2021. Nurul Akmal
Avatar?id=1966&size=24 12:34 Bug #11973 (Internal Testing): VIT_103 - Participant Audit Trail - Download Participant Audit Trail
Hi Akmal,
Issue fixed and deploy into Penril Server. Fixed will deploy into Ptap server at 2pm release beta 8.
...
Ngoh Chee Onn
Avatar?id=1966&size=24 12:32 Bug #11917 (Internal Testing): VIT_082 - FD083 - Change Own Password
Hi Akmal,
Issue fixed and deploy into Penril Server. Fixed will deploy into Ptap server at 2pm release beta 8.
...
Ngoh Chee Onn
12:26 Bug #11968 (Internal Testing): VIT_113 - FD114-Proxy Enquiry
Bramantyo Pujo Wiyono
12:25 Bug #11965: VIT_101 - Proxy Enquiry
on release beta.8 Bramantyo Pujo Wiyono
12:19 Bug #11899 (Pending Customer Feedback): VIT_064 - FD024- View Audit Trail
Nurul Akmal
11:55 Bug #11899: VIT_064 - FD024- View Audit Trail
To re-confirm with BI for the last time on which term to use again, in order to standardise the naming for both modul... Siti Norahayu Mohd Desa
Avatar?id=1966&size=24 10:04 Bug #11892: VIT_057 - FD109 - Transaction History Enquiry
Hi Bram,
Please help check this, i found out the wild card search already added and i checked the mercurial histo...
Ngoh Chee Onn
09:51 Bug #11976 (Work Completed-End life cycle): VIT_115 - Participant User Maintenance - User access
# Login as Participant Admin Maker.
# Access to menu Participant User Maintenance then click on search button to d...
Nurul Akmal
 